Loading...
HomeMy WebLinkAboutAN-4.2Plot Date: 8/25/2020 12:01:59 PM Filename: \\nelson.com\corpdata\Proj\bank Of America\IN\20.0000681.000-bofa Indianapolis Mlwm 5th Floor Refresh\DRAWINGS\A-I\3_CD\INW-044 BofA Indianapolis MLWM 5th Floor Refresh AN-4.2.dwg User: Edgardo Rivera-Ortiz Device: _AutoCAD PDF (General Documentation).pc3 PenTable: _NELSON-HALF.ctbAN-4.2 SPECIFICATIONS Proj. No: Drawn By: Project Manager: ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED ON SITE BY THE CONTRACTOR AND SUB-CONTRACTORS PRIOR TO PERFORMING THE WORK. THE PROJECT MANAGER SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. © NELSON WORLDWIDE, LLC 2020 ALL RIGHTS RESERVED Designer: Reviewed By: Approved By: Nelco Architecture, Inc. a licensed affiliate Phone: 30 West Monroe Street - Suite 200 Chicago, IL 60603-2409 (312) 263-6605 (312) 276-4340 Phone: 20.0000681.000 MJL ERO ERO/MBM MJL/VPD VPD Date:No: Description: By: Client: Sheet Title: Consultant: Project Title & Address: Seal: Sheet Number: INW-044 BofA Indianapolis MLWM 5th Floor Refresh 510 96th Street Indianapolis, IN 46240 OWNER'S PROJECT MANAGER Jones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL4-540-04-55 Chicago, IL 60661 T: 312.909.2139 E: leslie.soto@am.jll.com MEP ENGINEER Integrated Engineering Consultants, Inc. (IEC) Tim Vining 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T: 216.901.6711 E: tim.vining@iec-inc.cc GENERAL CONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.977.9255 E: tlc@midamericacontracting.com ISSUE FOR EARLY DEMOLITION 1 ERO 07.24.2020 ISSUE FOR ENGINEERING 2 ERO 07.31.2020 ISSUE FOR LONG LEAD ITEMS 3 ERO 07.31.2020 ISSUE FOR PERMIT 4 ERO 08.25.2020 09650RESILIENT FLOORING AND ACCESSORIES A. SHEET FLOORING: INSTALL OVER EXISTING CONCRETE. INSTALLATION MATERIALS AND PROCEDURES SHALL CONFORM STRICTLY WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. FLASH PATCH TO PROVIDE A SMOOTH, FLAT AND LEVEL SUBSTRATE USING ARDEX #SD-F “FEATHER FINISH” PORTLAND CEMENT BASED PATCHING MATERIALS (NOT GYPSUM BASED PATCHING MATERIALS). SUBSTRATE TO BE DRY, CLEAN AND FREE OF FOREIGN MATERIALS AND ADHESIVE RESIDUE PRIOR TO INSTALLATION. MAXIMUM SLOPE OF 1/8" PER 4 FEET. 1. CONTRACTOR SHALL PERFORM INITIAL MAINTENANCE (INITIAL CLEANING THEN CONSOLIDATION TREATMENT) PROCEDURES AFTER FLOORING INSTALLATION AS RECOMMENDED BY MANUFACTURER. TILE GRAINS MUST BE ALTERNATED 180 DEGREES. ADHESIVE: MANUFACTURER'S RECOMMENDED ADHESIVE, INSTALLED WITH RECOMMENDED NOTCHED TROWEL. 2. SCRIBE AND CUT SHEET FLOORING TO BUTT TIGHTLY TO VERTICAL SURFACES. INSTALL SHEET FLOORING SQUARE WITH ROOM. B. RUBBER BASE: 4" HIGH X 1/8" GAUGE THICK. STRAIGHT OR COVE BASE, AS INDICATED. SUBMIT SAMPLES FOR REVIEW. USE ROLLED GOODS TO MINIMIZE SEAM JOINTS. NO MORE THAN 1 SEAM PER WALL, 12' MINIMUM BETWEEN SEAMS IF MORE THAN 1 SEAM REQUIRED. PRE-FORMED CORNERS. NO JOINT TO BE WITHIN ONE FOOT OF AN OUTSIDE CORNER. C. VINYL REDUCING STRIP: SUBMIT SAMPLE FOR REVIEW. LOCATE REDUCING STRIP AT HINGE SIDE OF JAMB. PROVIDE AT ALL TRANSITIONS FROM NEW VCT TO EXISTING VCT OR EXPOSED CONCRETE, (UNLESS NOTED OTHERWISE) AND AT TRANSITIONS FROM CARPET TO VCT (WHERE NOTED). SIMILAR TO JOHNSONITE "REDUCER" MODEL #RRS-C AT VCT; "EDGE GUARD" MODEL #E.G.