SPECIAL INSPECTIONS BASIC SERVICES - CONCRETE CONSTRUCTION
REFER TO IBC 2012 CHAPTER 17 TABLE 1705.3 AND ACI 318-17
REM TASK APPLICABLETO FREpUENCV REFERENCE
PROJECT (V/N)
REMFORCEMENT INSPECTREMFORCEMENT,INCLUDINGPRESTRESSINGTENDONS(WHERE V PERIODIC ACI3185ECTION535
APPLICABLE) AND VERIFV CORRECT PLACEMENT AND ].1 THROUGH
]]: IBC 1910.4
REINFORQNGBARWELDING VERIFVWELDABILITYOFBARSOTHERTHANASTMA]06 y PERIODIC AWSDI.4,ACI318
SECTION 3.5 2
ANCHORS AND EMBEDDED INSPECT ALL ANCHORS AND EMBEDDED ITEMS FOR PROPER SIZE, TVPE, y PERIO�IC ACI 318 SECTIONS
ITEMS CAST IN CONCRETE QUANTITV, LOCATION, POSITION, PROJECTION AN� EMBEDMENT 3.8.6, 8.13, 212.8; IBC
1908.5. 1909.1
ANCHORS POST-INSTALLE� IN INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS y PERIODIC ACI 318 SECTIONS
HARDENED CONCRETE 3.8.6, 8.1.3, 212.8;
IBC \1909.1
CONCRETE MIX VERIFV USE OF REQUIRED CONCRETE MIX AT EACH APPLICATION V PERIODIC ACI 318 CHAPTER 4,
SECTIONS 52
THROUGH5.4',BC
1904 2, 1910 2. 1910 3
CONCRETE TESTWG VERIFV THAT CONCRETE SAMPLING AND TESTMG IS PERFORME� IN V CONTINUOUS ASTM Ci]2, ASTM
ACCORDANCE W ITH CONSTRUCTION DOCUMENTS C31, ACI 318 5 6, 5 8;
IBC 1910.10
CONCRETEPLACEMENT INSPECTFORPROPERPLACEMENTTECHNIQUES V CONTINUOUS ACI318SECTIONS
5.9, 5.10; IBC 1910 6,
19107,1910.8
SHOTCRETEPLACEMENT INSPECTFORPROPERAPPLICATIONTECHNIQUES N CONTINUOUS ACI318SECTIONS
5.9, 5.10; IBC 1910.6,
1910 ], 19W.8
CONCRETE CURING VERIFY MAIMENANCE OF PROPER WNCRETE TEMPERATURE AND CURWG V PERIODIC ACI 318 SECTIONS
TECHNIQUES 5.11 THROUGH 5.13',
IBC 1910 9
PRESTRESSED CONCRETE INSPECT FOR PROPER APPLICATION OF PRESTRESSING FORCES N CONTINUOUS ACI 318 SECTION 1820
PRESTRESSED CONCRETE INSPECT FOR PROPER GROUTING OF BONDED PRESTRESSING TENDONS N CONTINUOUS ACI 318 SECTION
18.18 4
ERECTION OF PRECAST VERIFY WELDING PROCEDURE SPECIFlCATIONSARE FOLLOWED N PERIODIC Aq CHAPTER 16
CONCRETE MEMBERS
ERECTIONOFPRECAST INSPECTALLCONNECTIONSOFTHEPRECASTELEMENTSTOTHE N PERIODIC AQCHAPTERI6
CONCRETE MEMBERS FOUNOATIONSFORCONFORMANCETOTHECONTRACTOOCUMENTS
ERECTION OF PRECAST INSPECT ALL CONNECTIONS OF THE PRECAST ELEMENTS TO THE N PERIODIC AQ CHAPTER 16
CONCRETE MEMBERS STRUCTURALFRAMINGFORCONFORMANCETOTHECONTRACT
DOCUMENTS
IN-SITU CONCRETE STRENGTH - VERIFY IN-PLACE CONCRETE STRENGTH PRIOR TO STRESSING TENDONS IN N PERIODIC ACI 318 SECTION 62
PRE-STRESSING POST-TENSIONEDCONCRETE
IN-SITU CONCRETE STRENGTH - VERIFV IN-PLACE CONCRETE STRENGTH PRIOR TO REMOVAL OF FORMS N PERIODIC ACI 318 SECTION 62
FORMSANDSHORES ANDSHORESFROMBEAMSAN�STRUCTURALSLA65
FORMWORK INSPECTFORMWORKFORSHAPE,LOCATIONANDDIMENSIONSOFTHE N PERIODIC ACI318SECTION6.1.1
CONCRETE MEMBER BEING FORMED
WATER STOPS VERIFY ALL WATER STOPS ARE PROPERLV INSTALLED AND ANCHORED INT V PERIODIC
POSITION PRIOR TO PLACEMENT OF CONCRETE
