Loading...
HomeMy WebLinkAboutS004- SPECIAL INSPECTION REQUIREMENTSi a N RELEA5E0 FOR CONSTRIICTI�N Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel '�v�:���\i 1�.rvalMa=� . DATE: O$�Z4�ZO SPECIAL INSPECTIONS BASIC SERVICES - CONCRETE CONSTRUCTION REFER TO IBC 2012 CHAPTER 17 TABLE 1705.3 AND ACI 318-17 REM TASK APPLICABLETO FREpUENCV REFERENCE PROJECT (V/N) REMFORCEMENT INSPECTREMFORCEMENT,INCLUDINGPRESTRESSINGTENDONS(WHERE V PERIODIC ACI3185ECTION535 APPLICABLE) AND VERIFV CORRECT PLACEMENT AND ].1 THROUGH ]]: IBC 1910.4 REINFORQNGBARWELDING VERIFVWELDABILITYOFBARSOTHERTHANASTMA]06 y PERIODIC AWSDI.4,ACI318 SECTION 3.5 2 ANCHORS AND EMBEDDED INSPECT ALL ANCHORS AND EMBEDDED ITEMS FOR PROPER SIZE, TVPE, y PERIO�IC ACI 318 SECTIONS ITEMS CAST IN CONCRETE QUANTITV, LOCATION, POSITION, PROJECTION AN� EMBEDMENT 3.8.6, 8.13, 212.8; IBC 1908.5. 1909.1 ANCHORS POST-INSTALLE� IN INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS y PERIODIC ACI 318 SECTIONS HARDENED CONCRETE 3.8.6, 8.1.3, 212.8; IBC \1909.1 CONCRETE MIX VERIFV USE OF REQUIRED CONCRETE MIX AT EACH APPLICATION V PERIODIC ACI 318 CHAPTER 4, SECTIONS 52 THROUGH5.4',BC 1904 2, 1910 2. 1910 3 CONCRETE TESTWG VERIFV THAT CONCRETE SAMPLING AND TESTMG IS PERFORME� IN V CONTINUOUS ASTM Ci]2, ASTM ACCORDANCE W ITH CONSTRUCTION DOCUMENTS C31, ACI 318 5 6, 5 8; IBC 1910.10 CONCRETEPLACEMENT INSPECTFORPROPERPLACEMENTTECHNIQUES V CONTINUOUS ACI318SECTIONS 5.9, 5.10; IBC 1910 6, 19107,1910.8 SHOTCRETEPLACEMENT INSPECTFORPROPERAPPLICATIONTECHNIQUES N CONTINUOUS ACI318SECTIONS 5.9, 5.10; IBC 1910.6, 1910 ], 19W.8 CONCRETE CURING VERIFY MAIMENANCE OF PROPER WNCRETE TEMPERATURE AND CURWG V PERIODIC ACI 318 SECTIONS TECHNIQUES 5.11 THROUGH 5.13', IBC 1910 9 PRESTRESSED CONCRETE INSPECT FOR PROPER APPLICATION OF PRESTRESSING FORCES N CONTINUOUS ACI 318 SECTION 1820 PRESTRESSED CONCRETE INSPECT FOR PROPER GROUTING OF BONDED PRESTRESSING TENDONS N CONTINUOUS ACI 318 SECTION 18.18 4 ERECTION OF PRECAST VERIFY WELDING PROCEDURE SPECIFlCATIONSARE FOLLOWED N PERIODIC Aq CHAPTER 16 CONCRETE MEMBERS ERECTIONOFPRECAST INSPECTALLCONNECTIONSOFTHEPRECASTELEMENTSTOTHE N PERIODIC AQCHAPTERI6 CONCRETE MEMBERS FOUNOATIONSFORCONFORMANCETOTHECONTRACTOOCUMENTS ERECTION OF PRECAST INSPECT ALL CONNECTIONS OF THE PRECAST ELEMENTS TO THE N PERIODIC AQ CHAPTER 16 CONCRETE MEMBERS STRUCTURALFRAMINGFORCONFORMANCETOTHECONTRACT DOCUMENTS IN-SITU CONCRETE STRENGTH - VERIFY IN-PLACE CONCRETE STRENGTH PRIOR TO STRESSING TENDONS IN N PERIODIC ACI 318 SECTION 62 PRE-STRESSING POST-TENSIONEDCONCRETE IN-SITU CONCRETE STRENGTH - VERIFV IN-PLACE CONCRETE STRENGTH PRIOR TO REMOVAL OF FORMS N PERIODIC ACI 318 SECTION 62 FORMSANDSHORES ANDSHORESFROMBEAMSAN�STRUCTURALSLA65 