Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A4-1B
WELLNESS 05.435 AEDFEC FEC FEC CONFERENCE 05.340 CONFERENCE 05.110 OFFICE 05.160 TRAINING 05.225 CONFERENCE 05.445 STORAGE 05.440 OFFICE 05.430 RECEPTION 05.105 WORKROOM 05.360 OFFICE 05.355 CASHIER 05.545 SECURE STORAGE 05.375 OFFICE 05.400 OPEN OFFICE 05.390 OFFICE 05.115 ELECT. 05.050 STORAGE 05.365 NER 05.370 OPEN OFFICE 05.415 SECURE STORAGE 05.395 CONFERENCE 05.350 OFFICE 05.335 OFFICE 05.125 OFFICE 05.130 OFFICE 05.135 OFFICE 05.140 OFFICE 05.145 OFFICE 05.150 OFFICE 05.155 OFFICE 05.175 OFFICE 05.170 OFFICE 05.405 OPEN OFFICE 05.410 OFFICE 05.165 OFFICE 05.215 OFFICE 05.210 OFFICE 05.205 OFFICE 05.200 OFFICE 05.195 OFFICE 05.190 OFFICE 05.185 OFFICE 05.180 PANTRY 05.450 PRINT AREA 05.385 ELEVATOR LOBBY 05.100 OPEN OFFICE 05.345 OFFICE 05.120 STAIRS 05.005 STAIRS 05.010 OFFICE 05.425 OFFICE 05.220 CORRIDOR 05.46501/A4-1A01/A4-1B01/A4-1A01/A4-1BCPT2 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT3 CPT2 CPT2 CPT2 CPT2 EX TL EX TLEX TL CPT1 CPT1 CPT1 CPT1 RF1 RF1 RF1 PT2WC2 WC3 WC1WC1WC1WC1 WC2WC2WC2WC2WC1WT1 CPT3 CPT3 CPT3 EX TLE X T L 400.1 400.1 WC4 400.2 400.2 400.2EX TLEX TLEX VCT 400.2 EX VCT 400.2 EX VCT 400.2 EX VCT 400.2 EX VCT 400.2 EX VCT 400.2 RF1 PT2 400.1 EX TL EX TL 400.1 AEDFEC FEC FECFECAED RSV Plot Date: 8/25/2020 12:08:02 PM Filename: \\nelson.com\corpdata\Proj\bank Of America\IN\20.0000681.000-bofa Indianapolis Mlwm 5th Floor Refresh\DRAWINGS\A-I\3_CD\INW-044 BofA Indianapolis MLWM 5th Floor Refresh A4-1A & A4-1B.dwg User: Edgardo Rivera-Ortiz Device: _AutoCAD PDF (General Documentation).pc3 PenTable: _NELSON-HALF.ctbA4-1B FINISH PLAN - SIDE B Proj. No: Drawn By: Project Manager: ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED ON SITE BY THE CONTRACTOR AND SUB-CONTRACTORS PRIOR TO PERFORMING THE WORK. THE PROJECT MANAGER SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. © NELSON WORLDWIDE, LLC 2020 ALL RIGHTS RESERVED Designer: Reviewed By: Approved By: Key Plan: Nelco Architecture, Inc. a licensed affiliate 4'0 8' 16' Scale: PROJECT LOCATION Phone: 30 West Monroe Street - Suite 200 Chicago, IL 60603-2409 (312) 263-6605 (312) 276-4340 Phone: 20.0000681.000 MJL ERO ERO/MBM MJL/VPD VPD Date:No: Description: By: Client: Sheet Title: Consultant: Project Title & Address: Seal: Sheet Number: INW-044 BofA Indianapolis MLWM 5th Floor Refresh 510 96th Street Indianapolis, IN 46240 OWNER'S PROJECT MANAGER Jones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL4-540-04-55 Chicago, IL 60661 T: 312.909.2139 E: leslie.soto@am.jll.com MEP ENGINEER Integrated Engineering Consultants, Inc. (IEC) Tim Vining 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T: 216.901.6711 E: tim.vining@iec-inc.cc GENERAL CONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.977.9255 E: tlc@midamericacontracting.com ISSUE FOR EARLY DEMOLITION 1 ERO 07.24.2020 ISSUE FOR ENGINEERING 2 ERO 07.31.2020 ISSUE FOR LONG LEAD ITEMS 3 ERO 07.31.2020 ISSUE FOR PERMIT 4 ERO 08.25.2020 FINISH PLAN GENERAL NOTES: 1. REFER TO SHEET A4-1A FOR APPLICABLE GENERAL NOTES. FINISH PLAN LEGEND:-- NOT IN CONTRACT FINISH TAG FLOOR FINISH TRANSITION FLOOR FINISH TRANSITION AT NEW AND EXISTING FLOOR FINISHES INDICATES DIRECTION OF FLOOR FINISH PATTERN FLOORING/WALL EXTENT OF FINISH FINISH/TREATMENT E -- 1/8" = 1'-0" FINISH PLAN - SIDE B1 A4-1B SIDE B KEYNOTES: 400. PROVIDE ADA COMPLIANT FLOORING TRANSITION: 400.1. EXISTING TILE TO CARPET, SEE DETAIL 2 IN SHEET A4-1A. IF REQUIRED, FEATHER LEVELING UP SO AS TO CREATE A SMOOTH TRANSITION. 400.2. VINYL TILE TO CARPET, SEE DETAIL 3 IN SHEET A4-1A. IF REQUIRED, FEATHER LEVELING UP SO AS TO CREATE A SMOOTH TRANSITION. 401. PATCH AND REPAIR EXISTING CARPET AS NECESSARY TO ACCOMMODATE NEW CONSTRUCTION. 09/16/20