Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A4-1A
WELLNESS 05.435 FECFECAED S ESE SERSV HP OFFICE 05.295 CONFERENCE 05.340 CONFERENCE 05.110 OFFICE 05.270 TRAINING 05.225 FA OFFICE 05.285 FA OFFICE 05.280 FA OFFICE 05.275 CONFERENCE 05.445 STORAGE 05.440 OFFICE 05.430 OFFICE 05.470 OFFICE 05.475 OPEN OFFICE 05.460 OPEN OFFICE 05.480 FA OFFICE 05.490 FA OFFICE 05.495 OFFICE 05.315 OPEN OFFICE 05.520 PRINT ROOM 05.530 RECEPTION 05.105 CASHIER 05.545 OFFICE 05.535 OFFICE 05.115 OFFICE 05.325 OPEN OFFICE 05.485 BREAKROOM 05.505 MEN RESTROOM 05.500 CONFERENCE 05.350 OFFICE 05.330 OFFICE 05.320 OFFICE 05.310 OFFICE 05.305 OFFICE 05.300 OFFICE 05.265 OFFICE 05.260 OFFICE 05.255 OFFICE 05.250 OFFICE 05.245 OFFICE 05.240 OFFICE 05.235 OFFICE 05.230 OFFICE 05.335 WOMEN RESTROOM 05.510 PRINT AREA 05.515 PANTRY 05.450 ELEVATOR LOBBY 05.100 STAIRS 05.000 STAIRS 05.005 OFFICE 05.425 CORRIDOR 05.465 OPEN OFFICE 05.540 01/A4-1A01/A4-1B01/A4-1A01/A4-1BCPT2 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT2 CPT2 CPT2 CPT2 EX TL EX TLEX TL CPT1 CPT1 CPT1 CPT1 CPT1 CPT1 RF1 RF1 RF1 PT2WC2 WC3WC1WC1WC1 WC1 WC2WC2WC2WC2WC1WT1 CPT3 CPT3 CPT3 EX TLEX TL 400.1 400.1 WC4 RF1 400.2 400.2 400.2 EX TLEX TLEX VCT 400.2EX VCT 400.2EX VCT400.2 PT2 WC4 400.1 EX TL EX TL 400.1 AEDFEC FEC FECFECAED RSV Plot Date: 8/26/2020 9:11:46 AM Filename: \\nelson.com\corpdata\Proj\bank Of America\IN\20.0000681.000-bofa Indianapolis Mlwm 5th Floor Refresh\DRAWINGS\A-I\3_CD\INW-044 BofA Indianapolis MLWM 5th Floor Refresh A4-1A & A4-1B.dwg User: Edgardo Rivera-Ortiz Device: DWG To PDF.pc3 PenTable: _NELSON-HALF.ctbA4-1A FINISH PLAN - SIDE A Proj. No: Drawn By: Project Manager: ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED ON SITE BY THE CONTRACTOR AND SUB-CONTRACTORS PRIOR TO PERFORMING THE WORK. THE PROJECT MANAGER SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. © NELSON WORLDWIDE, LLC 2020 ALL RIGHTS RESERVED Designer: Reviewed By: Approved By: Key Plan: Nelco Architecture, Inc. a licensed affiliate 4'0 8' 16' Scale: PROJECT LOCATION Phone: 30 West Monroe Street - Suite 200 Chicago, IL 60603-2409 (312) 263-6605 (312) 276-4340 Phone: 20.0000681.000 MJL ERO ERO/MBM MJL/VPD VPD Date:No: Description: By: Client: Sheet Title: Consultant: Project Title & Address: Seal: Sheet Number: INW-044 BofA Indianapolis MLWM 5th Floor Refresh 510 96th Street Indianapolis, IN 46240 OWNER'S PROJECT MANAGER Jones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL4-540-04-55 Chicago, IL 60661 T: 312.909.2139 E: