SPECIAL INSPECTION SERVICES SCHEDULE - STEEL CONSTRUCTION
REFER TO IBC 2012 CHAPTER 17 AND AISC 360-10
ITEM TASK APPLICABLETO PERFORM OR REFERENCE
PROJECT�Y/N) OBSERVE
WELDEO MEMBERS
PRIOR TO WELOING:
WELDINGPROCEDURE VERIFYCONTRACTORMAINTAINSWELDWGPROCEDURESPEqFlCATIONS V PERFORM AISC360TABLEN5.4-1
SPECIFICATIONS READILVAVAILABLEFORALLWELDERSFORALLTVPESOFWELDS
PERFORMED ON THE PROJECT
WELD MATERIAL VERIFV MATERIAL CERTIFICATIONS ARE AVAILABLE FOR ALL CONSUMABLE Y PERFORM AISC 360 TABLE NS4-1
CERTIFICATIONS WELDINGMATERIALS
WELDMATERIAL VERIFYALLWEL�MATERIALSAREPROPERLYMARKEDWITHVALID V OBSERVE AISC360TABLEN5.4-0
IDENTIFICATION TVPE/GRADE IOENTIFICATION
WELDERIDENTIFICATION VERIFVFABRICATORIERECTORASAPPLICABLEMAINTAWSRECORDSOF V OBSERVE AISC360TABLEN5.4-1
SVSTEM WHOWELDEDEVERVJOINT
FIT-UPOFGROOVEWELDS INSPECTFORPROPERFIT-UPWCW�INGJOINTPREPARQTION, Y OBSERVE AISC360TABLEN54-1
DIMENSIONS, CLEANLME55, TACKING, AND BACKING (WHERE BACKMG IS
APPLICABLE)
ACCE55 HOLES INSPECT FOR CONFIGURATION ANO FINISH OF ACCE55 HOLES Y OBSERVE AISC 360 TABLE N5.4-0
FIT-UPOFFlLLETWELOS INSPECTFORPROPERFIT-UPMCLU�INGDIMENSIONS,CLEANLINESS,ANO V OBSERVE AISC360TABLEN5.4-1
TACKING
DURING WELDING:
pUALIFlEDWELDERS VERIFVUSEOFQUALIREDWEL�ERS Y OBSERVE AISC360TABLEN5.4-2
WELDINGCONSl1MABLES INSPECTFORPROPERPACKAGING,STORAGEANDPROTECTION Y OBSERVE AISC360TABLEN5.4-2
TACKWELDS VERIFVNOWELDINGOCCURSOVERCRACKEDTACKWELDS V OBSERVE AISC360TABLEN5.4-2
FIELOCONOITIONS VERIFVWINDSPEEDWITHWLIMITSANDPROPER Y OBSERVE AISC3fi0TABLEN5.4-2
PROTECTION/PREPARATION FOR PRECIPITATION AND TEMPERATURE
WELDINGPROCEDURE VERIFVWELDINGPROCEDURESPECIRCATIONSAREFOLLOWED Y OBSERVE AISC3fi0TABLEN5.4-2
SPECIFICATION (NOTE 2 - SEE
AISC 360)
WELOINGTECHNIpUES VERIFVEACHPASSMEETSPRORLELIMITATIONSANDQUALITV Y OBSERVE AISC3fi0TABLEN5.4-2
REQUIREMENTS, INTERPASS AND RNAL 0.EANING
COMPOSITE BEAM HEADE� INSPECT FOR PROPER PLACEMENTAND INSTALLATION OF STEEL HEADED Y OBSERVE
STl1DANCHORS STl1DANCHORS
AFTER WELOING:
WEL�SCLEANED VERIFVPROPERQEANINGOFCOMPLETEDWEL�S V OBSERVE AISC3fi0TABLEN5.4-3
SIZE, LENGTH. LOCATION, AND INSPECT W EL�S TO CONRRM PROPER SIZE, LENGTH, LOCATION AND AISC 360 TABLE N5.4-3
VISUALACCEPTANCECRITERIA VISUALACCEPTANCECRITERIA(CRACKPROHIBITION,WELO/BASEMETAL
(NOTE3-SEEAISC360) Fl1SION,CRATERCROSSSECTION,WELDPROFlLES,WELDSIZE,UNDERCUT
POROSITV) AS FOLLOWS:
VISUALLV INSPECTAND VERIFV ULTRASONIC TESTIN6IS PERFORMED FOR V PERFORM
100 % OF ALL CJP W ELDS
VISUALLVINSPECTI�O%OFALLCJPWELDS V PERFORM
VISUALLV INSPECT 1�0% OF WELDS IN LATERAL LOAD RESISTING MOMENT Y PERFORM
FRAMES ANO BRACED FRAMES
VISUALLVINSPECT2�%OFALLFlLLETWEL�SNOTINLATERALLOAD Y PERFORM
RESISTING MOMENT FRAMES AND BRACE� FRAMES
ARCSTRIKES VISUALLVINSPECTTOCONRRMNOARCSTRIKES V PERFORM AISC360TABLEN54-3
"k"-AREAWELDING vISUALLVINSPECTALLoOUeLERPLATES.CONTINUITVPLATESAN� N PERFORM AISC360TABLEN54-3
STIFFENER PLATES W HERE W EL�ING OCCURS W ITH W THE k-AREA OF THE