SPECIAL INSPECTIONS BASIC SERVICES - SOILS AND EARTHWORK
REFER TO IBC 2012 CHAPTER 17 TABLE 1705.6
ITEM TASK APPLICABLE70 FREQl1ENCV REFERENCE
PROJECT (YIN)
BEARINGSOILSFORSHALLOW VERIFVMATERIALSBELOWSHALLOWFOUNDATIONSAREADEQUATETO V PERIODIC
FOUNDATIONS ACMEVE THE DESIGN BEARING CAPAQTV
EXCAVATIONS VERIFV EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE � pERIODIC
REACHE� PROPER MATERIAL
RLL MATERIALS VERIFV CLASSIFlCATION AN� TESTING OF COMPACTED FILL MATERIAL515 Y PERIODIC
PERFORMED
RLLMATERIALPLACEMENT VERIFYl1SEOFPROPERMATERIALS,DENSITIESANDLIFTTHICKNESSES V CONTINUOUS
DURWG PLACEMENT AND COMPACTION OF COMPACTED FILL
SUBGRADE PREPARATION PRIOR TO PLACEMENT OF COMPACTE� FlLL, INSPECT SUBGRADE AND V PERIO�IC
VEPoFY THAT SITE HAS BEEN PREPARED PROPERLY
BACKFlLLATBELOW-GRADE VERIFVTHATBELOW-GRA�EWALLSWITHUNEVENBACKFlLLCONDITIONS V PERIO�IC
WALLS ARE NOT BACKFlLLED UNTIL FLOOR CONSTRUCTION AT TOPS OF WALLS
(OR OTHER PERMANENT BRACING WHERE APPLICABLE) IS COMPLETE OR
TEMPORARV BRACING IS PROVIOED
SPECIAL INSPECTION SERVICES SCHEDULE - COLD-FORMED STEEL DECK
REFER TO IBC 2012, CHAPTER 17
ITEM TASK APPLICABLETO FREpUENCY REFERENCE
PROJECT (V/N)
PRIOR TO OEGK PLACEMENT:
MATERIALCOMPLIANCE VERIFVCOMPLIANCEOFDECKANDALLDECKACCESSORIESWITH Y PERIODIC AWSDI3,SDIC,
CONSTRUCTION OOCUMENTS, WCW OING PROFlLES, MATERIAL NC AND R
PROPERTIES AND BASE METAL THICKNESS (AS APPLICABLE)
MATERIALACCEPTANCE DOCUMENTACCEPTANCEORREJECTIONOFDECKANDDECKACCESSORIES Y PERIODIC
AFTERDEGKPLACEMENT:
STEEL DECK INSTALLATION VERIFV PROPER INSTALLATION OF STEEL DECK AND ACCESSORIES V PERIODIC SDI Q NC AND R
(AS APPLICABLE)
MATERIALMILL VERIFVDECKMATERIALSAREREPRESENTE�BVAPPROPRIATEMILL V PERIODIC
CERTIFICATIONS CERTIFICATIONS
INSTALLATIONACCEPTANCE DOCUMENTACCEPTANCEORREJECTIONOFDECKANDDECK Y PERIODIC
ACCESSORIES INSTALLATION
PRIOR TO WELDING:
WELDINGPROCEDURE VERIFYWEL�INGPROCEDURESPEQFICATION(WPS)AVAILABLE Y PERIODIC AWSDI3,S�IC,
SPECIFICATION(S) NC AND R
(AS APPLICABLE)
WELDINGCONSUMABLES VERIFVMANUFACTURER'SCERTIFlCATIONSAREAVAILABLEFORWELDING V PERIODIC AWSDI3,SDIC,
MANUFACTURER CONSUMABLES NCANDR
CERTIFICATIONS (AS APPLICABLE)
WELDINGMATERIAL VERIFYWEL�INGMATERIALTVPE/GRADE Y PERIODIC AWSDI3,SDIC,
TVPEIGRADE NC AND R
(AS APPLICABLE)
WELDINGEQUIPMENT VERIFVWELDINGEQUIPMENTMGOODWORKINGORDER V PERIODIC AWSDI3,SDIC,
NC AND R
(AS APPLICABLE)
DURING WELDING:
�UALIFlEDWELDERS VERIFVUSEOFQUALIREDWELDERS V PERIODIC AWSD13
WELDINGCONSUMABLES VERIFVPROPERCONTROLANDHANDLINGOFWELDWGCONSUMABLES Y PERIODIC AWSD13
ENVIRONMENTALCONDITIONS �OCUMENTENVIRONMENTALCONDITIONS(WINDSPEED,MOISTURE, V PERIODIC AWSD1.3
TEMPERATURE)AREACCEPTABLE
WPSFOLLOWED VERIFVPROPERWPSISFOLLOWEDDURWGWELDING V PERIODIC AWSD1.3
AFTER WELDING:
FlELDWELDING INSPECTRELDWELDSFORPROPERSIZELOCATION,PATTERN,AND Y PERIODIC AWSDI3,SDIC.