leslie.soto@am.jll.com MEP ENGINEER Integrated Engineering Consultants, Inc. (IEC) Tim Vining 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T: 216.901.6711 E: tim.vining@iec-inc.cc GENERAL CONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.977.9255 E: tlc@midamericacontracting.com ISSUE FOR EARLY DEMOLITION 1 ERO 07.24.2020 ISSUE FOR ENGINEERING 2 ERO 07.31.2020 ISSUE FOR LONG LEAD ITEMS 3 ERO 07.31.2020 ISSUE FOR PERMIT 4 ERO 08.25.2020 FINISH PLAN GENERAL NOTES: 1. ALL FINISH SELECTIONS IDENTIFIED IN LEGENDS, SCHEDULES, AND SPECIFICATIONS ARE NOT SUBJECT TO 'OR EQUAL' SUBSTITUTIONS U.N.O. THE CONTRACTOR AND SUBCONTRACTORS SHALL SUBMIT PRODUCTS AND FINISHES AS INDICATED IN THE DOCUMENTS. 2. NOTIFY ARCHITECT OF SCHEDULED FINISHES THAT ARE UNAVAILABLE OR DISCONTINUED AT THE EARLIEST OPPORTUNITY SUCH THAT A SUBSTITUTION CAN BE SELECTED WITHOUT JEOPARDIZING THE CONSTRUCTION SCHEDULE. 3. REFER TO THE MATERIAL SCHEDULE FOR MANUFACTURER, PRODUCT/STYLE NAME, COLOR SPECIFICATION. 4. INSTALL ALL FINISH MATERIALS IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDED SPECIFICATIONS, SURFACE PREPARATION, ADHESIVES AND BACKINGS: INCLUDING WALLCOVERINGS, COATINGS, FLOORING MATERIALS, LAMINATES, ETC. 5. THE CONTRACTOR SHALL REPAIR ALL ROUGH FLOOR SLAB UNEVENNESS SUITABLE FOR PROPER FLOOR COVERING INSTALLATION. 6. FLOOR MATERIAL TRANSITIONS AT DOOR OPENINGS ARE TO BE CENTERED BELOW THE DOOR IN THE CLOSED POSITION, U.N.O. 7. THE PAINTING SUBCONTRACTOR SHALL ENSURE THAT ALL PAINTS COMPLY WITH THE MUNICIPAL & STATE CODES AND BUILDING REGULATIONS FOR LOW VOC EMISSIONS. 8. ELECTRICAL SWITCH AND OUTLET COVER PLATES, SURFACE HARDWARE, ETC. SHALL BE INSTALLED AFTER PAINTING AND/OR APPLICATION OF WALL COVERINGS AND SPECIFIED CARPET. 9. STAINED AND PAINTED SURFACES SHALL BE FINISHED SUCH THAT JOINTS/IMPERFECTIONS ARE NOT VISIBLE. 10. PROVIDE METAL TRANSITION STRIPS AT ALL FLOORING MATERIAL CHANGES, U.N.O. REFER TO PLAN FOR DETAIL LOCATIONS. 11. HARD FLOORING GROUT IS TO BE SEALED WITH MANUFACTURER'S RECOMMENDED SEALERS. 12. RUBBER/VINYL BASE SHALL BE STRAIGHT BASE AT ALL LOCATIONS FOR CARPET AND COVE BASE AT RESILIENT FLOORS. 13. RESILIENT BASE SHALL BE IN ROLL FORM AND RUN CONTINUOUSLY . 