Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A0-1B
FEC FEC FEC AEDCONFERENCE 05.340 CONFERENCE 05.110 OFFICE 05.160 TRAINING 05.225 CONFERENCE 05.445 STORAGE 05.440 OFFICE 05.435 OFFICE 05.430 RECEPTION 05.105 WORKROOM 05.360 OFFICE 05.355 CASHIER 05.545 SECURE STORAGE 05.375 OFFICE 05.400 OPEN OFFICE 05.390 OFFICE 05.115 ELECT. 05.050 STORAGE 05.365 NER 05.370 OPEN OFFICE 05.415 SECURE STORAGE 05.395 CONFERENCE 05.350 OFFICE 05.335 OFFICE 05.125 OFFICE 05.130 OFFICE 05.135 OFFICE 05.140 OFFICE 05.145 OFFICE 05.150 OFFICE 05.155 OFFICE 05.175 OFFICE 05.170 OFFICE 05.405 OPEN OFFICE 05.410 OFFICE 05.165 OFFICE 05.215 OFFICE 05.210 OFFICE 05.205 OFFICE 05.200 OFFICE 05.195 OFFICE 05.190 OFFICE 05.185 OFFICE 05.180 PANTRY 05.450 PRINT AREA 05.385 ELEVATOR LOBBY 05.100 OPEN OFFICE 05.345 OFFICE 05.120 STAIRS 05.005 STAIRS 05.010 OFFICE 05.425 OFFICE 05.220 CORRIDOR 05.465 R MW C TR01/A0-1A01/A0-1B01/A0-1A01/A0-1BR +38"AV D DD DD DD DD6D6 D6 D6D D D DD DD DD DD6D6 D6 D6D D D DD DD DD DD6D6 D6 D6D D D DD DD DD DD6D6 D6 D6D D D DD DD6D6D D D DD LV J JD DD6 D DD6 D DD DD DD DD6 D6 D6 D6 D D D6 D D D6 D D D6 D D D6 D D D6 D D D6 D D D6 D D D6 D D D D D6 D D E EE D D DDE E E 6 E E E 6 E E E 6 E E E 6 E E E 6 E E E 6 E EE 6E E EE 6E E EE6E E E E 6 EEE E EE E6 EE E6 E E E 6 EE E6 E E EE EEE EE 6E EE E6 E EE E6 E EE E6 E EE 6E E EE 6E E E E 6 EE E6 EEE EE 6E EE 6E EE 6E E E 6R +38"R +38"6 R +38"AV R +38"R +38"6 E EEEE EE6E E E E E EE E E E E E E E E E ET E E E EEE EE R +80"AV R +80" R R R +80" AV R +80"E E E6 E E E6 E +90"CATV E +90"E6 ECATV E E EJ EJ E6E +90"CATV E +90"R +80"AVR +80"E E E EETEE +34"CATVEE JEJEJE E E E E6 E E AV E E6R +62" AV R +62" E AV E E AV EECATV EECATV 2 E T E +70" AV E +70" E AV E E +44" E +44" E ECP 2 EMIC EE EEEEEEE EJ E +60" E +72"LV E E EE E E E 6 E EE6EEE6E E 6 E E EE E +16"CATV E +39"CATV E +34" CATV E +34" CATV E +34"CATV E +34"CATV E CATVECATVE +34"CATVE +34" CATVE+34"R+46"R6 +46"R+46"R6 +46"E +46" E 100.3 100.3 100.2 101 100.2 100.2 102 TYP 102 TYP 102 TYP 100.1 100.2 100.2 100.2 100.2 100.2 100.2 103 105 104 106 106 AEDFECRSV FEC FEC FEC AEDOFFICE 05.435 Plot Date: 8/25/2020 12:02:51 PM Filename: \\nelson.com\corpdata\Proj\bank Of America\IN\20.0000681.000-bofa Indianapolis Mlwm 5th Floor Refresh\DRAWINGS\A-I\3_CD\INW-044 BofA Indianapolis MLWM 5th Floor Refresh A0-1A & A0-1B.dwg User: Edgardo Rivera-Ortiz Device: _AutoCAD PDF (General Documentation).pc3 PenTable: _NELSON-HALF.ctbA0-1B DEMOLITION PLAN - SIDE B Proj. No: Drawn By: Project Manager: ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED ON SITE BY THE CONTRACTOR AND SUB-CONTRACTORS PRIOR TO PERFORMING THE WORK. THE PROJECT MANAGER SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. © NELSON WORLDWIDE, LLC 2020 ALL RIGHTS RESERVED