-G or H (SIZE AS REQUIRED BY CARPET) AT CARPET. COLOR TO MATCH BASE (U.N.O.) D. INSTALLATION: 1. ADHESIVES: USE ONLY LOW ODOR, LOW VOC, NON-TOXIC, WATER-BASED ADHESIVES. SUBMIT CATALOG CUTS WITH VOC RATINGS FOR REVIEW. ACCEPTABLE PRODUCTS INCLUDE BUT ARE NOT LIMITED TO: a. AMERICAN FORMULATING and MANUFACTURING (AFM) "SAFECOAT 3 in 1". 714.781.6860 b. CHICAGO ADHESIVE PRODUCTS COMPANY "CHAPCO SAFE-SET". 800.621.0220 c. ROBERTS 800.423.9467 E. VENTILATION: PROVIDE MAXIMUM MECHANICAL VENTILATION WITH MAXIMUM OUTSIDE AIR DURING INSTALLATION AND FOR A PERIOD OF 72 HOURS AFTER COMPLETION. F. PROVIDE ONE (1) FULL CARTON OF EACH COLOR AND TYPE OF VCT AND VINYL BASE, IN ADDITION TO REMAINDER CARTONS FROM THE INSTALLATION, TO THE OWNER AS “ATTIC STOCK”. STORE ON THE SITE, AS DIRECTED BY THE OWNER. 09680 CARPET A. GLUE DOWN INSTALLATION OVER EXISTING CONCRETE. FLASH PATCH FLOOR AS REQUIRED FOR SMOOTH INSTALLATION. B. SEAMS AT ROLL GOODS ARE TO BE SEALED WITH SEAM SEALER. C. CARPET, ADHESIVES AND PADS ARE TO CARRY THE INDOOR AIR QUALITY (IAQ) LABEL FROM THE CARPET AND RUG INSTITUTE (CRI). D. INSTALLATION: 1. INSTALLATION BY MANUFACTURER'S CERTIFIED DEALER. PROVIDE MANUFACTURER'S WARRANTEE FOR MATERIAL AND INSTALLATION. 2. ADHESIVES: USE ONLY LOW ODOR, LOW VOC, NON-TOXIC, WATER-BASED ADHESIVES. SUBMIT CATALOG CUTS WITH VOC RATINGS FOR REVIEW. ACCEPTABLE PRODUCTS INCLUDE BUT ARE NOT LIMITED TO: a. AMERICAN FORMULATING and MANUFACTURING (AFM) "SAFECOAT ALMIGHTY". 714.781.6860 b. CHICAGO ADHESIVE PRODUCTS COMPANY "CHAPCO SAFE-SET". 800.621.0220 c. BENTLEY "HEALTHGUARD". 818.333.4585 3. VENTILATION: PROVIDE MAXIMUM MECHANICAL VENTILATION WITH MAXIMUM OUTSIDE AIR DURING INSTALLATION AND FOR A PERIOD OF 72 HOURS AFTER COMPLETION. 4. COMPLY WITH MANUFACTURER'S RECOMMENDATIONS FOR SEAM LOCATIONS AND DIRECTION OF CARPET; MAINTAIN UNIFORMITY OF CARPET DIRECTION AND LAY OF PILE. AT DOORS, CENTER SEAMS UNDER DOORS. DO NOT PLACE SEAMS IN DIRECTION OF TRAFFIC. 4. COMPLY WITH MANUFACTURER'S RECOMMENDATIONS FOR DIRECTION OF CARPET TILE; MAINTAIN UNIFORMITY OF CARPET DIRECTION AND LAY OF PILE (UNLESS NOTED OTHERWISE). 5. EXTEND CARPET UNDER OPEN-BOTTOMED OBSTRUCTIONS AND UNDER REMOVABLE FLANGES AND FURNISHINGS. E. MAINTENANCE PROGRAM: MANUFACTURER'S CERTIFIED DEALER TO SUBMIT A PROPOSAL FOR A YEARLY CARPET MAINTENANCE PROGRAM. 09690 CARPET TILE A. CARPET TILE INSTALLATION OVER EXISTING CONCRETE OR VCT FLOORING. FULL COVERAGE WITH RELEASABLE ADHESIVE. FLASH PATCH FLOOR AS REQUIRED FOR SMOOTH INSTALLATION. B. CARPET, ADHESIVES AND PADS ARE TO CARRY THE INDOOR AIR QUALITY (IAQ) LABEL FROM THE CARPET AND RUG INSTITUTE (CRI). C. INSTALLATION: 1. INSTALLATION BY MANUFACTURER'S CERTIFIED DEALER. PROVIDE MANUFACTURER'S WARRANTEE FOR MATERIAL AND INSTALLATION. 2. ADHESIVES: USE ONLY LOW ODOR, LOW VOC, NON-TOXIC, WATER-BASED ADHESIVES. SUBMIT CATALOG CUTS WITH VOC RATINGS FOR REVIEW. ACCEPTABLE PRODUCTS INCLUDE BUT ARE NOT LIMITED TO: a. AMERICAN FORMULATING and MANUFACTURING (AFM) "SAFECOAT ALMIGHTY". 