Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AN-4.1
Plot Date: 8/25/2020 12:01:52 PM Filename: \\nelson.com\corpdata\Proj\bank Of America\IN\20.0000681.000-bofa Indianapolis Mlwm 5th Floor Refresh\DRAWINGS\A-I\3_CD\INW-044 BofA Indianapolis MLWM 5th Floor Refresh AN-4.1.dwg User: Edgardo Rivera-Ortiz Device: _AutoCAD PDF (General Documentation).pc3 PenTable: _NELSON-HALF.ctbAN-4.1 SPECIFICATIONS Proj. No: Drawn By: Project Manager: ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED ON SITE BY THE CONTRACTOR AND SUB-CONTRACTORS PRIOR TO PERFORMING THE WORK. THE PROJECT MANAGER SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. © NELSON WORLDWIDE, LLC 2020 ALL RIGHTS RESERVED Designer: Reviewed By: Approved By: Nelco Architecture, Inc. a licensed affiliate Phone: 30 West Monroe Street - Suite 200 Chicago, IL 60603-2409 (312) 263-6605 (312) 276-4340 Phone: 20.0000681.000 MJL ERO ERO/MBM MJL/VPD VPD Date:No: Description: By: Client: Sheet Title: Consultant: Project Title & Address: Seal: Sheet Number: INW-044 BofA Indianapolis MLWM 5th Floor Refresh 510 96th Street Indianapolis, IN 46240 OWNER'S PROJECT MANAGER Jones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL4-540-04-55 Chicago, IL 60661 T: 312.909.2139 E: leslie.soto@am.jll.com MEP ENGINEER Integrated Engineering Consultants, Inc. (IEC) Tim Vining 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T: 216.901.6711 E: tim.vining@iec-inc.cc GENERAL CONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.977.9255 E: tlc@midamericacontracting.com ISSUE FOR EARLY DEMOLITION 1 ERO 07.24.2020 ISSUE FOR ENGINEERING 2 ERO 07.31.2020 ISSUE FOR LONG LEAD ITEMS 3 ERO 07.31.2020 ISSUE FOR PERMIT 4 ERO 08.25.2020 SPECIFICATIONS TABLE OF CONTENTS CONDITIONS OF THE CONTRACT 00710 ORGANIZATION OF DOCUMENTS 00820 INSURANCE REQUIREMENTS DIVISION 1 - GENERAL REQUIREMENTS 01000 GENERAL NOTES 01020 ALLOWANCES 01030 ALTERNATES 01035 MODIFICATION PROCEDURES 01040 COORDINATION AND PROJECT MANAGEMENT 01100 REMOVALS 01300 ADMINISTRATIVE REQUIREMENTS 01330 SUBMITTAL PROCEDURES 01700 EXECUTION REQUIREMENTS 01730 CUTTING AND PATCHING DIVISION 2 - SITE WORK NOT USED DIVISION 3 - CONCRETE NOT USED DIVISION 4 - MASONRY NOT USED DIVISION 5 - METALS 05400 METAL FRAMING DIVISION 6 - WOOD AND PLASTICS 06001 GENERAL 06400 ARCHITECTURAL WOODWORK DIVISION 7 - THERMAL AND MOISTURE PROTECTION 07200 INSULATION 07250 FIREPROOFING 07900 JOINT SEALANTS DIVISION 8 - DOORS AND WINDOWS 08200 FLUSH WOOD DOORS 08410 ALUMINUM ENTRANCES AND STOREFRONTS 08500 WINDOWS AND LOUVERS 08700 HARDWARE 08800 GLAZING DIVISION 9 - FINISHES 09000 GENERAL 09250 GYPSUM BOARD 09300 CERAMIC TILE 09500 ACOUSTICAL TILE CEILINGS 09600 STONE TILE 09650 RESILIENT FLOORING AND ACCESSORIES 09680 CARPET 09690 CARPET TILE 09900 PAINTING 09950 WALL COVERINGS DIVISION 10 - SPECIALTIES