Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A0-1A
EE+42.5"E +42"E GFI+42.5"E GFI+42.5"S ES EE SE E+36"E+36"EAEDFEC +40 +56+40 +56+42.5GFI RSV FEC HP OFFICE 05.295 CONFERENCE 05.340 CONFERENCE 05.110 OFFICE 05.270 TRAINING 05.225 FA OFFICE 05.285 FA OFFICE 05.280 FA OFFICE 05.275 CONFERENCE 05.445 STORAGE 05.440 OFFICE 05.435 OFFICE 05.430 OFFICE 05.470 OFFICE 05.475 OPEN OFFICE 05.460 OPEN OFFICE 05.480 FA OFFICE 05.490 FA OFFICE 05.495 OFFICE 05.315 OPEN OFFICE 05.520 PRINT ROOM 05.530 RECEPTION 05.105 CASHIER 05.545 OFFICE 05.535 OFFICE 05.115 OFFICE 05.325 OPEN OFFICE 05.485 BREAKROOM 05.505 MEN RESTROOM 05.500 CONFERENCE 05.350 OFFICE 05.330 OFFICE 05.320 OFFICE 05.310 OFFICE 05.305 OFFICE 05.300 OFFICE 05.265 OFFICE 05.260 OFFICE 05.255 OFFICE 05.250 OFFICE 05.245 OFFICE 05.240 OFFICE 05.235 OFFICE 05.230 OFFICE 05.335 WOMEN RESTROOM 05.510 PRINT AREA 05.515 PANTRY 05.450 ELEVATOR LOBBY 05.100 STAIRS 05.000 STAIRS 05.005 OFFICE 05.425 CORRIDOR 05.465 OPEN OFFICE 05.540 01/A0-1A01/A0-1B01/A0-1A01/A0-1BE R +38"AV E E E E E EE E6 E6 D DD DD D6DD DD DD DD DD DD DD DD DD6D6D6D6D6D6D6 D6 D6D6 D DD6 D D D6 D D D6 D D D6 D D D6 D D D6 D D D6 D D D 6 D D D D D DD D D LV J J LV J EE EE E E6 E E E6 E D D D D D 6 D6LV D D D DD 6 D6D D D6 D D D6 D D D6 DDD D D D E E DDE E E E E6 E E E6 E E E6 E E E6 E E E6 E E E6 E EE 6 E EE 6EE E6 EE E6 E E E E E E E E6 EE E6 E E E6 EE E6 E E E 6 EE E6 E E E 6 E E E6 EE E6 EE E6 E E E EEEEEE E6 E EE 6E E E EE 6E R +38"R +38"6 R +38"AV R +38"R +38"6 EEE EE E E EE E E E E E E E EE E E +54"± E T E+70" E T E E EE 6E +94"E+94"EE+62"4 ET E E E+62"EEE EE R +80"AV R +80" R R R +80" AV R +80" E +90"CATV E +90"E6 ECATV E E EJ EJ E6R +80"AVR +80"J JEEEE E6 E E6 E E AV E E6R +62" AV R +62" E AV E E AV EECATVEECATV 2 E T E +70" AV E +70" E AV E E +44" E+44" E ECP 2 EMIC EEEE EEEE EJ R+46"R6 +46"E+46"R+46"R 6 +46"E 2 E 2 E +60" E +72"LV E E EE ER +40"R +40"6 E E E E 6 E EE6E EE 6E E E6E EE E E EE EEE CATVE CATV E +30"CATV E +62" CATV E +74"CATV E +62"CATVE +16" CATV E +34"CATVE +54"±CATV E +70" CATV E +76"CATV E +34"CATVE +22"CATV E+76"E+34"ECATVE +34"CATV E 100.3 100.3 100.2100.2 100.2 100.2 100.2 100.2 100.2 100.2 102 TYP 102 TYP 101 100 100.2 100.2 100.1 103 104 104105 AEDFECRSV FEC FEC FEC AEDOFFICE 05.435 Plot Date: 8/25/2020 12:02:44 PM Filename: \\nelson.com\corpdata\Proj\bank Of America\IN\20.0000681.000-bofa Indianapolis Mlwm 5th Floor Refresh\DRAWINGS\A-I\3_CD\INW-044 BofA Indianapolis MLWM 5th Floor Refresh A0-1A & A0-1B.dwg User: Edgardo Rivera-Ortiz Device: _AutoCAD PDF (General Documentation).pc3 PenTable: _NELSON-HALF.ctbA0-1A DEMOLITION PLAN - SIDE A Proj. No: Drawn By: Project Manager: ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED ON SITE BY THE CONTRACTOR AND SUB-CONTRACTORS PRIOR TO PERFORMING THE WORK. THE PROJECT MANAGER SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. © NELSON WORLDWIDE, LLC 2020 ALL RIGHTS RESERVED Designer: Reviewed By: Approved By: Key Plan: Nelco Architecture, Inc. a licensed affiliate 4'0 8' 16' Scale: PROJECT LOCATION Phone: 30 West Monroe Street - Suite 200 Chicago, IL 60603-2409 (312) 263-6605 (312) 276-4340 Phone: 20.0000681.000 MJL ERO ERO/MBM