714.781.686 b. CHICAGO ADHESIVE PRODUCTS COMPANY "CHAPCO SAFE-SET". 800.621.0220 c. BENTLEY "HEALTHGUARD". 818.333.4585 3. VENTILATION: PROVIDE MAXIMUM MECHANICAL VENTILATION WITH MAXIMUM OUTSIDE AIR DURING INSTALLATION AND FOR A PERIOD OF 72 HOURS AFTER COMPLETION. 10.DO NOT USE STEEL WOOL OR WATER BASED FINISHES ON FIRE RATED DOORS. 11.DOORS PREFINISHED AT THE FACTORY SHOULD BE CHECKED AGAINST APPROVED FINISH SAMPLE PRIOR TO HANGING (INSTALLATION OF PREFINISHED DOORS SHALL CONSTITUTE ACCEPTANCE). D. MAINTENANCE: A COMPLETE AND CONTINUOUS FINISH MUST BE MAINTAINED ON ALL SURFACES OF THE DOOR. E. CONDITIONS: 1. DOORS SHOULD BE MANUFACTURED ACCORDING TO WARNOCK-HERSEY'S AND U.L.'S EXACTING SPECIFICATIONS AND CARRY THEIR CERTIFICATION LABELS. 2. 90 MINUTE DOORS MUST CARRY U.L. CLASSIFICATION AND c.U.L 08700 HARDWARE 1. SEE HARDWARE SCHEDULE FOR HARDWARE SPECIFICATION. 08800 GLAZING A. INTERIOR GLASS DOORS: 1. GLASS AT DOORS AND INTERIOR WINDOWS. SAFETY GLASS (LAMINATED OR TEMPERED). 2. CLEAR FLOAT: 3 8 " THICKNESS, TYPE I (TRANSPARENT GLASS, FLAT), CLASS 1, QUALITY q3. B. INTERIOR GLASS PANELS: 1. CLEAR: 3/8" CLEAR LAMINATED OR TEMPERED SAFETY GLASS. TYPE I (TRANSPARENT GLASS, FLAT), CLASS 1, QUALITY q3. 2. GLAZING CHANNELS: CONCEALED AT SILL AND HEAD. EXTRUDED ALUMINUM FOR 3/8" THICK GLASS. SETTING BLOCKS AND GASKETS. FINISH: CLEAR ANODIZED, SATIN LUSTRE. SUBMIT CATALOG CUT AND MATERIAL SAMPLE FOR REVIEW. DIVISION 9 - FINISHES 09000 GENERAL A. SEE FINISHES SCHEDULE AND FINISHES LEGEND FOR FINISH MATERIALS. B. INSTALLATION MATERIALS AND PROCEDURES SHALL CONFORM STRICTLY WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. C. CONTRACTOR SHALL PERFORM ALL MANUFACTURER'S RECOMMENDED INITIAL MAINTENANCE PROCEDURES FOR ALL NEW FINISHES. D. PRIOR TO INSTALLATION OF FINISHES, CONTRACTOR SHALL REVIEW AND TEST ALL SUBSTRATES FOR COMPLIANCE WITH MANUFACTURER'S RECOMMENDATIONS. WHEN AN EXISTING SUBSTRATE DOES NOT COMPLY WITH MANUFACTURER'S RECOMMENDATIONS, THE CONTRACTOR SHALL SUBMIT A SCOPE AND COST PROPOSAL FOR THE WORK REQUIRED TO BRING THE SUBSTRATE INTO COMPLIANCE, PRIOR TO THE START OF CONSTRUCTION. 09250 GYPSUM BOARD A. DRYWALL CONSTRUCTION, MATERIAL AND WORKMANSHIP PER ANSI A97.1 AND UNITED STATES GYPSUM CO. SPECIFICATIONS WITH CORNER BEADS, "J" BEADS AND "L" BEADS AND ALL ACCESSORIES. THREE SKIM COATS OF COMPOUND ON ALL JOINTS, FASTENERS AND METAL FLANGES. TEMPERATURE IN WORK SPACES SHALL BE MAINTAINED ABOVE 65 DEGREES F. BOTH DAY AND NIGHT, BEGINNING 24 HOURS BEFORE THE START OF INSTALLATION. OBTAIN ALL COMPONENTS AND MATERIAL OF THE DRYWALL SYSTEM FROM A SINGLE MANUFACTURER. B. DRYWALL: ASTM C36, 5/8" THICKNESS, FIRECODE TYPE 'C', TAPERED EDGES, REGULAR AND WATER RESISTANT (GREEN) GRADES. SAG-RESISTANT TYPE FOR CEILING SURFACES. [ABUSE RESISTANT GYPSUM FIBER PANELS: UNITED STATES GYPSUM CO. “FIBEROCK VHI”.] SCREW (1X6) FASTENERS; WALLS @ 8" O.C., CEILING @ 7" O.C. C. TAPABLE METAL 'J' BEAD: USG SERIES 200, OR EQUAL. D. RIGID VINYL 