NOT USED DIVISION 11 - EQUIPMENT NOT USED DIVISION 12 - FURNISHINGS 12500 WINDOW TREATMENT DIVISION 13 - SPECIAL CONSTRUCTION NOT USED DIVISION 14 - CONVEYING SYSTEMS NOT USED DIVISION 15 - MECHANICAL SEE ENGINEERING DRAWINGS DIVISION 16 - ELECTRICAL SEE ENGINEERING DRAWINGS 16000 GENERAL 16050 DEVICES CONDITIONS OF THE CONTRACT 00710ORGANIZATION OF DOCUMENTS A. THE ORGANIZATION OF THE SPECIFICATIONS INTO DIVISION, SECTIONS AND ARTICLES, AND THE ARRANGEMENT OF DRAWINGS SHALL NOT CONTROL THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN ESTABLISHING THE EXTENT OF THE WORK TO BE PERFORMED BY ANY TRADE. 00820INSURANCE REQUIREMENTS A. THE CONTRACTOR SHALL MAINTAIN ALL NECESSARY INSURANCES AS REQUIRED BY LAW, AND SHALL PROVIDE THE OWNER AND THE BUILDING DEPARTMENT WITH COPIES OF THE CURRENT UP-TO-DATE PREMIUMS AND SHALL GIVE 15 DAYS NOTICE TO THE OWNER AND THE BUILDING DEPARTMENT OF ANY CHANGES TO THE POLICY DURING THE DURATION OF THE JOB. B. THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE OWNER AND ARCHITECT AGAINST ANY AND ALL CLAIMS AND DEMANDS FOR DAMAGE TO THE PROPERTY OF ANY PERSON, FIRM OR INDIVIDUAL OR FOR PERSONAL INJURIES (INCLUDING DEATH) ARISING OUT OF, OR SUFFERED WHILE ENGAGED IN, OR CAUSED, IN WHOLE OR IN PART, BY THE EXECUTION OF THE WORK; HE SHALL WELL AND TRULY DEFEND OWNER AND ARCHITECT AND SHALL PAY ALL MONIES AWARDED FOR SUCH DAMAGES OR INJURIES (INCLUDING DEATH) AS MAY BE SUSTAINED, ALL COSTS INCLUDING ATTORNEY'S FEES AND SHALL OBTAIN A FULL ACQUITTANCE AND RELEASE IN FAVOR OF THE OWNER AND ARCHITECT, UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE OF THE OWNER, ARCHITECT, AGENTS OR EMPLOYEES. DIVISION 1 - GENERAL REQUIREMENTS 01000 GENERAL NOTES A. PROJECT SUMMARY: THE SCOPE OF WORK IS CONSIDERED A LEVEL 2 ALTERATION AND INCLUDES THE INSTALLATION OF NEW PARTITIONS AND DOORS, CEILING GRID AND TILES, NEW FINISHES, AS WELL AS THE INSTALLATION OF SYSTEMS FURNITURE. B. PARTICULAR PROJECT REQUIREMENTS: 1. CONCURRENT WORK BY OTHERS: a. FURNITURE b. SECURITY SYSTEM c. SIGNAGE 2. CODES: COMPLY WITH APPLICABLE CODES AND REGULATIONS OF AUTHORITIES HAVING JURISDICTION, INCLUDING THE LOCAL AND STATE BUILDING CODES. SUBMIT COPIES OF INSPECTION REPORTS, NOTICES AND SIMILAR COMMUNICATIONS TO OWNER. C. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND APPROVALS FOR THE COMPLETION OF THE WORK. APPLY FOR, OBTAIN, AND PAY FOR PERMITS, FEES, AND UTILITY COMPANY BACKCHARGES REQUIRED TO PERFORM THE WORK. COORDINATE PERMITS WITH LANDLORD. SUBMIT COPIES TO OWNER. D. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO COMMENCING WORK, AND SHALL REPORT ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS TO THE ARCHITECT. DO NOT SCALE DRAWINGS. DO NOT REMOVE OR ALTER STRUCTURAL COMPONENTS WITHOUT PRIOR WRITTEN APPROVAL. E. INTENT: DRAWINGS AND SPECIFICATIONS ARE INTENDED TO PROVIDE THE BASIS FOR PROPER COMPLETION OF THE WORK SUITABLE FOR THE INTENDED USE OF THE OWNER. ANYTHING NOT EXPRESSLY SET FORTH BUT WHICH IS REASONABLE IMPLIED OR NECESSARY FOR PROPER PERFORMANCE OF THE PROJECT SHALL BE INCLUDED. F. INSTALL ALL EQUIPMENT AND MATERIALS AS PER MANUFACTURERS' RECOMMENDATIONS AND PER THE “BEST TRADE PRACTICES”. ANY DIFFICULTIES MUST BE REPORTED TO THE ARCHITECT IMMEDIATELY. G. COORDINATE THE WORK OF ALL TRADES. 1. PREPARE COORDINATION DRAWINGS FOR AREAS ABOVE CEILINGS WHERE CLOSE TOLERANCES ARE REQUIRED BETWEEN BUILDING ELEMENTS AND MECHANICAL AND ELECTRICAL WORK. 2. VERIFY LOCATION OF UTILITIES AND EXISTING CONDITIONS. H. INSTALLATION REQUIREMENTS, GENERAL: 1. INSPECT SUBSTRATES AND REPORT UNSATISFACTORY CONDITIONS IN WRITING. 2. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. 3. TAKE FIELD MEASUREMENTS PRIOR TO FABRICATION WHERE PRACTICAL. FORM TO REQUIRED SHAPES AND SIZES WITH TRUE EDGES, LINES AND ANGLES. PROVIDE INSERTS AND TEMPLATES AS NEEDED FOR WORK OF OTHER TRADES. 4. INSTALL MATERIALS IN EXACT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS, RECOMMENDATIONS AND APPROVED SUBMITTALS. 5. INSTALL MATERIALS IN PROPER RELATION WITH ADJACENT CONSTRUCTION AND WITH PROPER APPEARANCE. 6. RESTORE UNITS DAMAGED DURING INSTALLATION. REPLACE UNITS WHICH CANNOT BE RESTORED AT NO ADDITIONAL EXPENSE TO THE OWNER. 7. REFER TO ADDITIONAL INSTALLATION REQUIREMENTS AND TOLERANCES SPECIFIED UNDER INDIVIDUAL SPECIFICATION SECTIONS. I. THE CONTRACTOR SHALL MAINTAIN AT THE SITE FOR THE OWNER ONE RECORD COPY OF ALL DRAWINGS, AND APPROVED SAMPLES, MARKED CURRENTLY TO RECORD ALL CHANGES DURING CONSTRUCTION. J. DIMENSIONS ARE TO FINISH CONSTRUCTION, UNLESS NOTED OTHERWISE. K. DEFINITIONS: 1. PROVIDE: FURNISH AND INSTALL, COMPLETE WITH ALL NECESSARY ACCESSORIES, READY FOR INTENDED USE. PAY FOR ALL RELATED COSTS. 2. APPROVED: ACCEPTANCE OF ITEM SUBMITTED FOR APPROVAL. NOT A LIMITATION OR RELEASE FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS OR REGULATORY REQUIREMENTS. REFER TO LIMITATIONS OF 'APPROVED' IN GENERAL AND SUPPLEMENTARY CONDITIONS. 3. MATCH EXISTING: MATCH EXISTING AS ACCEPTABLE TO THE OWNER. L. WRITING STYLE: SPECIFICATIONS ARE WRITTEN IN THE IMPERATIVE MODE. EXCEPT WHERE SPECIFICALLY INTENDED OTHERWISE, THE SUBJECT OF ALL IMPERATIVE STATEMENTS IS THE CONTRACTOR. FOR EXAMPLE, 'PROVIDE TILE' MEANS 'CONTRACTOR SHALL PROVIDE TILE. 01020 ALLOWANCES A. WHERE ALLOWANCES ARE PROVIDED, THEY ARE FOR MATERIALS ONLY; INSTALLATION OF SUCH ITEMS SHALL BE INCLUDED. AT THE OWNER'S OPTION, ALLOWANCE ITEMS MAY BE PURCHASED DIRECTLY BY THE OWNER, WITH THE ALLOWANCE PRICE DEDUCTED FROM THE CONTRACT SUM. 01030 ALTERNATES A. PROVIDE LIST PRICE FOR EACH ALTERNATE IN BID FORM. INCLUDE COST OF MODIFICATIONS TO OTHER WORK TO ACCOMMODATE ALTERNATE. INCLUDE RELATED COSTS SUCH AS OVERHEAD AND PROFIT. B. OWNER WILL DETERMINE WHICH ALTERNATES ARE SELECTED FOR INCLUSION IN THE CONTRACT. C. ALTERNATES ARE DESCRIBED BRIEFLY IN THIS SECTION. THE CONTRACT DOCUMENTS DEFINE THE REQUIREMENTS FOR ALTERNATES. D. COORDINATE ALTERNATES WITH RELATED WORK TO ENSURE THAT WORK AFFECTED BY EACH SELECTED ALTERNATE IS PROPERLY ACCOMPLISHED. 