STEEL SECTION TO CONRRM NO CRACKS IN THE MEMBER WEB
BACKWGANDWELOTABS vISUALLVINSPECTTOCONFlRMPROPERREMOVALOFALLBACKING N PERFORM AISC360TABLEN54-3
REMOVE� REMOVED. VERIFV ALL WELD TABS REMOVEO QF REpUIRED)
REPAIRS vERIFVAPPROVEOREPAIRSOFNON-CONFORMINGITEMS(WHEN V PERFORM AISC360TABLEN54-3
REQUIRE�J ARE PROPERLV COMPLETED
DOWMENTATION DOWMENTACCEPTANCEORREJECTIONOFWEL�EDCONNECTIONS V PERFORM AISC360TABLEN54-3
BOLTED MEMBERS
PRIOR TO BOLTING:
MATERIAL CERTIFICATIONS VERIFV MANUFACTURER'S CERTIFICATIONS ARE AVAILABLE FOR FASTENER V PERFORM AISC 360 TABLE NS 6-1
MATERIALS
FASTENER MARKINGS VERIFV FASTENERS ARE MARKED PER ASTM STANDARDS V OBSERVE AISC 360 TABLE N&6-1
FASTENER SELECTIONS VERIFY CORRECT GRADE, TYPE, AND SUFFICIENT LENGTH FOR THREADS V OBSERVE AISC 360 TABLE N5.6-1
EXCLUDED FROM THE SHEAR PLANE (ONLY WHERE SPEQFlCALLV
INDICATED)
BOLTING PROCEDURE VERIFV PROPER BOLTING PROCEDURE FOR THE JOMT V OBSERVE AISC 360 TABLE NS$4
CONNECTINGELEMENTS VERIFVCONNECTINGELEMENTS,INCWDINGFAVWGSURFACESANDHOLE V OBSERVE AISC360TABLEN56-1
PREPARATION QF SPECIFlED) MEET APPLICABLE RE�UIREMENTS
PRE-INSTALLATION VERIFY PRE-INSTALLATION VERIFICATION TESTING BV INSTALLATION V OBSERVE AISC 360 TABLE N564
VERIFlCATION PERSONNEL IS OBSERVE� AND DOCUMEMED FOR FASTENER ASSEMBLIES
AND METHO05 USED
PROPER STORAGE VERIFV PROPER STORAGE OF BOLTS, NUTS, WASHERS AND OTHER V OBSERVE AISC 360 TABLE NS$-1
FASTENERCOMPONENTS
OURINA BOLTMCa:
PROPER POSITIONING VERIFV ALL FASTENING ELEMENTS ARE PROPERLV POSITIONED IN THE Y OBSERVE AISC 360 TABLE N5.6-2
JOINT PRIOR TO TIGHTENING
BOLT TIGHTENING VERIFV COMPONENT NOT TURNE� BV THE WRENCH IS PREVENTED FROM V OBSERVE AISC 360 TABLE N5$-2
ROTATING DURING TIGHTENWG
PRETENSIONEDBOLTSSNUG VERIFVALLBOLTSATACONNECTIONTOBEPRETENSIONEDAREFIRST V OBSERVE AISC360TABLEN56-2
TIGHTENED BROUGHTINTOSNUGTIGHTCONDITIONPRIORTOSTARTOFPRE-
TENSIONWG
PRETENSIONED BOLTS VERIFV FASTENERS ARE PRETENSIONEO IN ACCOROANCE WITH RCSC Y OBSERVE AISC 360 TABLE N56-2
TIGHTENING SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH-STRENGTH BOLTS
AFTER BOLTING:
DOCUMENTATION DOCUMENTACCEPTANCEORREJECTIONOFBOLTEDCONNECTIONS Y PERFORM AISC360TABLENSfi3
STEEL FRAMING (GENERAL)
COWMN BASES INSPECT INSTALLATION OF ALL BASE PLATES FOR PROPER ANCHORAGE Y PERFORM
(INCLUDING W ELDED PLATE WASHERS W HERE INDICATED) AND GROUTING
BENEATH BASE PLATE
COLUMNSPLICES INSPECTALLCOLUMNSPLICESTOCONFIRMTHATGAPSBETWEEN N PERFORM
BEARWG ELEMENTS DO NOT EXCEED ili6-INCH
BEAM,GIRDERANDCOLUMN INSPECTFORCONFORMANCEWITHREQUIREDSIZE,SPACINGAND Y PERPoRM
MEMBERS CONNECTION REQUIREMENTS
ROOF AND FLOOR DECK/SLAB INSPECT SUPPORT MATERIALS FOR PROPER SRE, POSITIONING AND Y PERFORM
EDGESUPPORTS CONNECTIONS
BRACED FRAMESAND INSPECT INSTALLATION OFALL MEMBERSAN� CONNECTIONS IN BRACED Y PERFORM
MOMENT FRAMES FRAMES AND MOMENT FRAMES FOR PROPER SRE, POSITIONING AND
CONNECTIONS
COMPOSITE STEEL FRAMMG INSPECT COMPOSITE STEEL FRAMING PRIOR TO PLACEMENT OF
CONCRETE AS FOLLOWS�.