'J' BEAD: USG RP SERIES, OR EQUAL. FOR USE AT ALUMINUM MULLIONS AND TRIM. E. GYPSUM BOARD FINISH: SMOOTH F. WATER RESISTANT (GREEN) GRADE GWB AT BATHROOMS (ALL WALLS) AND AT PLUMBING WALLS (BOTH SIDES), e.g. AT SINKS, DRINKING FOUNTAINS, etc. G. AT ACOUSTICAL PARTITIONS, SET THE END OF THE INNER LAYER OF GYPSUM BOARD IN A CONTINUOUS HEAVY BEAD OF ACOUSTICAL SEALANT SET ADJACENT TO THE STUD TRACK RUNNER, AT TOP AND BOTTOM OF THE PARTITION, ON EACH SIDE OF THE STUDS. 09300 CERAMIC TILE A. INSTALLATION SHALL COMPLY WITH THE FOLLOWING TILE COUNCIL OF AMERICA (TCA) METHODS AND WITH THE RECOMMENDATIONS OF THE TILE SUPPLIERS AND MANUFACTURERS. SEE FINISH SCHEDULE FOR INSTALLATION METHOD. 1. THIN SET: F113 2. MUD SET: F111 (CONCRETE SLAB) 3. BOND COAT (FLOORS AND WALLS): LATEX-PORTLAND CEMENT MORTAR. (ANSI A118.4). 4. GROUT: (WALLS) LATEX-PORTLAND CEMENT, 1/16" JOINT THICKNESS, COLOR: WHITE 5. SILICONE SEALANT: MILDEW-RESISTANT, COLOR TO MATCH GROUT. INSTALL AROUND PLUMBING FIXTURES, SLATE SADDLES, ETC. 09500 ACOUSTICAL TILE CEILING A. LEVEL CEILING TO WITHIN 1/8" IN 10' IN BOTH DIRECTIONS. SCRIBE AND CUT PANELS TO FIT ACCURATELY. B. SUBMIT SAMPLE PER BAC GUIDLINES. SUBMIT ALTERNATE FOR SOUND ATTENUATION. C. ACOUSTICAL TILE CEILING GRID TO BE SUPPORTED WITH No. 12 SWG GALVANIZED STEEL WIRE, TWIST-TIED TO STEEL JOISTS OR APPROVED HANGER CLIPS. SPACING: 48" o.c. MAXIMUM ON MAIN RUNNERS, ADJACENT TO CROSS TEE INTERSECTIONS. ONE HANGER WIRE TO OCCUR AT ALL FOUR CORNERS OF LIGHT FIXTURES, AT MID SPAN OF CROSS TEES ADJACENT TO 4' LIGHT FIXTURES AND AIR DUCT OUTLETS, AND ADJACENT TO EACH MAIN RUNNER SPLICE. INSTALLATION AND MATERIALS SHALL CONFORM TO ASTM C 636-96. INSTALLATION AND MATERIALS IN AREA REQUIRING SEISMIC RESTRAINT (IBC SEISMIC DESIGN CATEGORY C (SEISMIC ZONES 0-2) OR CATEGORIES D, E OR F (SEISMIC ZONES 3 & 4)) SHALL CONFORM TO ASTM E 580-00. D. PROVIDE ONE (1) FULL CARTON OF EACH TYPE OF ACOUSTICAL CEILING TILE (EXCLUDING METAL INFILL PANELS), IN ADDITION TO ANY REMAINDER CARTONS FROM THE INSTALLATION, TO THE OWNER AS “ATTIC STOCK”. STORE ON THE SITE, AS DIRECTED BY THE OWNER. N. INSTALL WOODWORK PLUMB, LEVEL, TRUE AND STRAIGHT WITH NO DISTORTIONS. SHIM AS REQUIRED WITH CONCEALED SHIMS. INSTALL TO A TOLERANCE OF 1/8 INCH IN 8'-0" FOR PLUMB AND LEVEL (INCLUDING TOPS) AND WITH NO VARIATIONS IN FLUSHNESS OF ADJOINING SURFACES. O. SCRIBE AND CUT WOODWORK TO FIT ADJOINING WORK AND REFINISH CUT SURFACES OR REPAIR DAMAGED FINISH AT CUT. P. FIRE-RETARDANT TREATED WOOD: HANDLE, STORE, AND INSTALL FIRE-RETARDANT TREATED WOOD TO COMPLY WITH RECOMMENDATIONS OF CHEMICAL TREATMENT MANUFACTURER INCLUDING THOSE FOR ADHESIVES WHERE THEY ARE USED TO INSTALL WOODWORK. Q. ANCHOR WOODWORK TO ANCHORS OR BLOCKING BUILT IN OR DIRECTLY ATTACHED TO SUBSTRATES. SECURE TO GROUNDS, STRIPPING AND BLOCKING WITH COUNTERSUNK, CONCEALED FASTENERS AND BLIND NAILING AS REQUIRED FOR A COMPLETE INSTALLATION. EXCEPT WHERE PRE-FINISHED MATCHING FASTENER HEADS ARE REQUIRED, USE FINE FINISHING NAILS FOR EXPOSED NAILING, COUNTERSUNK AND FILLED FLUSH WITH WOODWORK AND