Loading...
HomeMy WebLinkAboutA7-1FAU1 SCHEDULED TASKLIGHT SPD1 T/R REFRIGERATOR MICROWAVECOFFEE PRINTER PRINTER COPIER 2'-6" CLEAR 1"3 4" ±2'-9 3 4" 2EQ112" 2'-1" 2'-1" 11 2" ±3'-0" 2EQ 2'-01 2" VERIFY W/ EQUIP ±7'-71 2" 3 4" ±5'-5" 2EQ 3 4" 2'-1"2'-0" 11 2" ±5'-8" 4EQ 2'-10" 1'-10" 5'-9" 2'-10"2'-10" ±7'-83 4" 5EQ 3 4" 3 4" ±4'-63 4" 3EQ 3'-111 2" 1'-3" 1'-3" 3 4" ±3'-81 2" 2EQ 3 4"2'-2" 3'-0"±8"1'-3"2'-2" 3'-0"±8"2'-2" 3'-0"±8"A8-1 7 A8-1 12 A8-1 8 A8-1 12 A8-1 13 A8-1 12 A8-1 9 A8-1 11 A8-1 2 A8-1 4 A8-1 6 A8-1 9 A8-1 3 A8-1 72'-2" 4'-0" HOLDSCHEDULED TASKLIGHT SCHEDULED TASKLIGHT PL1 PL1 PL1 PL1 PL1 PL1 PL1PL1 PL1 PL1 WC4 PL2 PL1 PL1 SS1 SS1WT1 WT1PT2 SCHEDULED BASE SCHEDULED BASE PL2 PTD1 ICE/H20 CH4 CH5 CH4 CH4 CH5 CH4 CH0 CH0 CH0 CH0 T/R 1'-3" 6" ±5'-41 2" 6"8'-0"PL1 ±15'-7" VIF 2EQ ALIGNCH0 FINISH FLOOR 0'-0" FINISH CLNG ±8'-8" DISTRACTION BAND APPLIQUE BY OTHERS, GC TO COORDINATE (TYP) ROOM IDENTIFICATION SIGNAGE BY OTHERS, GC TO COORDINATE (TYP) A9-1 7 TYP A9-1 5 TYP A9-1 6 TYP CLEAR SILICONE BUTT JOINT, 1 4" MAX (TYP) ±6'-2" VIF 2EQ ±3'-5" VIF ±13'-1" VIF 3EQ EQ ±7'-51 4" EQ±8'-4" VIF5'-0"4" 4"±3'-434"±5'-51 4"4'-5"VERIFY W/ TBODEQ EQ 1'-0" 4" 1'-0"4"A8-1 1 SCHEDULED BASE SCHEDULED BASE WC1 WC1 WC1 PAINT NICHE IN MATTE BLACK (PT4) A9-1 4 TYP REFRIGERATOR MICROWAVE COFFEE A8-1 7 A8-1 9 A8-1 12 PT2 2'-10" 2'-2" 3'-0"±8"CH0 T/R PT2 CH4 CH4 PL1 PL1 SCHEDULED TASKLIGHT PL1 3 4" 8'-71 4" 6EQ 3'-6" 3 4" 8'-71 4" 6EQ FINISH FLOOR 0'-0" FINISH CLNG ±8'-8" TRASH 3 4" ±4'-61 2" 3EQ 3 4" ±1'-81 4" VIF ±4'-91 2" 3EQ 63 4" ±3'-71 4" ±5'-63 4" 1'-6" MIN4" 4"±2'-1134"±4'-83 4" 5" 4" 5" 4"4'-3"VERIFY W/ TBODEQ EQ 2'-10"2'-10"ALIGN W/WALL EDGEA8-1 1 A8-1 14 A8-1 10 A8-1 10 A8-1 14 PL1 PL1PL1 SS1 SS1 SCHEDULED BASE WC1 WC1WC1 CH4 CH5 CH0 PAINT NICHE IN MATTE BLACK (PT4) COPIER PL1 A8-1 8 SCHEDULED TASKLIGHT PRINTER 1'-10" A8-1 7 A8-1 12 A8-1 9 A8-1 11 3'-2"PL1 PL1 PL1 PL1 PL1 PL2 PT2 SCHEDULED BASE PL2 CH4 CH4 CH0 T/R CH0 2'-10" 2'-2" 3'-0"±8"5'-9" 1'-3"1'-2" ±11'-73 4" 8EQ 3 4" ±7'-7" 1'-3" ±9'-111 4" 6EQ ±2'-111 4" 3 4"3 4" 11 2" 3 4" TRASHFINISH FL 0'-0" FINISH CLNG ±8'-8" Plot Date: 8/25/2020 12:38:07 PM Filename: \\nelson.com\CorpData\Proj\Bank Of America\IN\20.0000681.000-BofA