FORMWORK INSPECTFORMWORKFORSHAPE,LOCATIONANDDIMENSIONSOFTHE N PERIODIC ACI318SECTION6.1.1 CONCRETE MEMBER BEING FORMED WATER STOPS VERIFY ALL WATER STOPS ARE PROPERLV INSTALLED AND ANCHORED INT V PERIODIC POSITION PRIOR TO PLACEMENT OF CONCRETE SPECIAL INSPECTIONS BASIC SERVICES - SOILS AND EARTHWORK REFER TO IBC 2012 CHAPTER 17 TABLE 1705.6 ITEM TASK APPLICABLE70 FREQl1ENCV REFERENCE PROJECT (YIN) BEARINGSOILSFORSHALLOW VERIFVMATERIALSBELOWSHALLOWFOUNDATIONSAREADEQUATETO V PERIODIC FOUNDATIONS ACMEVE THE DESIGN BEARING CAPAQTV EXCAVATIONS VERIFV EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE � pERIODIC REACHE� PROPER MATERIAL RLL MATERIALS VERIFV CLASSIFlCATION AN� TESTING OF COMPACTED FILL MATERIAL515 Y PERIODIC PERFORMED RLLMATERIALPLACEMENT VERIFYl1SEOFPROPERMATERIALS,DENSITIESANDLIFTTHICKNESSES V CONTINUOUS DURWG PLACEMENT AND COMPACTION OF COMPACTED FILL SUBGRADE PREPARATION PRIOR TO PLACEMENT OF COMPACTE� FlLL, INSPECT SUBGRADE AND V PERIO�IC VEPoFY THAT SITE HAS BEEN PREPARED PROPERLY BACKFlLLATBELOW-GRADE VERIFVTHATBELOW-GRA�EWALLSWITHUNEVENBACKFlLLCONDITIONS V PERIO�IC WALLS ARE NOT BACKFlLLED UNTIL FLOOR CONSTRUCTION AT TOPS OF WALLS (OR OTHER PERMANENT BRACING WHERE APPLICABLE) IS COMPLETE OR TEMPORARV BRACING IS PROVIOED SPECIAL INSPECTION SERVICES SCHEDULE - COLD-FORMED STEEL DECK REFER TO IBC 2012, CHAPTER 17 ITEM TASK APPLICABLETO FREpUENCY REFERENCE PROJECT (V/N) PRIOR TO OEGK PLACEMENT: MATERIALCOMPLIANCE VERIFVCOMPLIANCEOFDECKANDALLDECKACCESSORIESWITH Y PERIODIC AWSDI3,SDIC, CONSTRUCTION OOCUMENTS, WCW OING PROFlLES, MATERIAL NC AND R PROPERTIES AND BASE METAL THICKNESS (AS APPLICABLE) MATERIALACCEPTANCE DOCUMENTACCEPTANCEORREJECTIONOFDECKANDDECKACCESSORIES Y PERIODIC AFTERDEGKPLACEMENT: STEEL DECK INSTALLATION VERIFV PROPER INSTALLATION OF STEEL DECK AND ACCESSORIES V PERIODIC SDI Q NC AND R (AS APPLICABLE) MATERIALMILL VERIFVDECKMATERIALSAREREPRESENTE�BVAPPROPRIATEMILL V PERIODIC CERTIFICATIONS CERTIFICATIONS INSTALLATIONACCEPTANCE DOCUMENTACCEPTANCEORREJECTIONOFDECKANDDECK Y PERIODIC ACCESSORIES INSTALLATION PRIOR TO WELDING: WELDINGPROCEDURE VERIFYWEL�INGPROCEDURESPEQFICATION(WPS)AVAILABLE Y PERIODIC AWSDI3,S�IC, SPECIFICATION(S) NC AND R (AS APPLICABLE) WELDINGCONSUMABLES VERIFVMANUFACTURER'SCERTIFlCATIONSAREAVAILABLEFORWELDING V PERIODIC AWSDI3,SDIC, MANUFACTURER CONSUMABLES NCANDR CERTIFICATIONS (AS APPLICABLE) WELDINGMATERIAL VERIFYWEL�INGMATERIALTVPE/GRADE Y PERIODIC AWSDI3,SDIC, TVPEIGRADE NC AND R (AS APPLICABLE) WELDINGEQUIPMENT VERIFVWELDINGEQUIPMENTMGOODWORKINGORDER V PERIODIC AWSDI3,SDIC, NC AND R (AS APPLICABLE) DURING WELDING: �UALIFlEDWELDERS VERIFVUSEOFQUALIREDWELDERS V PERIODIC AWSD13 WELDINGCONSUMABLES