01035 MODIFICATION PROCEDURES A. NO CHANGES IN THE WORK SHALL BE PERFORMED BY THE CONTRACTOR WITHOUT WRITTEN AUTHORIZATION FROM THE ARCHITECT TO PROCEED. ANY CHANGES THE CONTRACTOR PERFORMS WITHOUT SUCH AUTHORIZATION SHALL BE AT THE CONTRACTOR'S RISK. 1. CHANGE ORDER, A.I.A. DOCUMENT G701, 2001 EDITION. 01040 COORDINATION AND PROJECT MANAGEMENT A. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, USING HIS BEST SKILL AND ATTENTION. HE SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. B. THE CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER FOR THE ACTS AND OMISSIONS OF HIS EMPLOYEES, SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES, AND OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A CONTRACT WITH THE CONTRACTOR. C. THE GENERAL CONTRACTOR SHALL PROVIDE A FULL-TIME PROJECT SUPERINTENDENT. D. THE CONTRACTOR SHALL CAREFULLY EXAMINE ALL PLANS AND SPECIFICATIONS PERTAINING TO THIS WORK; HE SHALL VISIT THE SITE AND FULLY INFORM HIMSELF AS TO ALL CONDITIONS AND LIMITATIONS APPLYING TO ALL WORK; HE SHALL ESTIMATE AND INCLUDE IN HIS COST PROPOSAL A SUM SUFFICIENT TO COVER THE COST OF ALL ITEMS OF LABOR AND MATERIALS WHICH ARE REQUIRED TO OBTAIN THE CONTEMPLATED OPERATING CONDITIONS, AND NO SUBSEQUENT ALLOWANCE WILL BE MADE TO THE CONTRACTOR BECAUSE OF HIS NEGLECT IN COMPLYING WITH THESE SPECIFICATIONS. E. PROGRESS MEETINGS WILL BE HELD AS OTHERWISE REQUIRED BY THE PROGRESS OF THE WORK. OWNER, ARCHITECT, CONTRACTOR, AND EACH SUBCONTRACTOR OR OTHER ENTITY CONCERNED WITH THE CURRENT PROGRESS OR INVOLVED WITH PLANNING OR COORDINATION OF FUTURE ACTIVITIES, SHALL ATTEND. 1. MINUTES OF EACH MEETING WILL BE PREPARED BY THE CONTRACTOR AND DISTRIBUTED TO ALL PARTIES. 01100 REMOVALS A. EXISTING DOORS, FRAMES AND HARDWARE, CABINETRY AND EQUIPMENT, WHERE INDICATED, SHALL BE REMOVED CAREFULLY TO ALLOW FOR THEIR SALVAGE AND REUSE. ITEMS NOT NOTED TO BE REUSED ON DRAWINGS SHALL BE TURNED OVER TO BUILDING MANAGMENT. COORIDNATE REMOVAL OF ITEMS WITH BUILIDING MANAGMENT. 01300 ADMINISTRATIVE REQUIREMENTS A. CONSTRUCTION SCHEDULE 1. PREPARE A HORIZONTAL BAR-CHART-TYPE CONSTRUCTION SCHEDULE. PROVIDE A SEPARATE TIME BAR FOR EACH ACTIVITY AND A VERTICAL LINE TO IDENTIFY THE FIRST WORKDAY OF EACH WEEK. USE SAME BREAKDOWN OF WORK AS INDICATED IN THE SCHEDULE OF VALUES. AS WORK PROGRESSES, MARK EACH BAR TO INDICATE ACTUAL COMPLETION. 