Designer: Reviewed By: Approved By: Key Plan: Nelco Architecture, Inc. a licensed affiliate 4'0 8' 16' Scale: PROJECT LOCATION Phone: 30 West Monroe Street - Suite 200 Chicago, IL 60603-2409 (312) 263-6605 (312) 276-4340 Phone: 20.0000681.000 MJL ERO ERO/MBM MJL/VPD VPD Date:No: Description: By: Client: Sheet Title: Consultant: Project Title & Address: Seal: Sheet Number: INW-044 BofA Indianapolis MLWM 5th Floor Refresh 510 96th Street Indianapolis, IN 46240 OWNER'S PROJECT MANAGER Jones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL4-540-04-55 Chicago, IL 60661 T: 312.909.2139 E: leslie.soto@am.jll.com MEP ENGINEER Integrated Engineering Consultants, Inc. (IEC) Tim Vining 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T: 216.901.6711 E: tim.vining@iec-inc.cc GENERAL CONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.977.9255 E: tlc@midamericacontracting.com ISSUE FOR EARLY DEMOLITION 1 ERO 07.24.2020 ISSUE FOR ENGINEERING 2 ERO 07.31.2020 ISSUE FOR LONG LEAD ITEMS 3 ERO 07.31.2020 ISSUE FOR PERMIT 4 ERO 08.25.2020 DEMOLITION GENERAL NOTES: 1.REFER TO SHEET A0-1A FOR APPLICABLE GENERAL NOTES. SCOPE NOTES: 1.REFER TO SHEET A0-1A FOR APPLICABLE SCOPE NOTES. 1/8" = 1'-0" DEMOLITION PLAN - SIDE B1 A0-1B SIDE B NOT IN CONTRACT EXISTING PARTITION TO REMAIN EXISTING CONSTRUCTION TO BE REMOVED ROOM TAG CENTERLINE EXISTING DOOR TO REMAIN EXISTING DOOR TO BE REMOVED INDICATES EXISTING TO REMAIN INDICATES TO BE RELOCATED INDICATES TO BE REMOVED (DEMOLISHED) DEMOLITION PLAN LEGEND: CL E R D KEYNOTES: 100. REMOVE EXISTING DOOR AND HARDWARE. GC TO CONFIRM IF EXISTING DOOR PANELS AND WOOD CAN BE SALVAGED, REFINISHED (TO MATCH WD-1, TBD) AND REINSTALLED. COORDINATE WITH OWNER AND ARCHITECT. 100.1. EXISTING WOOD FRAME TO BE REMOVED AND REFINISHED TO MATCH WD-1 (TBD) 100.2. EXISTING HM FRAME TO REMAIN AND PREPPED FOR NEW PAINT TO MATCH ADJACENT WALL. 100.3. EXISTING WOOD PIVOT DOORS WITH NO FRAME TO BE RE-FINISHED, IF POSSIBLE. REFER TO CONSTRUCTION PLANS AND A9-1 FOR FURTHER INFO. 101. STONE TILE FLOORING AND BASE IN THIS AREA NOT IN CONTRACT; DO NOT DEMO. 102. REPORT LOCATIONS AND CONFIGURATION OF ALL PARTIAL HEIGHT WORKSTATION POWER/DATA INFEEDS TO ARCHITECT FOR COORDINATION WITH NEW POWER/DATA PLANS (TYP). 103. SURFACE MOUNTED AED CABINET TO BE REMOVED AND AED EQUIPMENT TO BE RELOCATED. REFER TO AN-5 & A1-1B FOR FURTHER INFO. 104. EXISTING APPLIANCES TO BE REUSED IN NEW WORKROOM CONFIGURATION; REFER TO A3-1B AND ELEVATION FOR FURTHER INFO. PROTECT DURING DEMOLITION WORK. 105. EXISTING COPIER TO BE RELOCATED TO PRINT AREA 05.385. 103. EXISTING FEC CABINET TO BE REMOVED AND EQUIPMENT TO BE RELOCATED; PREP WALL TO RECEIVE NEW SEMI-RECESSED CABINET; SEE AN-5 AND A1-1B FOR FURTHER INFORMATION. -- ROOM NAME ROOM# 09/16/20