VERIFVPROPERCONTROLANDHANDLINGOFWELDWGCONSUMABLES Y PERIODIC AWSD13 ENVIRONMENTALCONDITIONS �OCUMENTENVIRONMENTALCONDITIONS(WINDSPEED,MOISTURE, V PERIODIC AWSD1.3 TEMPERATURE)AREACCEPTABLE WPSFOLLOWED VERIFVPROPERWPSISFOLLOWEDDURWGWELDING V PERIODIC AWSD1.3 AFTER WELDING: FlELDWELDING INSPECTRELDWELDSFORPROPERSIZELOCATION,PATTERN,AND Y PERIODIC AWSDI3,SDIC. SPACING FOR ALL W EL�S NC AND R (AS APPLICABLE) VISUALACCEPTANCE VERIFVWELDSMEETVISUALACCEPTANCECRITERIA V PERIODIC AWSDI.3,SDIC, NC AND R (AS APPLICABLE) REPAIRACTIVITIES VERIFVDEFICIENTWELDSAREPROPERLVREPAIRED V PERIODIC AWSDI3,SDIC, NC AND R (AS APPLICABLE) WELDACCEPTANCE �OCUMENTACCEPTANCEORREJECTIONOFWEL�S V PERIODIC AWSDI.3,SDIC, NC AND R (AS APPLICABLE) PRIOR TO MECHANICAL FASTENING: MANUFACTURER VERIFV MANUFACTURER INSTALLATION INSTRUCTIONS AREAVAILABLE FOR V PERIODIC SDI Q NC AND R INSTRUCTIONS MECHANICALFASTENERS (ASAPPLICABLE) PROPER TOOLS VERIFV PROPER TOOLS AVAILABLE FOR FASTENER INSTALLATION V PERIODIC SDI Q NC AN� R (AS APPLICABLE) FASTENER STORAGE VERIFV PROPER STORAGE FOR MECHANICAL FASTENERS V PERIODIC SDI Q NC ANO R (AS APPLICABLE) DURING MECHANICAL FNSTENING: POSITIONING VERIFVFASTENERSAREPOSITIONEOASREQUIRED(WCWDINGPROPER Y PERIODIC S�IqNCANOR PATTERN, SPACING, ETC-) (AS APPLICABLE) INSTALLATION VERIFV FASTENERS ARE INSTALLED IN ACCORDANCE W ITH V PERIODIC 5�I G NC AN� R MANUFACTURER'S INSTRUCTIONS (AS APPLICABLE) AFTER MECHANIGAL FASTENING: SUPPORT FASTENERS VERIFV PROPER PATTERN, SPACING, TYPE AND INSTALLATION V PERIODIC S�I 0. NC AN� R (AS APPLICABLE) PERIMETER FASTENERS VERIFV PROPER PATTERN, SPACING, TYPE AN� INSTALLATION V PERIODIC 501 q NC ANO R (AS APPLICABLE) SIDELAP FASTENERS VERIFY PROPER SPACING, TVPE AND WSTALLATION Y PERIODIC 501 C, NC ANO R (AS APPLICABLE) REPAIR ACTIVITIES VERIFV DEFICIENT FASTENERS ARE PROPERLY REPAIRE� V PERIODIC 501 q NC ANO R (AS APPLICABLE) FASTENERACCEPTANCE DOCUMENTACCEPTANCEORREJECTIONOFFASTENERS Y PERIODIC SOIC,NCANOR (AS APPLICABLE) NOTES: 1. "PERIODIC" REQUIRES OBSERVATION ON A RANOOM BASIS. OPERATIONS NEED NOT BE OELAVED PENDING THESE INSPECTIONS. 2"CONTINUOUS" REQUIRES TASKS TO BE CONTINUOUSLV PERFORME� FOR EACH OPERATION, CONNECTION OR MEMBER AS APPLICABLE. 3. INSPECT FOR CONFORMANCE WITH CONSTRUCTION oOCUMENTS.INSTALLATION DRAW WGS, SHOP DRAW WGS, DESIGN DOCUMENTS, MANUFACTURER'S INSTRUCTIONS, AND APPLICABLE REFERENCED STANDARDS. CCORNERSTONE ■� � � �M�R CR\ ■ STRUCTUREPOINT nc � CARMEL MEDICAL ARTS PAVILION 12174 N. Meridian Street Carmel, Indiana 46032 m. " N0. \ q�11200647 9� STFTE Of / � �� � OS122/20 CERTIFIED BY ISSUANCE INDEX DATE: �$.22.2020 PROJECT PHASE: CONSTRUCTION DOCUMENTS SPECIAL INSPECTION REQUIREMENTS S004 Project Number 2019.00780