2. SUBMIT WITHIN 10 DAYS OF THE DATE ESTABLISHED FOR COMMENCEMENT OF THE WORK. 3. COORDINATE EACH ELEMENT WITH OTHER ACTIVITIES. SHOW EACH ACTIVITY IN PROPER SEQUENCE. INDICATE SEQUENCES NECESSARY FOR COMPLETION OF RELATED WORK. 4. INDICATE SUBSTANTIAL COMPLETION AND ALLOW TIME FOR ARCHITECT'S PROCEDURES NECESSARY FOR CERTIFYING SUBSTANTIAL COMPLETION. 5. SCHEDULE DISTRIBUTION: DISTRIBUTE COPIES TO OWNER, ARCHITECT, SUBCONTRACTORS, AND PARTIES REQUIRED TO COMPLY WITH DATES. 6. UPDATING: REVISE THE SCHEDULE AFTER EACH MEETING OR ACTIVITY WHERE REVISIONS HAVE BEEN MADE. 7. THE PROGRESS SCHEDULE SHALL BE RELATED TO THE ENTIRE PROJECT TO THE EXTENT REQUIRED BY THE CONTRACT DOCUMENTS, AND SHALL PROVIDE FOR THE EXPEDITIOUS AND PRACTICABLE EXECUTION OF THE WORK. B. NON-WORK RELATED SUBMITTALS: 1. SCHEDULE OF VALUES 2. INSURANCE CERTIFICATES 3. LIST OF SUBCONTRACTORS AND MATERIAL SUPPLIERS 4. APPLICATIONS FOR PAYMENT THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS, PRODUCT DATA AND SAMPLES FOR THE FOLLOWING ITEMS: MATERIAL SAMPLES: CARPET CEILING TILE CERAMIC TILE PAINT COLORS PATTERNED GLASS RESILIENT FLOORING VINYL BASE VINYL REDUCING STRIP VINYL TILE WALL COVERING WOOD STAIN CATALOGUE CUTS & PRODUCT DATA: ALUMINUM DOORS, INTERIOR WINDOWS AND FRAMES APPLIANCES CABINETRY HARDWARE CARPET MAINTENANCE PROGRAM DOOR HARDWARE FIRE EXTINGUISHER AND CABINET FIRESTOPPING GLAZING CHANNELS SELF-LEVELING CEMENT TOPPING WOOD TRIM AND MOLDING SHOP DRAWINGS: CARPET SEAMING PLAN CASEWORK DOOR AND HARDWARE SCHEDULE OFFICE FRONT MILLWORK INTERIOR WINDOWS KEYING SCHEDULE C. ONLY THE ARCHITECT SHALL HAVE THE AUTHORITY TO DETERMINE WHETHER OR NOT A PRODUCT, OTHER THAN THE ONE SPECIFIED, SHALL COMPLY AS BEING "EQUAL" TO THE ONE SPECIFIED. D. NO PORTION OF THE WORK REQUIRING SUBMISSION OF A SHOP DRAWING, PRODUCT DATA OR SAMPLE SHALL BE COMMENCED UNTIL THE SUBMITTAL HAS BEEN REVIEWED BY THE ARCHITECT. ALL SUCH PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH APPROVED SUBMITTAL. E. NOT IN CONTRACT: 1. FURNITURE 2. SECURITY SYSTEM (UNLESS NOTED OTHERWISE) 3. SIGNAGE 01330 SUBMITTAL PROCEDURES A. SHOP DRAWINGS: PREPARE PROJECT-SPECIFIC INFORMATION, DRAWN ACCURATELY TO SCALE. DO NOT REPRODUCE, DIGITALLY OR OTHERWISE, THE CONTRACT DOCUMENTS AND SUBMIT THEM AS SHOP DRAWINGS. CONTRACTOR, SUBCONTRACTORS, SUPPLIERS AND ALL OTHER ENTITIES SHALL NOT USE, COPY OR REPRODUCE TITLE BLOCKS, DIMENSIONS, NOTES, KEYNOTES, SYMBOLS SCHEDULES OR DETAILS FROM CONTRACT DRAWINGS, DIGITAL OR OTHERWISE. USE OF THE CONTRACT DRAWINGS SHALL BE LIMITED TO REPRODUCTION, DIGITALLY OR OTHERWISE, OF THE EXTERIOR WALL LAYOUT, INTERIOR PARTITION LAYOUT, GRID LINES, DOORS, AND WINDOWS. DO NOT BASE SHOP DRAWINGS ON STANDARD PRINTED DATA. 1. PREPARATION: INCLUDE THE FOLLOWING INFORMATION, AS APPLICABLE: A. DIMENSIONS. B. IDENTIFICATION OF PRODUCTS. C. FABRICATION AND INSTALLATION DRAWINGS. D. ROUGHING-IN AND SETTING DIAGRAMS. E. WIRING DIAGRAMS SHOWING FIELD-INSTALLED WIRING, INCLUDING POWER, SIGNAL,AND CONTROL WIRING. F. SHOPWORK MANUFACTURING INSTRUCTIONS. G. TEMPLATES AND PATTERNS. H. SCHEDULES. I. DESIGN CALCULATIONS. J. COMPLIANCE WITH SPECIFIED STANDARDS. K. NOTATION OF COORDINATION REQUIREMENTS. L. NOTATION OF DIMENSIONS ESTABLISHED BY FIELD MEASUREMENT. 