Indianapolis MLWM 5th Floor Refresh\DRAWINGS\A-I\3_CD\INW-044 BofA Indianapolis MLWM 5th Floor Refresh A7-1.dwg User: Edgardo Rivera-Ortiz Device: DWG To PDF.pc3 PenTable: _NELSON-HALF.ctbA7-1 INTERIOR ELEVATIONS Proj. No: Drawn By: Project Manager: ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED ON SITE BY THE CONTRACTOR AND SUB-CONTRACTORS PRIOR TO PERFORMING THE WORK. THE PROJECT MANAGER SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. © NELSON WORLDWIDE, LLC 2020 ALL RIGHTS RESERVED Designer: Reviewed By: Approved By: Nelco Architecture, Inc. a licensed affiliate Phone: 30 West Monroe Street - Suite 200 Chicago, IL 60603-2409 (312) 263-6605 (312) 276-4340 Phone: 20.0000681.000 MJL ERO ERO/MBM MJL/VPD VPD Date:No: Description: By: Client: Sheet Title: Consultant: Project Title & Address: Seal: Sheet Number: INW-044 BofA Indianapolis MLWM 5th Floor Refresh 510 96th Street Indianapolis, IN 46240 OWNER'S PROJECT MANAGER Jones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL4-540-04-55 Chicago, IL 60661 T: 312.909.2139 E: leslie.soto@am.jll.com MEP ENGINEER Integrated Engineering Consultants, Inc. (IEC) Tim Vining 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T: 216.901.6711 E: tim.vining@iec-inc.cc GENERAL CONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.977.9255 E: tlc@midamericacontracting.com ISSUE FOR EARLY DEMOLITION 1 ERO 07.24.2020 ISSUE FOR ENGINEERING 2 ERO 07.31.2020 ISSUE FOR LONG LEAD ITEMS 3 ERO 07.31.2020 ISSUE FOR PERMIT 4 ERO 08.25.2020 3/8" = 1'-0" PRINT AREA SOUTH ELEVATION1 A7-1 3/8" = 1'-0" TYPICAL OFFICE GLASSFRONT ELEVATION6 A7-1 3/8" = 1'-0" PRINT AREA WEST ELEVATION 2 A7-1 3/8" = 1'-0" PRINT AREA EAST ELEVATION3 A7-1 3/8" = 1'-0" PANTRY 05.450 WEST ELEVATION4 A7-1 5 A7-1 PANTRY 05.450 NORTH ELEVATION 3/8" = 1'-0" 9 A7-1 CONFERENCE 05.340 MILLWORK ELEVATION 3/8" = 1'-0" 8 A7-1 CONFERENCE 05.340 MONITOR WALL ELEVATION 3/8" = 1'-0" 10 A7-1 CONFERENCE 05.350 MILLWORK ELEVATION 3/8" = 1'-0" 11 A7-1 CONFERENCE 05.350 MONITOR WALL ELEVATION 3/8" = 1'-0" 12 A7-1 PRINT ROOM 05.530 WEST ELEVATION 3/8" = 1'-0" 13 A7-1 PRINT ROOM 05.530 SOUTH ELEVATION 3/8" = 1'-0" 7 A7-1 WORKROOM 05.360 MILLWORK ELEVATION 3/8" = 1'-0" 09/16/20