MATCHING FINAL FINISH WHERE TRANSPARENT FINISH IS INDICATED. R. ALTERNATE SPECIES AND FINISHES GRADES TO BE SUBMITTED FOR COST SAVINGS AS APPROPRIATE. DIVISION 7 - THERMAL & MOISTURE PROTECTION 07200 INSULATION A. SOUND ATTENUATING FIRE BATTS: USG "THERMAFIBER" SAFB. 2.5 lbs/cu.ft. B. POUR-IN-PLACE URETHANE FOAM: FOMO PRODUCTS "HANDI FOAM" QUICK CURE FOAM A1617. C. SPRAY-FOAM INSULATION: DOW INDUSTRIES "STYROFOAM" SPRAY POLYURETHANE FOAM. D. THERMAL BARRIER FILM COATING: Flame Seal-Tb - (AQUEOUS BASED RESIN) SPRAY APPLIED FIRE PROTECTIVE INTUMESCENT COATING 07270 FIRESTOPPING A. PENETRATIONS THROUGH FLOORS AND FIRE-RATED PARTITIONS (SHAFT WALLS, STAIR ENCLOSURES, ETC.) SHALL BE COMPLETELY FIRESTOPPED TO MAINTAIN CODE REQUIRED FIRE-RATING. 1. HILTI SINGLE COMPONENT SILICONE ELASTOMER SEALANT, ONE COMPONENT CERAMIC BASE PUTTY FILLER, OR TWO COMPONENT FOAM, AS REQUIRED BY LOCATION OF PENETRATION. 2. USG "THERMAFIBER FIRE/SMOKE-STOP SYSTEM". 2-1/2" UNFACED "THERMAFIBER" SAFING FRICTION FIT INTO OPENING AROUND PIPE, TOPPED WITH A 2" LAYER OF "THERMAFIBER SMOKE SEAL" COMPOUND (AT WALLS, APPLY 2" OF COMPOUND ON BOTH SIDES OF WALL). UL 165, 2 AND 3 HOUR FIRE RATING. B. SUBMIT PRODUCT DATA FOR REVIEW. 07900 JOINT SEALANTS A. AT PARTITIONS: CLEAR SILICONE ACOUSTICAL SEALANT. B. AT WINDOW AND DOOR FRAMES (INTERIOR) AND CASEWORK: WHITE LATEX CAULK (PAINTABLE). C. AT GLASS STOPS (WINDOWS AND DOORS): CLEAR SILICONE SEALANT. D. AT KITCHEN FIXTURES: MILDEW RESISTANT SILICONE SEALANT. COLOR TO MATCH GROUT. E. NON-HARDENING ACOUSTICAL SEALANT AND INSULATION AT ALL PENETRATIONS THROUGH ACOUSTICAL PARTITIONS. DIVISION 7 - DOORS AND WINDOWS 08200 WOOD DOORS A. SOLID CORE AND VENEER IS TO MATCH ARCHITECT'S SPECIFICATION - PROVIDE SAMPLE. B. TOLERANCES: 1. WARP SHALL NOT BE CONSIDERED A DEFECT UNLESS IT EXCEEDS 1/4 INCH IN THE PLANE OF THE DOOR ITSELF. FOR DOORS 1-3/4 INCH OR THICKER, WARP SHALL NOT EXCEED 1/4 INCH IN DOORS 3'-6" x 7'-0" OR SMALLER, NOR SHALL IT EXCEED 1/4 INCH IN DOORS 3'-6" x 7'-0" SECTION OF LARGER DOORS. WARP IS ANY DISTORTION IN THE DOOR ITSELF AND DOES NOT REFER TO THE RELATIONSHIP OF THE DOOR TO THE FRAME JAMB, OR ADJACENT DOORS. WARP IS MEASURED BY PLACING A STRAIGHT EDGE ON CONCAVE FACE AND DETERMINING THE MAXIMUM DISTANCE FROM STRAIGHT EDGE TO THE DOOR FACE. C. HANDLING, FINISHING, AND INSTALLATION INSTRUCTIONS: 1. STORE DOORS FLAT ON A LEVEL SURFACE IN DRY, WELL VENTILATED BUILDING. COVER DOORS TO KEEP CLEAN AND AVOID DISCOLORATION WITH AN OPAQUE COVERING WHICH DOES NOT PERMIT LIGHT TO PENETRATE. COVERING MUST ALLOW AIR CIRCULATION. IF DOORS ARE TO BE STORED MORE THAN A WEEK ALL EDGES MUST BE SEALED. 2. DOORS SHOULD NOT BE SUBJECTED TO EXTREMES OF HEAT, DRY OR HUMID CONDITION. RELATIVE HUMIDITY SHOULD NOT BE LESS THAN 30% OR GREATER THAN 60%. 3. HANDLE WITH CLEAN GLOVES AND DO NOT DRAG DOOR ACROSS ONE ANOTHER OR ACROSS OTHER SURFACES. 4. THE UTILITY OR STRUCTURAL STRENGTH OF THE DOORS MUST NOT BE IMPAIRED IN THE FITTING OF THE DOOR, THE APPLICATION OF HARDWARE, OR CUTTING AND ALTERING FOR LIGHTS, LOUVERS, PANELS OR ANY OTHER SPECIAL DETAILS. 