2. WIRING DIAGRAMS: DIFFERENTIATE BETWEEN MANUFACTURER-INSTALLED AND FIELD-INSTALLED WIRING. 3. SHEET SIZE: EXCEPT FOR TEMPLATES, PATTERNS, AND SIMILAR FULL-SIZE DRAWINGS, SUBMIT SHOP DRAWINGS ON SHEETS AT LEAST 8-1/2 BY 11 INCHES (215 BY 280 MM) BUT NO LARGER THAN 30 BY 40 INCHES (750 BY 1000 MM). 4. NUMBER OF COPIES: SUBMIT COPIES OF EACH SUBMITTAL, AS FOLLOWS: A. INITIAL SUBMITTAL: SUBMIT ONE CORRECTABLE, TRANSLUCENT, REPRODUCIBLE PRINT AND ONE BLUE- OR BLACK-LINE PRINT. ARCHITECT WILL RETURN THE REPRODUCIBLE PRINT. B. FINAL SUBMITTAL: SUBMIT THREE BLUE- OR BLACK-LINE PRINTS, UNLESS PRINTS ARE REQUIRED FOR OPERATION AND MAINTENANCE MANUALS. SUBMIT FIVE PRINTS WHERE PRINTS ARE REQUIRED FOR OPERATION AND MAINTENANCE MANUALS. ARCHITECT WILL RETAIN TWO PRINTS; REMAINDER WILL BE RETURNED. MARK UP AND RETAIN ONE RETURNED PRINT AS A PROJECT RECORD DRAWING. B. PRODUCT DATA - 3 COPIES. C. SAMPLES - 2, PLUS EXTRA SAMPLES AS REQUIRED TO INDICATE RANGE OF COLOR, FINISH, AND TEXTURE TO BE EXPECTED D. INSPECTION AND TEST REPORTS - 3 COPIES. E. WARRANTIES - 3 COPIES. GENERAL CONTRACTOR MUST PRUCHASE EXTENDED WARRANTIES. F. SURVEY DATA - 3 COPIES. G. CLOSEOUT SUBMITTALS - 3 COPIES H. PROJECT PHOTOGRAPHS - (10) DIGITAL PHOTOS IN ELECTRONIC FORMAT EACH MONTH AND AT THE BEGINNING AND END OF CONSTRUCTION. I. COMPLY WITH SUBMITTAL PROCEDURES ESTABLISHED BY ARCHITECT INCLUDING ARCHITECT'S SUBMITTAL AND SHOP DRAWING STAMP. PROVIDE REQUIRED RESUBMITTALS IF REQUESTED. PROVIDE DISTRIBUTION OF COPIES INCLUDING MODIFICATIONS. J. SAMPLES AND SHOP DRAWINGS SHALL BE PREPARED SPECIFICALLY FOR THIS PROJECT. SHOP DRAWINGS SHALL INCLUDE DIMENSIONS AND DETAILS, INCLUDING ADJACENT CONSTRUCTION AND RELATED WORK. NOTE SPECIAL COORDINATION REQUIRED. NOTE ANY DEVIATIONS FROM REQUIREMENTS OF THE CONTRACT DOCUMENTS. K. PROVIDE WARRANTIES AS SPECIFIED; WARRANTIES SHALL NOT LIMIT LENGTH OF TIME FOR REMEDY OF DAMAGES OWNER MAY HAVE BY LEGAL STATUTE. WARRANTIES SHALL BE SIGNED BY CONTRACTOR, SUPPLIER OR INSTALLER RESPONSIBLE FOR PERFORMANCE OF WARRANTY. 01700 EXECUTION REQUIREMENTS A. THE FOLLOWING ARE PREREQUISITES TO SUBSTANTIAL COMPLETION. PROVIDE THE FOLLOWING: 1. PUNCH LIST PREPARED BY CONTRACTOR AND SUBCONTRACTORS AS APPLICABLE. 01730 CUTTING AND PATCHING A. PROVIDE CUTTING AND PATCHING WORK TO PROPERLY COMPLETE THE WORK OF THE PROJECT, COMPLYING WITH PROJECT REQUIREMENTS FOR: 1. STRUCTURAL WORK. 2. MECHANICAL/ELECTRICAL SYSTEMS. 3. VISUAL REQUIREMENTS, INCLUDING DETAILING AND TOLERANCES. 