14. HOLLOW METAL DOOR FRAMES TO BE PAINTED TO MATCH ADJACENT WALL. PAINTED DOORS TO MATCH ADJACENT WALL. ALL PAINTED DOORS AND DOOR FRAMES SHALL BE PAINTED WITH AN ALKYD BASED SEMI-GLOSS FINISH U.N.O. 15. ALL ELECTRICAL PANELS VISIBLE IN OTHER THAN ELECTRICAL ROOMS SHALL BE PAINTED TO MATCH THE ADJACENT WALL FINISH. PAINT CEILING ACCESS PANELS TO MATCH ADJACENT CEILING FINISH. UNDERSIDE OF SOFFITS (WHERE OCCURS) TO BE PAINTED TO RECEIVE FINISH TO MATCH WALL, U.N.O. GYPSUM BOARD CEILINGS SCHEDULED TO RECEIVE PAINT SHALL HAVE A FLAT FINISH, U.N.O. 16. FINISH FLOORING TO EXTEND FROM WALL TO WALL INCLUDING UNDER CABINETS AND UNDERCABINET EQUIPMENT. 17. ALL INTERIOR WALL AND CEILING FINISHES TO COMPLY WITH IBC SECTION 803 AND IBC TABLE 803.9 AND ALL LOCAL CODE AMENDMENTS. 18. ALL INTERIOR FLOOR FINISHES TO COMPLY WITH IBC SECTION 804 AND ALL LOCAL CODE AMENDMENTS. 19. ALL DECORATIVE MATERIALS AND TRIM SHALL COMPLY WITH IBC SECTION 805 AND ALL LOCAL CODE AMENDMENTS. 20. ALL PAINTED SURFACES ARE TO RECEIVE A PRIME COAT AND A MINIMUM OF TWO COATS FINAL COLOR, U.N.O. APPLY PER MANUFACTURER'S RECOMMENDATION. 21. ALL CONVECTOR COVERS SHALL BE PAINTED WITH AN ALKYD BASED SEMI-GLOSS FINISH U.N.O. 22. CARPET CONTRACTOR SHALL VERIFY THAT ALL CARPET OF EACH VARIETY IS TO BE SHIPPED FROM THE SAME DYE-LOT. 23. ALL WALLS PAINTED WITH A LATEX PAINT TO HAVE AN EGGSHELL FINISH, U.N.O. REFER TO THE MATERIAL SCHEDULE AND FINISH LEGEND FOR MANUFACTURER'S PRODUCT SPECIFICATION. 24. PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH-OUTS OF EACH COLOR AND FINISH FOR ARCHITECT'S APPROVAL. PRIOR TO APPLICATION, ON-SITE APPLICATION WILL BE REQUIRED FOR FINAL APPROVAL. ARCHITECT RESERVES THE RIGHT TO ADJUST ANY COLOR/FINISH ONCE THE WALL TEST HAS BEEN MADE. 25. PRIOR TO THE INSTALLATION OF ANY CARPET MATERIAL, PROVIDE TO THE ARCHITECT, FOR APPROVAL, A SEAMING DIAGRAM ILLUSTRATING THE DIRECTION OF THE CARPET AND THE SEAM LOCATIONS. 26. CARPET SEAMS SHALL NOT BE LOCATED PERPENDICULAR THROUGH DOOR THRESHOLDS 27. ARCHITECTURAL ADHESIVES, SEALANTS AND SEALANT PRIMERS MUST COMPLY WITH SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) RULE #1168. VOLATILE ORGANIC COMPOUND (VOC) LIMITS LISTED IN THE TABLE BELOW CORRESPOND TO RULE AMENDMENT DATE OF JANUARY 7, 2005. 28. PAINTS AND COATINGS : APPLIED TO INTERIOR WALLS AND CEILINGS MUST NOT EXCEED THE VOLATILE ORGANIC COMPOUND (VOC) CONTENT LIMITS ESTABLISHED IN GREEN SEAL STANDARD GS-11, PAINTS, EDITION 3.2, OCTOBER 26, 2015. 29. ANTI-CORROSIVE AND ANTI-RUST PAINTS: APPLIED TO INTERIOR FERROUS METAL SUBSTRATES MUST NOT EXCEED THE VOC CONTENT LIMIT OF 250 G/L ESTABLISHED IN GREEN SEAL STANDARD GC-03, ANTI-CORROSIVE PAINTS, 2ND EDITION, JANUARY 7, 1997. 