5. USE THREE HINGES FOR DOORS 7'-6" IN HEIGHT OR LESS, FOUR HINGES ON DOORS OVER 7'-6". ALLOWING A FITTING VARIANCE OF 1/8 INCH AT EACH SIDE AND AT THE TOP. 6. CAREFULLY SEAL ALL EDGES IMMEDIATELY AFTER FITTING INCLUDING AREAS ROUTED FOR CONCEALED CLOSURES AND OTHER HARDWARE. 7. BEFORE FINISHING, THE FINISHER MUST DO A THOROUGH FINAL SANDING OVER ALL SURFACES USING 150 GRIT SANDPAPER, DEPENDING ON ALL SPECIES, AND IN CONJUNCTION WITH A HAND BLOCK OR ORBITAL SANDER IN ORDER TO REMOVE ALL SCUFFS, HANDLING MARKS, SCRATCHES, RAISED GRAIN, BURNISHES AND EFFECTS OF EXPOSURE TO MOISTURE THAT MAY OCCUR DURING HANDLING, UNLOADING AND STORAGE. 8. IMMEDIATELY AFTER FITTING AND BEFORE HANGING, THE ENTIRE DOOR INCLUDING TOP AND BOTTOM EDGES MUST RECEIVE TWO COATS OF GOOD QUALITY LACQUER. 9. SOME WOODS, PARTICULARLY OAK, CONTAIN CHEMICALS WHICH REACT WITH IRON OR SOME FINISHING MATERIALS. DO NOT USE STEEL WOOL ON OAK DOORS. 4. COMPLY WITH MANUFACTURER'S RECOMMENDATIONS FOR DIRECTION OF CARPET TILE; MAINTAIN UNIFORMITY OF CARPET DIRECTION AND LAY OF PILE (UNLESS NOTED OTHERWISE). 5. EXTEND CARPET UNDER OPEN-BOTTOMED OBSTRUCTIONS AND UNDER REMOVABLE FLANGES AND FURNISHINGS. G. PREPARATION: 1. EXISTING PLASTER AND DRYWALL: REMOVE ALL PEELING AND SCALING PAINT. SAND AREAS THOROUGHLY TO FEATHER EDGES SMOOTH WITH ADJACENT SURFACES. CRACKS, HOLES AND BLEMISH AREAS ARE TO BE FILLED AND SANDED FLUSH WITH ADJACENT AREAS. GLOSSY SURFACES SHOULD BE DULLED BY SANDING LIGHTLY WITH A #00 SANDPAPER. 2. DRYWALL: ALL SURFACES MUST BE FREE OF SANDING DUST AND JOINT TREATMENT CEMENT SHOULD BE THOROUGHLY DRY. DAMAGED OR DEFECTIVE SURFACES ARE TO BE REPAIRED BY SPACKLING, OR BY OTHER APPROPRIATE MEASURES AS DEEMED NECESSARY BY THE ARCHITECT. STEEL CORNER BEADS ARE TO BE COATED WITH A SEALER/PRIMER BEFORE APPLYING FINISH COAT. 3. WOOD: ALL SURFACES SHOULD BE DRY AND SANDED SMOOTH, FREE OF LOOSE DIRT, DUST AND OIL. PUTTY ALL NAILHOLES, CRACKS, AND BLEMISHES AFTER UNDERCOATER HAS BEEN APPLIED. KNOTS ARE TO BE COATED WITH KNOT SEALER. 4. EXISTING METAL: REMOVE ALL PEELING AND SCALING PAINT. SAND AREAS THOROUGHLY TO FEATHER EDGES SMOOTH WITH ADJACENT SURFACES. HOLES AND BLEMISH AREAS ARE TO BE FILLED AND SANDED FLUSH WITH ADJACENT AREAS. GLOSSY SURFACES SHOULD BE DULLED BY SANDING LIGHTLY WITH #00 SANDPAPER. ALL SURFACES SHOULD BE DRY, FREE OF LOOSE DIRT, DUST AND OIL. 5. EXISTING MASONRY, CMU AND CONCRETE: REMOVE ALL PEELING AND SCALING PAINT TO A SOUND SUBSTRATE. REMOVE ALL MILDEW. REMOVE PRIOR APPLICATIONS OF CEMENT BASED PAINT AND MULTIPLE COATS OF PAINT IN AN ADVANCED STATE OF DETERIORATION. REMOVE OLD CRACKED AND LOOSE CAULKING AND REPLACE WITH SILICONE SEALANT. FILL OR REPOINT ALL STRUCTURAL CRACKS AND CREVICES WITH APPROPRIATE PATCHING COMPOUNDS. SURFACES MUST BE CLEAN AND FREE OF ALL WAX, GREASE, OIL, DIRT, LOOSE OR FLAKING MATERIAL, ACID SUBSTANCES AND SOAP DEPOSITS. H. FINISHES: 1. MATERIAL: CUSTOM COLORS, BEST QUALITY GRADE. 2. WALLS: 1 COAT LATEX PRIMER (NEW GWB ONLY); 2 COATS LATEX, EGGSHELL. 