MJL/VPD VPD Date:No: Description: By: Client: Sheet Title: Consultant: Project Title & Address: Seal: Sheet Number: INW-044 BofA Indianapolis MLWM 5th Floor Refresh 510 96th Street Indianapolis, IN 46240 OWNER'S PROJECT MANAGER Jones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL4-540-04-55 Chicago, IL 60661 T: 312.909.2139 E: leslie.soto@am.jll.com MEP ENGINEER Integrated Engineering Consultants, Inc. (IEC) Tim Vining 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T: 216.901.6711 E: tim.vining@iec-inc.cc GENERAL CONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.977.9255 E: tlc@midamericacontracting.com ISSUE FOR EARLY DEMOLITION 1 ERO 07.24.2020 ISSUE FOR ENGINEERING 2 ERO 07.31.2020 ISSUE FOR LONG LEAD ITEMS 3 ERO 07.31.2020 ISSUE FOR PERMIT 4 ERO 08.25.2020 KEYNOTES: 100. REMOVE EXISTING DOOR AND HARDWARE. GC TO CONFIRM IF EXISTING DOOR PANELS AND WOOD CAN BE SALVAGED, REFINISHED (TO MATCH WD-1, TBD) AND REINSTALLED. COORDINATE WITH OWNER AND ARCHITECT. 100.1. EXISTING WOOD FRAME TO BE REMOVED AND REFINISHED TO MATCH WD-1 (TBD) 100.2. EXISTING HM FRAME TO REMAIN AND PREPPED FOR NEW PAINT TO MATCH ADJACENT WALL. 100.3. EXISTING WOOD PIVOT DOORS WITH NO FRAME TO BE RE-FINISHED, IF POSSIBLE. REFER TO CONSTRUCTION PLANS AND A9-1 FOR FURTHER INFO. 101. STONE TILE FLOORING AND BASE IN THIS AREA NOT IN CONTRACT; DO NOT DEMO. 102. REPORT LOCATIONS AND CONFIGURATION OF ALL PARTIAL HEIGHT WORKSTATION POWER/DATA INFEEDS TO ARCHITECT FOR COORDINATION WITH NEW POWER/DATA PLANS (TYP). 103. EXISTING AED CABINET TO BE REMOVED AND EQUIPMENT TO BE RELOCATED; PREP WALL TO RECEIVE NEW SEMI-RECESSED CABINET; SEE AN-5 AND A1-1A FOR FURTHER INFORMATION. 103. EXISTING FEC CABINET TO BE REMOVED AND EQUIPMENT TO BE RELOCATED; PREP WALL TO RECEIVE NEW SEMI-RECESSED CABINET; SEE AN-5 AND A1-1A FOR FURTHER INFORMATION. 104. EXISTING WOOD CASED OPENING TO BE REMOVED, PATCH & REPAIR OPENING TO CREATE NEW GYPSUM BOARD CASED OPENING. NOT IN CONTRACT EXISTING PARTITION TO REMAIN EXISTING CONSTRUCTION TO BE REMOVED ROOM TAG CENTERLINE EXISTING DOOR TO REMAIN EXISTING DOOR TO BE REMOVED INDICATES EXISTING TO REMAIN INDICATES TO BE RELOCATED INDICATES TO BE REMOVED (DEMOLISHED) DEMOLITION PLAN LEGEND: CL DEMOLITION GENERAL NOTES: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REMOVAL OF EXISTING CONSTRUCTION AND THE STORAGE AND REMOVAL OF SAID CONSTRUCTION, AND SHALL MAINTAIN THE AREA OF CONSTRUCTION IN A CLEAN AND ORDERLY CONDITION WITH DAILY REMOVAL OF DEBRIS. THE SITE SHALL BE LEFT BROOM CLEAN. COORDINATE REMOVALS OF OTHER TRADES; REFER TO ENGINEERING DRAWINGS FOR ADDITIONAL SCOPE. COORDINATE REMOVAL OF DEBRIS WITH MUNICIPAL AND BUILDING OWNER'S RULES AND REQUIREMENTS. 2. THE CONTRACTOR SHALL DO ALL CUTTING, PATCHING AND REPAIRING REQUIRED TO PERFORM THE WORK INDICATED ON THE DRAWINGS. ALL CUTTING AND REMOVALS SHALL BE DONE NEATLY. 3. ALL ITEMS TO BE REMOVED AND SCHEDULED FOR REINSTALLATION, OR TO BE RETURNED TO THE BUILDING SHALL BE PROTECTED, CLEAN AND FREE OF DEFECTS. FOR ALL ITEMS SCHEDULED FOR REMOVAL AND REINSTALLATION, CONTRACTOR SHALL VERIFY AND PROVIDE DOCUMENTATION OF THE CONDITION AND FUNCTIONALITY OF ITEM(S) PRIOR TO REMOVAL. ANY DAMAGE TO ITEM(S) NOT DOCUMENTED SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 4. ALL EXISTING SURFACES AND EQUIPMENT TO REMAIN SHALL BE FULLY PROTECTED FROM DAMAGE. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DAMAGE AND SHALL MAKE REPAIRS REQUIRED AT NO ADDITIONAL COST TO THE OWNER. 5. ERECT AND MAINTAIN DUSTPROOF BARRIERS TO PREVENT THE SPREAD OF DUST, FUMES, SMOKE, ETC. TO OTHER PARTS OF THE FLOOR OR BUILDING. UPON COMPLETION OF WORK, REMOVE BARRIERS AND REPAIR DAMAGED SURFACES TO MATCH ADJACENT. PROTECT HVAC SYSTEM FROM DUST & DEBRIS. CONTRACTOR TO PROVIDE FILTER MEDIA TO COVER THE MAIN RETURN AIR GRILLES. PROVIDE NEW AIR FILTERS AT MECHANICAL UNITS AT THE COMPLETION OF CONSTRUCTION. 6. COMPLY WITH APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS PERTAINING TO SAFETY OF PERSONS, PROPERTY AND ENVIRONMENTAL PROTECTION. ANNOYANCES AND DISTURBANCES TO OTHER OCCUPANTS, PERSONNEL AND EMPLOYEES SHALL BE KEPT TO THE MINIMUM NECESSARY FOR THE PERFORMANCE OF THE WORK. 7. CONTRACTOR TO COORDINATE SHUTDOWN OF BUILDING SYSTEMS WITH THE BUILDING PRIOR TO IMPLEMENTATION. 8. CONTRACTOR TO PROVIDE TEMPORARY PARTITIONS TO COMPLY WITH EGRESS REQUIREMENTS DURING CONSTRUCTION. TEMPORARY PARTITIONS TO BE FIRE RATED WHERE REQUIRED. 9. PROTECT EXISTING WINDOW TREATMENTS. CONTRACTOR TO REPLACE ANY BLINDS/DRAPES DAMAGED DURING DEMOLITION/CONSTRUCTION. 10. NO STRUCTURAL ELEMENTS SHALL BE REMOVED. SCOPE NOTES: 1. EXISTING CEILING GRID AND TILES AND LIGHTING FIXTURES TO REMAIN, U.N.O. 2. REMOVE ABANDONED WIRING BACK TO ELECTRICAL PANELS OR THE JUNCTION BOX WHEN THE WHOLE CIRCUIT IS NOT SCHEDULED TO BE REMOVED. COORDINATE REUSE OF FREED CIRCUITS. PROVIDE TEMPORARY LIGHT AND POWER DURING CONSTRUCTION. CONTRACTOR SHALL PROVIDE ELECTRICAL MAKE-SAFE DURING REMOVALS AND CONSTRUCTION. 3. REMOVE EXISTING FINISH MATERIALS (INCLUDING WALLCOVERING, FLOOR FINISHES, WALL BASE, ETC) THROUGHOUT, U.N.O. PREPARE SURFACES FOR NEW FINISHES. 4. REMOVE DOORS, FRAMES, AND HARDWARE AS NOTED, U.N.O. - COORDINATE MATERIALS TO BE RETURNED WITH BUILDING OWNER. SAVE HARDWARE FOR POSSIBLE REUSE. 5. REMOVE MASTIC AND ADHESIVES DOWN TO THE FLOOR STRUCTURE. REMOVE ANY FLASH PATCH OR OTHER FLOOR LEVELING IN POOR CONDITION. 6. REMOVE ALL EXISTING MATERIALS WHICH CAUSE RISES OR DEPRESSIONS IN FLOORING SURFACE, SUCH AS FASTENERS, OUTLET CORES, COVER PLATES, RESILIENT FLOOR COVERINGS, CARPET PAD, FLASH PATCH, ADHESIVES, CONCRETE FILL, PLYWOOD, ETC. 7. REMOVE ALL CABINETRY, SIGNAGE, CORNER GUARDS, SHELVING, EQUIPMENT, EXPOSED BLOCKING, WALL MOUNTED ACCESSORIES (CHALKBOARDS, WALL MOUNTED COAT HOOKS, SIGNAGE, PICTURES, ETC.) AS SHOWN U.N.O. AND APPLIANCES; EXISTING PLUMBING INFRASTRUCTURE TO REMAIN AND BE RE-PURPOSED FOR NEW CONSTRUCTION. 8. REMOVE ALL PLUMBING FIXTURES. 9. REMOVAL OF TELEPHONE AND DATA CABLING TO BE COORDINATED WITH OWNER'S TECHNOLOGY PROJECT MANAGER. 10. REMOVE ALL FURNITURE, UNO. COORDINATE STORAGE, DISPOSAL OR REUSE WITH OWNER. DO NOT DISCARD EXISTING FILE CABINETS; FILE CABINETS WILL BE REPAINTED AND RE-PURPOSED; COORDINATE WITH OWNER, ARCHITECT AND FURNITURE DEALER. -- 1/8" = 1'-0" DEMOLITION PLAN - SIDE A1 A0-1A SIDE A E R D ROOM NAME ROOM# 09/16/20