Loading...
HomeMy WebLinkAboutA420 - STAIR TYPICAL DETAILSCCORNERSTONE :. � �M�R CR\ ■ STRUCTUREPOINT �,� �� METALBRACKETS (�j a8" (O.0 ) TVPICAL i irz•� oin. sree� HAN�RAIL - PAINTE� „� WALLANCHOR METALBRACKE @ 48" 0 C. TVPI WOOD BLOCKIN TYPICAL WALL-MOUNTED HANDRAIL DETAIL 3,. _ �._�,. 1 �• 3/4"x 314" STEEL BARS - PAINTED EQUALLYSPACED 1 1/2" x 1 1/2" STEEL TUBES - PAIMED TOP AND BOTTOM 1 1/2" DIA. STEEL HANDRAIL � PAINTED � �12' x 1 �l2' STEEL TUBES AT 3'-0" O.G. MA%.�PAINTED HAN�RAIL BRACKET AT EACH VERTICAL TUBE. 11/T' �IA. STEEL HAN�RAIL- PAMTE� 314" x 3/4" STEEL BARS. PAINTED. EQUALLYSPACE� 1 VP' x 1 VP' STEEL TUBES- PAMTE� RETURN HANDRAIL BACK TO VERTICALTUBE STEEL STRINGER, PAINTE� HANDRAIL BRACKETATEACH LL a VERTICAL POST Q ? � � � STAIR TREA�S CONCRETE FILLED METAL PAN STAIRS - PROVIDE STAIR CLOSURE PLATE AT END OF STRINGERS � � RELEA5E0 FOR CONSTRIICTI�N Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel `v�a��\i 1�.rvalp/f �. DATE: O$�Z4I2O STAIRTREA�S. REFER � \ TO INT. FINISH DRAWINGS STEELCHANNEL STRINGER,PAINTED CONCRETE FlLLED METAL PAN STAIRS � STAIR DETAIL Aa20 314,• = 1•_0•• FLOORING. REFERTOINT.DWGS CLIP ANGLE - EXPANSION ANCHOR INTO FLOOR STAIR DETAIL 3/4" = 1'-0" � va• P�nrE ao: I 1/4" HOLE IN CEI 1 1/2" DIA. STEEI HAN�RAIL- PAIf � I I �1" I 11" �I� � � ¢ „a� , vr - � � � _ _ � � � < a ,� , FLOORING le , . STEEL STAIR STRINGER - PAINT � BV STAIR SUPPLIER � TYPICAL GUARDRAIL/HANDRAIL DETAIL A420 3/4••= 1, 0•' 1 1/T' x 1 VT' STEEL TUBES AT 3'-0" O.C. MAX. PAINTED. SPACE E�UALLV 11/Y' x 1 VT' STEEL TUBES - PAINTE� 3/4" x 3/4" STEEL BARS - PAINTE� — 11/2" �IA. STEEL HAN�RAIL- PAINTE� ¢ � � HANDRAIL BRACKET AT � � EACH VERTICAL POST - STAIRTREA�S. REFERTO � INTERIOR DRAW INGS STEELCHANNELSTRINGER,PAINTED CONCRETE FlLLED METAL PAN STAIRS STAIR DETAIL 314•• = P �•' CARMEL MEDICAL ARTS PAVILION 12174 N. Meridian Street Carmel, Indiana 46032 ��, �. McC�O �� ��sraeF. �+5-� - *� AR10700109 + �� svv[or Wcwr� n � q IT��� Y_...�^ �` v- CJ CERTIFIED BY ISSUANCE INDEX DATE: 3'-0"OC MA% OS.PY.POYO � / PROJECT PHASE: l� I�Ir CONSTRUCTION DOCUMENTS A420 Project Number 2019.00780 STAIR TYPICAL DETAILS