3. WOOD FOR OPAQUE FINISH AND METAL: 1 COAT LATEX PRIMER (NEW SURFACES ONLY); 2 COATS ACRYLIC LATEX. 4. WOOD (STAIN): INTERIOR GRADE PENETRATING STAIN, TWO COATS, MATCH ARCHITECT'S SAMPLE. TWO COAT ACRYLIC VARNISH, SATIN FINISH. SUBMIT FINISH SAMPLE. 5. CEILINGS (GWB/PLASTER): 1 COAT LATEX PRIMER; 2 COATS LATEX FLAT. 09950 WALL COVERING: A. PREPARE AND PRIME SURFACE (FILL VOIDS, ETC.) AND INSTALL WALL COVERING PER MANUFACTURER'S RECOMMENDATIONS. B. FINISH CLASS 'A', FLAME SPREAD RATING 10; SMOKE DEVELOPED FACTOR 20. C. INSTALLATION: 1. PRIMER AND PASTE SHALL BE FORMALDEHYDE FREE AND SHALL HAVE A LOW VOC CONTENT. ROMAN ADHESIVES, Inc (800.356.5595), OR APPROVED EQUAL. 2. VENTILATION: PROVIDE MAXIMUM MECHANICAL VENTILATION WITH MAXIMUM OUTSIDE AIR DURING INSTALLATION AND FOR A PERIOD OF 72 HOURS AFTER COMPLETION. D. SUBMIT SAMPLE FOR REVIEW. DIVISION 10 - SPECIALTIES 10520 FIRE EXTINGUISHERS AND CABINETS A. SUBMIT CATALOGUE CUT FOR REVIEW. B. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. SEE MANUFACTURER'S LITERATURE FOR REQUIRED CLEARANCES AND BLOCKING. C. SEE EQUIPMENT SCHEDULE FOR MANUFACTURER AND MODEL NUMBER DIVISION 11 - EQUIPMENT 11450 APPLIANCES A. SUBMIT CATALOGUE CUTS OF ALL APPLIANCES FOR REVIEW. B. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. SEE MANUFACTURER'S LITERATURE FOR REQUIRED CLEARANCES, UTILITY ROUGHING REQUIREMENTS AND LOCATIONS. PROVIDE ALL REQUIRED UTILITY AND PLUMBING CONNECTIONS. C. SEE EQUIPMENT SCHEDULE FOR MANUFACTURERS AND MODEL NUMBERS DIVISION 12 - FURNISHINGS 122000 WINDOW TREATMENT A. SEE FINISH PLANS FOR WINDOW TREATMENT. DIVISION 13 - SPECIAL CONSTRUCTION NOT USED DIVISION 14 - CONVEYING SYSTEMS NOT USED DIVISION 22 - PLUMBING 224000 PLUMBING FIXTURES NOT USED DIVISION 26 - ELECTRICAL 260000 GENERAL A. ALL ELECTRICAL WORK TO BE PERFORMED BY A LICENSED ELECTRICIAN, WHO SHALL ARRANGE FOR AND OBTAIN ALL REQUIRED PERMITS, APPROVALS, INSPECTIONS AND SIGN-OFFS. B. ALL ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT NATIONAL ELECTRICAL CODE. C. ALL OUTLETS IN BATHROOMS, KITCHENS, AND AT THE EXTERIOR ARE TO BE GROUND FAULT INSULATED. D. INSTALL FIXTURES AS PER MANUFACTURER'S SPECIFICATIONS. E. PROVIDE WIRING FOR POWER AND CONTROL OF ALL NEW OR RELOCATED EQUIPMENT, APPLIANCES, AND HVAC EQUIPMENT. ELECTRICIAN TO VERIFY ALL WIRING/RECEPTACLE REQUIREMENTS. FINAL CONNECTIONS TO MOTORS TO BE FLEXIBLE STEEL CONDUIT. F. ALL WORK SHALL BE COORDINATED WITH THE OTHER TRADES TO AVOID CONFLICTS. G. ALL NECESSARY CUTTING AND PATCHING FOR THE WORK TO BE PERFORMED BY THIS CONTRACTOR. H. ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THIS WORK. I. CONTRACTOR TO FURNISH AND INSTALL BOXES, FITTINGS, DEVICES, RACEWAYS, CONDUCTORS, CONNECTIONS, MFG. ACCESSORIES, ADAPTERS, AND ALL OTHER MATERIALS, EQUIPMENT AND LABOR EQUIPMENT NECESSARY FOR A COMPLETE ELECTRICAL INSTALLATION. J. ALL CONDUITS TO BE CONCEALED UNLESS OTHERWISE NOTED. K. CONTRACTOR SHALL MAINTAIN CONTINUITY OF ALL ELECTRICAL SYSTEMS TO ALL AREAS NOT COVERED BY THIS RENOVATION AND SHALL PROVIDE 48 HOURS NOTICE TO BUILDING MANAGEMENT AND TENATNT OF ANY PLANNED INTERRUPTIONS TO