4. OPERATIONAL AND SAFETY LIMITATIONS. 5. FIRE RESISTANCE RATINGS. 6. INSPECTION, PREPARATION, AND PERFORMANCE. 7. CLEANING. B. DO NOT CUT AND PATCH IN A MANNER THAT WOULD RESULT IN A FAILURE OF THE WORK TO PERFORM AS INTENDED, DECREASE ENERGY PERFORMANCE, INCREASE MAINTENANCE, DECREASE OPERATIONAL LIFE, OR DECREASE SAFETY PERFORMANCE. C. MATCH EXISTING MATERIALS FOR CUTTING AND PATCHING WORK WITH NEW MATERIALS CONFORMING TO PROJECT REQUIREMENTS. D. INSPECT CONDITIONS PRIOR TO WORK TO IDENTIFY SCOPE AND TYPE OF WORK REQUIRED. PROTECT ADJACENT WORK. NOTIFY OWNER OF WORK REQUIRING INTERRUPTION TO BUILDING SERVICES OR OWNER'S OPERATIONS. E. PERFORM WORK WITH WORKMEN SKILLED IN THE TRADES INVOLVED. PREPARE SAMPLE AREA OF EACH TYPE OF WORK FOR APPROVAL. F. CUTTING: USE CUTTING TOOLS, NOT CHOPPING TOOLS. MAKE NEAT HOLES. MINIMIZE DAMAGE TO ADJACENT WORK. INSPECT FOR CONCEALED UTILITIES AND STRUCTURE BEFORE CUTTING. G. PATCHING: MAKE PATCHES, SEAMS, AND JOINTS DURABLE AND INCONSPICUOUS. COMPLY WITH TOLERANCES FOR NEW WORK. H. CLEAN WORK AREA AND AREAS AFFECTED BY CUTTING AND PATCHING OPERATIONS DIVISION 2 - SITE WORK NOT USED DIVISION 3 - CONCRETE NOT USED DIVISION 4 - MASONRY NOT USED DIVISION 5 - METALS 05400 METAL FRAMING A. AFTER CHALK LINES ARE SET, PRIOR TO START OF INSTALLATION OF METAL FRAMING, MEET AT THE SITE WITH ARCHITECT AND INSTALLERS OF OTHER WORK INCLUDING DOOR AND WINDOW FRAMES, TO REVIEW AREAS OF POTENTIAL CONFLICTS, AND TO COORDINATE LAYOUT AND SUPPORT PROVISIONS FOR INTERFACING WORK. B. PROVIDE MANUFACTURER'S STANDARD STEEL RUNNERS, REINFORCEMENTS, FASTENERS, AND ACCESSORIES AS NEEDED TO PROVIDE A COMPLETE METAL FRAMING SYSTEM. C. PROVIDE MATERIAL GAGES PER STUD MANUFACTURER'S RECOMMENDATIONS, BUT NOT LESS THAN GAGES INDICATED ON THE DRAWINGS. D. INSTALL CONTINUOUS TRACKS SIZED TO MATCH STUDS. SET STUDS PLUMB AND SECURE STUDS TO TOP AND BOTTOM RUNNER TRACKS BY WELDING OR SCREW FASTENING AT BOTH INSIDE AND OUTSIDE FLANGES. E. INSTALL SUPPLEMENTARY FRAMING, BLOCKING AND BRACING IN METAL FRAMING SYSTEM WHEREVER WALLS OR PARTITIONS ARE INDICATED TO SUPPORT FIXTURES, EQUIPMENT, SERVICES, CASEWORK, HEAVY TRIM AND FURNISHINGS, AND SIMILAR WORK REQUIRING ATTACHMENT TO THE WALL OR PARTITION. WHERE TYPE OF SUPPLEMENTARY SUPPORT IS NOT OTHERWISE INDICATED, COMPLY WITH STUD MANUFACTURER'S RECOMMENDATIONS AND INDUSTRY STANDARDS. STUDS ARE TO BE SPACED AT 12" o.c. (MAXIMUM) WHERE SUPPORTING WALL-HUNG CASEWORK OR EQUIPMENT. F. FRAME DOOR OPENINGS WITH DOUBLE 20 GAGE STUDS (MINIMUM) EACH JAMB. PROVIDE DIAGONAL STUD BRACE TO SLAB ABOVE AT BOTH SIDES OF OPENING (TO ALTERNATE SIDES OF PARTITION). G. FRAME WALL OPENINGS LARGER THAN ONE FOOT SQUARE WITH DOUBLE STUDS AT EACH JAMB OF FRAME EXCEPT WHERE MORE THAN TWO ARE EITHER SHOWN OR INDICATED IN MANUFACTURER'S INSTRUCTIONS. INSTALL RUNNER