VERIFY PROPER PLACEMENT AN� WSTALLATION OF STEEL DECK V PERFORM AISC 360 TABLE Nfi.i
INSPECTDIAMETER.LENGTH,�UANTITYANDPOSITIONWGOFSTEEL V PERFORM AISC360TABLEN6.1
HEADEDSTUDANCHORS
RING TEST 20°/ OF HEADED STUD ANCHORS WITH A 3 LB HAMMER Y PERPoRM
BENDTEST�UESTIONABLEHEADE�STUDANCHORST015DEGREES V PERFORM
DOCUMENT ACCEPTANCE OR REJECTION OF COMPOSITE STEEL FRAMING V PERFORM
ELEMENTS
STEELGRATING INSPECTSTEELGRATINGASFOLLOWS'.
VEPoFV PROPER SIZE, TVPE AND FlNISH N PERFORM
VEPoFYPROPERATTACHMENTSTOSUPPORTINGSTRUCTURE(S) N PERFORM
NOTES:
1. SEE CONTRACT DOCUMENTS FOR WELDING REQUIREMENTS. SEE AISC 360 FOR ADDITIONAL INFORMATION.
2. SEE AISC 360 FOR SPEQFIC REQUIRED ELEMENTS OF WELO PROCEDURE SPEQFICATION.
3. SEEAISC360FORSPECIFICREQUIREDVISl1ALACCEPTANCECRITERIA.
4. "OBSERVE" REQUIRES OBSERVATION ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAVED PENDING THESE INSPECTIONS.
5. 'PERFORM" REQUIRES TASKS TO BE PERFORMED FOR EACH OPERATION, JOINT OR MEMBER AS APPLICABLE.
THE OW NER OR OW NER'S AGENT SHALL EMPLOV INDEPENDENT AGENCVQES) OR
INDNIDUAL(5) TO PROVIDE SPEQAL INSPECTION FOR ITEMS AS INDICATED ON THE
DRAWINGS.
SPEQAL INSPECTION IS A MAN�ATORY REOUIREMENT FOR VERIFYING CONFORMANCE
OF THE INDICATED CONSTRIICTION. SPECIAL INSPECTION IS REQUIRED IN ADDITION TO
ALL MATERIAL TESTS AND INSPECTIONS IDENTIFlED ELSEWHERE IN THE CONSTRUCTION
DOCUMENTS.
THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON, W HO SHALL �EMONSTRATE
COMPETENCE, TO THE SATISFACTION OF THE BUILDIN6 OFRCIAL AND THE STRUCTURAL
ENGMEER. FOR INSPECTION OF EACH PARTICULAR TVPE OF CONSTRUCTION OR
OPERATION RE�UIRING SPECIAL INSPECTION.
"PERIOOIC" SPEQAL INSPECTION IS DEFINED AS "THE PART-TIME OR INTERMITTENT
OBSERVATION OF WORK REQUIRING SPEqAL INSPECTION BV AN APPROVED SPECIAL
INSPECTOR WHO IS PRESENT IN THE AREA W HERE THE WORK HAS BEEN OR IS BEWG
PERFORMED ANO AT THE COMPLETION OF THE WORK"
"CONTINUOUS" SPECIAL INSPECTION IS DEFlNED AS "THE FULL-TIME OBSERVATION OF
WORK REQUIRING SPEQAL INSPECTION BV AN APPROVED SPECIAL INSPECTOR WHO IS
PRESENT IN THE AREA WHERE THE WORK IS BEWG PERFORMED"
SUBMIT TO THE STRUCTURAL ENGMEER FOR REVIEW A MINIMUM OF 14 �AVS PRIOR TO
COMMENCEMENT OF CONSTRUCTION OF ELEMENTS REQUIRING SPECIAL INSPECTION
THE FOLLOWING:
L NAME(S), ADDRESS(ES), TELEPHONE NUMBER(S), EMAIL AD�RESS(ES), AND
STATEMENT(S) OF QUALIFlCATIONS OF ALL SPECIAL INSPECTOR(S) TO BE
ENGAGED ON THE PROJECT.