POWER OR SIGNAL SYSTEMS. L. TEST SYSTEM FOLLOWING INSTALLATION OF FIXTURES. SYSTEM SHALL BE FREE OF SHORT CIRCUITS AND GROUNDS AND SHALL SHOW INSULATION RESISTANCE BETWEEN CONDUCTORS AND GROUND ON MAXIMUM LOAD NOT LESS THAN REQUIREMENTS OF THE ELECTRICAL CODE. M. ADD TYPEWRITTEN LABELS TO PANEL DIRECTORIES INDICATING CIRCUITS USED FOR THIS WORK, IN A MANNER ACCEPTABLE TO THE ARCHITECT AND TENANT. N. UPON COMPLETION OF ELECTRICAL WORK, THE CONTRACTOR SHALL FURNISH THE TENANT WITH REPRODUCIBLE SET OF AS-BUILT DRAWINGS WHICH SHALL SHOW THE FOLLOWING INFORMATION: 1. LOCATION OF ALL RECEPTACLES, SWITCHES, LIGHT FIXTURES, AC UNITS, MOTORS, ETC. 2. ROUTING AND DESIGNATION OF ALL BRANCH CIRCUITS. 3. LOCATION OF ALL JUNCTION BOXES AND PULL BOXES. 4. WIRE SIZE WHERE WIRE LARGER THAN 2 #12 IS USED DEVICES A. POWER TEL/DATA WALL OUTLET DEVICES AND PLATES SHALL BE WHITE, MOUNTED WITH THE CENTERLINE AT 18" a.f.f., UNLESS NOTED OTHERWISE. COLOR CODE RECEPTACLES: PER BAC STANDARD B. SWITCH DEVICES AND PLATES SHALL BE WHITE, MOUNTED WITH THE CENTERLINE AT 4'-0" a.f.f., UNLESS NOTED OTHERWISE. DOOR RELEASE PUSH BUTTONS SHALL BE MOUNTED WITH THE CENTERLINE AT 3'-2" a.f.f. C. FIRE ALARM STROBE AND SPEAKER DEVICES AND PLATES SHALL BE WHITE. D. FLOOR BOXES SHALL BE AS FOLLOWS: 1. AT POKE THRU'S: a. RACEWAY COMPONENTS #RC-700-6-A, (WITH TILE GASKET AT HARD FLOORS). TEL OR DATA: RACEWAY COMPONENTS #RC-900-FF-1.25, WITH 1-1/4" KNOCKOUT IN TOP OF HOUSING, (AND TILE GASKET AT HARD FLOORS). NOTE: OMIT BARRIERS AND 'CA' ADAPTER. E. FOR OUTLETS: 1. AT POKE THRU'S: a. RACEWAY COMPONENTS #RC-700-A (DUPLEX) AND #RC-900-A (QUAD), (WITH TILE GASKET AT HARD FLOORS). COORDINATE WITH AMPS. b. NOTE: FOR SPECIAL PURPOSE RECEPTACLES, SUBSTITUTE SURFACE MTD. HOUSING (SUCH AS #FIT-200 SERIES) WITH APPROPRIATE FITTINGS. TEL OR DATA: RACEWAY COMPONENTS #RC-900-A-M-D, (WITH TILE GASKET AT HARD FLOORS). " END OF SPECIFICATIONS 09900 PAINTING A.PREPARATION FOR EXECUTION OF FINISHES: INSPECT ALL SURFACES TO BE FINISHED. NOTIFY THE ARCHITECT OF ANY DEFECTS, IMPROPER WORKMANSHIP OF MATERIALS OR CONDITIONS UNSUITABLE FOR FINISHING. ABSENCE OF NOTIFICATION CONSTITUTES ACCEPTANCE OF ALL SURFACES, THE RESPONSIBILITY OF THE FINAL APPEARANCE, AND WAIVES ANY SUBSEQUENT CLAIM TO THE CONTRARY. B.REFER TO FINISH SCHEDULE, DRAWING A05.2, FOR PAINT COLORS AND MANUFACTURERS. C.OBTAIN BLOCK FILLERS, PRIMERS AND UNDERCOAT MATERIALS FOR EACH COATING SYSTEM FROM THE SAME MANUFACTURER AS THE FINISH COAT. D.ALL NEW AND EXISTING SURFACES ARE TO BE PAINTED, UNLESS NOTED OTHERWISE. COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS FOR SURFACE PREPARATION, ENVIRONMENTAL AND SUBSTRATE CONDITIONS, PRODUCT MIXING AND APPLICATION. PRE-FINISHED METAL SURFACES (ALUMINUM, BAKED ENAMEL, ETC.) ARE NOT TO BE PAINTED (U.N.O.). E.COVER ALL SURFACES WITH DROPCLOTHES. REMOVE ALL FINISHING ITEMS SUCH AS ESCUTCHEONS, ELECTRICAL PLATES, ETC., AND STORE IN SAFE PLACE ON SITE. F.UPON COMPLETION, 1 TO 2 GALLONS OF ALL FINISHING MATERIALS USED HEREIN SHALL BE STORED ON THE SITE, AS DIRECTED BY THE OWNER. 09/16/20