SPACING FOR ALL W EL�S NC AND R
(AS APPLICABLE)
VISUALACCEPTANCE VERIFVWELDSMEETVISUALACCEPTANCECRITERIA V PERIODIC AWSDI.3,SDIC,
NC AND R
(AS APPLICABLE)
REPAIRACTIVITIES VERIFVDEFICIENTWELDSAREPROPERLVREPAIRED V PERIODIC AWSDI3,SDIC,
NC AND R
(AS APPLICABLE)
WELDACCEPTANCE �OCUMENTACCEPTANCEORREJECTIONOFWEL�S V PERIODIC AWSDI.3,SDIC,
NC AND R
(AS APPLICABLE)
PRIOR TO MECHANICAL
FASTENING:
MANUFACTURER VERIFV MANUFACTURER INSTALLATION INSTRUCTIONS AREAVAILABLE FOR V PERIODIC SDI Q NC AND R
INSTRUCTIONS MECHANICALFASTENERS (ASAPPLICABLE)
PROPER TOOLS VERIFV PROPER TOOLS AVAILABLE FOR FASTENER INSTALLATION V PERIODIC SDI Q NC AN� R
(AS APPLICABLE)
FASTENER STORAGE VERIFV PROPER STORAGE FOR MECHANICAL FASTENERS V PERIODIC SDI Q NC ANO R
(AS APPLICABLE)
DURING MECHANICAL
FNSTENING:
POSITIONING VERIFVFASTENERSAREPOSITIONEOASREQUIRED(WCWDINGPROPER Y PERIODIC S�IqNCANOR
PATTERN, SPACING, ETC-) (AS APPLICABLE)
INSTALLATION VERIFV FASTENERS ARE INSTALLED IN ACCORDANCE W ITH V PERIODIC 5�I G NC AN� R
MANUFACTURER'S INSTRUCTIONS (AS APPLICABLE)
AFTER MECHANIGAL
FASTENING:
SUPPORT FASTENERS VERIFV PROPER PATTERN, SPACING, TYPE AND INSTALLATION V PERIODIC S�I 0. NC AN� R
(AS APPLICABLE)
PERIMETER FASTENERS VERIFV PROPER PATTERN, SPACING, TYPE AN� INSTALLATION V PERIODIC 501 q NC ANO R
(AS APPLICABLE)
SIDELAP FASTENERS VERIFY PROPER SPACING, TVPE AND WSTALLATION Y PERIODIC 501 C, NC ANO R
(AS APPLICABLE)
REPAIR ACTIVITIES VERIFV DEFICIENT FASTENERS ARE PROPERLY REPAIRE� V PERIODIC 501 q NC ANO R
(AS APPLICABLE)
FASTENERACCEPTANCE DOCUMENTACCEPTANCEORREJECTIONOFFASTENERS Y PERIODIC SOIC,NCANOR
(AS APPLICABLE)
NOTES:
1. "PERIODIC" REQUIRES OBSERVATION ON A RANOOM BASIS. OPERATIONS NEED NOT BE OELAVED PENDING THESE INSPECTIONS.
2"CONTINUOUS" REQUIRES TASKS TO BE CONTINUOUSLV PERFORME� FOR EACH OPERATION, CONNECTION OR MEMBER AS APPLICABLE.
3. INSPECT FOR CONFORMANCE WITH CONSTRUCTION oOCUMENTS.INSTALLATION DRAW WGS, SHOP DRAW WGS, DESIGN DOCUMENTS, MANUFACTURER'S
INSTRUCTIONS, AND APPLICABLE REFERENCED STANDARDS.
CCORNERSTONE
■�
�
� �M�R CR\
■ STRUCTUREPOINT
nc
�
CARMEL MEDICAL
ARTS PAVILION
12174 N. Meridian Street
Carmel, Indiana 46032
m. " N0. \
q�11200647
9� STFTE Of /
� ��
�
OS122/20
CERTIFIED BY
ISSUANCE INDEX
DATE:
�$.22.2020
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
SPECIAL INSPECTION
REQUIREMENTS
S004
Project Number 2019.00780