2. ALISTINGOFALLITEMSTORECENESPECIALINSPECTION,OESIGNATION
W HETHER INSPECTIONS W ILL BE CONTINUOUS OR PERIODIC AND THE NAME OF
THE IN�IVIDUAL THAT WILL BE PERFORMING INSPECTION FOR EACH ITEM.
THE CONTRACTOR SHALL COOR�INATE W ITH THE SPECIAL INSPECTOR SUFFICIENTLV IN
A�VANCE OF WORK RWUIRING SPECIAL INSPECTION AND SHALL PROVIDE ACCESS TO
THE SITE AND TO THE CONSTRUCTION DOCUMENTS (CURRENT DRAW INGS AND
SPECIRCATIONS) FOR THE SPECIAL INSPECTOR TO CARRV OUT THE RE�UIRED
OPERATIONS.
THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK RE�UIRING SPECIAL INSPECTION
FOR CONFORMANCE TO THE CONSTRUCTION DOCUMENTS. ALL NON-CONFORMWG
WORK SHALL BE BROUGHT TO THE IMMEOIATE ATTENTION OF THE CONTRACTOR FOR
CORRECTION, THEN, IF UNCORRECTED, TO THE IMMEDIATE ATTENTION OF THE OW NER
OR OW NER'S AGENT AND STRUCTURAL ENGINEER.
THE SPECIAL INSPECTOR SHALL SUBMIT PERIODIC PROGRESS REPORTS TO THE OWNER
OR OWNER'S AGENT, CONTRACTOR AND STRUCTURAL ENGWEER IDENTIFYING ALL
SPECIAL INSPECTION OPERATIONS PERFORMED. REPORTS SHALL BE SUBMITTED NO
MORE THAN ] DAVS FOLLOWING EACH SPEqAL INSPECTION OPERATION. REPORTS
SHALL IDENTIFV THE ITEM(S) INSPECTED AND AN INDICATION OF WHETHER THE
INSPECTED ITEMS W ERE IN CONFORMANCE W ITH THE CONSTRUCTION DOCUMENTS.
AT THE COMPLETION OF ALL WORK REQUIRING SPECIAL INSPECTION, THE SPECIAL
INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT TO THE O W NER OR OW NER'S AGENT
CONTRACTOR AND STRUCTIIRAL ENGINEER STATING W HETHER THE W ORK REQUIRING
SPECIAL INSPECTION WAS, TO THE BEST OF THE SPECIAL INSPECTOR'S KNOWLEDGE, IN
CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS.
FAILURE TO PERFORM SPECIAL INSPECTION FOR THE INDICATED CONSTRUCTION OR
FAIW RE TO CORRECT NON-CONFORMING WORK SHALL CONSTITUTE A BASIS FOR
REJECTION OF THE W ORK AND REMOVAL AND REPLACEMENT BV THE GENERAL
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER, INCLUDING. BUT NOT LIMITED
TO:
1. THE COST OF REMOVAL AND REPLACEMENT OF ALL WORK FOR WHICH SPECIAL
INSPECTION WAS REQUIRED BUT NOT PERFORMED, INCLUDING THE COST OF
TESTING AND SPECIAL INSPECTION FOR THE REPLACEMENT WORK.
2. THE COST OF ALL RELATED WORK MADE NECESSARV BV THE REMOVAL AND
REPL4CEMENT OF THE UNINSPECTED WORK PER ITEM 1 ABOVE.
3. THE COST FOR OESIGN PROFESSIONACS SERVICES RELATED TO ALL WORK FOR
W HICH SPECIAL INSPECTION WAS REpUIRED BUT NOT PERFORMED AND
SERVICES RELATED TO THE REPLACEMENT WORK.
PROVIDE SPECIAL INSPECTION FOR THE FOLLOW ING CONSTRUCTION:
SOILSANDEARTHWORK
CONCRETECONSTRUCTION
STEEL CONSTRUCTION
COLD-FORMEDSTEELDECK
SEE TABLES ON THE �RAWINGS FOR SPECIAL INSPECTION PROGRAM REQUIREMENTS.
CCORNERSTONE
■■
�
� �M�R CR\
■ STRUCTUREPOINT
nc
�
CARMEL MEDICAL
ARTS PAVILION
12174 N. Meridian Street
Carmel, Indiana 46032
� +r
m: No.
q�11200647
9� STFTE Of /
�OSI��
CERTIFIED BY
ISSUANCE INDEX
DATE:
0$.22.2020
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
SPECIAL INSPECTION
REQUIREMENTS
S005
Project Number 2019.00780