TRACKS AND JACK STUDS ABOVE AND BELOW WALL OPENINGS. ANCHOR TRACKS TO JAMB STUDS. SPACE JACK STUDS PER FULL-HEIGHT STUDS. H. INSTALL HORIZONTAL STIFFENERS IN STUD SYSTEM WHERE RECOMMENDED BY STUD MANUFACTURER. PROVIDE DIAGONAL STUD BRACES TO SLAB ABOVE AT MID-SPAN OR 10'-0" o.c. (MAXIMUM) ON UN-BRACED PARTITION RUNS OVER 15'-0". DIVISION 6 - WOOD & PLASTICS 06001 GENERAL A. ONLY SECOND GROWTH, FSC (FOREST STEWARDSHIP COUNCIL)-CERTIFIED OR RECLAIMED/RECYCLED WOOD SHALL BE USED. NEW WOOD FROM OLD-GROWTH TEMPERATE RAINFOREST SOFTWOODS, INCLUDING WESTERN RED CEDAR, SITKA SPRUCE, WESTERN HEMLOCK, PACIFIC SILVER FIR AND COASTAL REDWOOD, SHALL NOT BE USED. 06400 ARCHITECTURAL WOODWORK A. FURNISH ALL ARCHITECTURAL CASEWORK AS SHOWN ON DRAWINGS AND SPECIFIED HEREIN. B. THE "QUALITY STANDARDS" OF THE ARCHITECTURAL WOODWORK INSTITUTE (AWI), LATEST EDITION, SHALL APPLY AND BY REFERENCE ARE HEREBY MADE A PART OF THIS SPECIFICATION. C. THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE FIRE RETARDANT: CABINETRY, COUNTERS, SHELVES. D. THE FOLLOWING COMPONENTS SHALL BE FIRE RETARDANT AS REQUIRED TO OBTAIN A CLASS 'C' FLAME SPREAD RATING (76-225) AS REQUIRED BY THE INTERNATIONAL BUILDING CODE: 1. STANDING AND RUNNING TRIM OF CROSS SECTIONAL AREA OVER TWO SQUARE INCHES. 2. INTERIOR WINDOW CASINGS 3. BLOCKING. NOTE: UNTREATED POPLAR HAS A FLAME SPREAD CLASSIFICATION OF 170-185 AND COMPLIES WITH CLASS 'C' RATING. E. SUBMITTALS: 1. SHOP DRAWINGS ON ALL ITEMS OF ARCHITECTURAL WOODWORK. 2. CATALOGUE CUTS ON ALL HARDWARE. 3. SAMPLES OF ALL FINISHES. F. ALL ITEMS SHALL BE "CUSTOM GRADE" (UNLESS NOTED OTHERWISE), AS DEFINED IN THE LATEST EDITION OF THE AWI "QUALITY STANDARDS". CASEWORK TO RECEIVE TRANSPARENT FINISH (STAIN) SHALL BE "PREMIUM" GRADE. G. DETAILS SHALL CONFORM TO FLUSH OVERLAY DESIGN (DOOR AND DRAWER FACES COVER THE FACE FRAMES OF CABINETS). THICKNESS OF ALL CABINET COMPONENTS SHALL COMPLY WITH AWI SPECIFICATIONS. I. WOOD TRIM AND MOLDINGS (e.g. DOOR CASINGS, BASE BOARDS, CHAIR RAILS) TO RECEIVE TRANSPARENT OR STAIN FINISH SHALL BE AS NOTED ON PLANS. PLAIN SLICED, GRADE 1 OR BETTER J. ALL SHELVES AND COUNTERTOPS SHALL BE PLYWOOD, UNLESS NOTED OTHERWISE. SHELVES SHALL BE 3/4" (MIN.) THICK FOR SPANS UP TO 36", 1" (MIN.) THICK FOR SPANS UP TO 48", UNLESS NOTED OTHERWISE. K. UNRESTRAINED VERTICAL SURFACES (e.g. DRAWER FACES) SHALL BE 3/4" THICK MEDIUM DENSITY FIBERBOARD (MDF). L. PLYWOOD AND MDF SUBSTRATES SHALL BE FORMALDEHYDE FREE. PLYWOOD SHALL BE EXTERIOR GRADE. MDF SHALL BE MEDITE (800.676.3339) "MEDEX" OR APPROVED EQUAL. PLYWOOD BLOCKING SHALL BE FIRE-RETARDANT TREATED. M. CLOSETS: 1. HANG ROD (HR): 1-1/4" DIA. POLISHED CHROME, HEAVY DUTY ROD. CENTERLINE @ 5'-6" A.F.F., 1'-0" OUT FROM BACK WALL. 4'-0" O.C. (MAX) SPAN BETWEEN SUPPORTS. METAL END SOCKETS (PER DAVE SANDERS #3369). 09/16/20