30. CLEAR WOOD FINISHES, FLOOR COATINGS, STAINS, PRIMERS, SEALERS, AND SHELLACS: APPLIED TO INTERIOR ELEMENTS MUST NOT EXCEED THE VOC CONTENT LIMITS ESTABLISHED FOR THOSE COATING TYPES IN SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) RULE 1113, ARCHITECTURAL COATINGS, AMENDED FEBRUARY 5, 2016. SEALANTS VOC LIMIT (G/L LESS WATER) INDOOR CARPET ADHESIVES 50 PVC WELDING 510 CARPET PAD ADHESIVES 50 CPVC WELDING 490 WOOD FLOORING ADHESIVES 100 ABS WELDING 325 RUBBER FLOOR ADHESIVES 60 PLASTIC CEMENT WELDING 250 SUBFLOOR ADHESIVES 50 ADHESIVE PRIMER FOR PLASTIC 550 CERAMIC TILE ADHESIVES 65 CONTACT ADHESIVE 80 VCT AND ASPHALT ADHESIVES 50 SPECIAL PURPOSE CONTACT ADHESIVE 250 DRYWALL AND PANEL ADHESIVES 50 STRUCTURAL WOOD MEMBER ADHESIVE 140 COVE BASE ADHESIVES 50 SHEET APPLIED RUBBER LINING OPERATIONS 850 MULTIPURPOSE CONSTRUCTION ADHESIVES 70 TOP AND TRIM ADHESIVE 250 STRUCTURAL GLAZING ADHESIVES 100 SUBSTRATE SPECIFIC APPLICATIONS VOC LIMIT (G/L LESS WATER) METAL TO METAL 30 ARCHITECTURAL 250 PLASTIC FOAMS 50 NONMEMBRANE ROOF 300 POROUS MATERIAL (EXCEPT WOOD) 50 ROADWAY 250 WOOD 30 SINGLE-PLY ROOF MEMBRANE 450 FIBERGLASS 80 OTHER 420 SEALANT PRIMERS VOC LIMIT (G/L LESS WATER) ARCHITECTURAL, NONPOROUS 250 ARCHITECTURAL, POROUS 775 OTHER 750 AEROSOL ADHESIVES: AEROSOL ADHESIVES MUST COMPLY WITH GREEN SEAL STANDARD FOR COMMERCIAL ADHESIVES GS-36 REQUIREMENTS IN EFFECT ON OCTOBER 19, 2000. AEROSOL ADHESIVES VOC LIMIT GENERAL PURPOSE MIST SPRAY: 65% VOCs by weight GENERAL PURPOSE WEB SPRAY: 55% VOCs by weight SPECIAL PURPOSE AEROSOL ADHESIVES (ALL TYPES): 70% VOCs by weight FINISH PLAN LEGEND:-- NOT IN CONTRACT FINISH TAG FLOOR FINISH TRANSITION FLOOR FINISH TRANSITION AT NEW AND EXISTING FLOOR FINISHES INDICATES DIRECTION OF FLOOR FINISH PATTERN FLOORING/WALL EXTENT OF FINISH FINISH/TREATMENT E KEYNOTES: 400. PROVIDE ADA COMPLIANT FLOORING TRANSITION: 400.1. EXISTING TILE TO CARPET, SEE DETAIL 2 IN THIS SHEET. IF REQUIRED, FEATHER LEVELING UP SO AS TO CREATE A SMOOTH TRANSITION. 400.2. VINYL TILE TO CARPET, SEE DETAIL 3 IN THIS SHEET. IF REQUIRED, FEATHER LEVELING UP SO AS TO CREATE A SMOOTH TRANSITION. 401. PATCH AND REPAIR EXISTING CARPET AS NECESSARY TO ACCOMMODATE NEW CONSTRUCTION. -- 1/8" = 1'-0" FINISH PLAN - SIDE A1 A4-1A SIDE A 14" MAXNTS EXISTING TILE TO CARPET TRANSITION A4-1A 2 SCHEDULED CARPET GENOTEK #233 ALUMINUM TRANSITION STRIP, #63 SATIN SILVER, 1/4" MAX VERTICAL CHANGE (1/2" MAX VERTICAL CHANGE IF SLOPED AT 1:2. (ACCESSIBLE COMPLIANT)) EXISTING TILE CONCRETE SLAB NTS VINYL TILE TO CARPET TRANSITION A4-1A 3 CONCRETE SLAB CARPET ALUMINUM TRANSITION BY SCHLUTER SYSTEMS (SCHIENE) VINYL TILE 09/16/20