HomeMy WebLinkAboutS301- FOUNDATION SCHEDULES, SECTIONS, AND DETAILS�
Q
N
FF FL
15 10
20 15
25 15
30 25
40 25
REQUIRED SLAB
FLAT
MODERATELV FLAT
MODERATELV FLAT
FLAT
FLAT
VERV FLAT
SUPER FLAT
VERY FLAT
SUPER FLAT
SUPER FLAT
NOTES:
1. GENERAL CONTRACTOR SHALL REVIEW ALL FLOOR FlNISH REQUIREMENTS FOR THE
PROJECT AN� PROVIDE CONCRETE SLAB SURFACE FINISHES IN ACCORDANCE W ITH THE
REOUIREMENTS OFTHE SPEQRED FLOOR RNISH MATERIALS. WHERE TOLERANCES FOR
THE FLOOR FINISH MATERIALS DIFFER FROM THIS SCHE�l1LE. THE MORE STRINGENT
REpUIREMENTSSHALLAPPLV.
2. GENERALCONTRACTORSHALLCOORDINATEWITHTHEFINISHFLOORINGSUPPLIERTO
PROVIDE ALL N ECESSARV REPAIR, GRINDING, ANO / OR LEVELING OF THE CONCRETE
"""" ' ^^4 FlNISHES PRIOR TO INSTALLATION OF RNISH
RELEA5E0 FOR CONSTRIICTI�N 'STTo THe Przo�ecT.
Su6jec� �o compliance with all regula�ions
of S�a�e antl Local Codes
City of Carmel
`v�:����i 1�.rvalMT�
DATE: O$�Z4�ZO
SLAB ON GRADE SCHEDULE
WALL FOOTING SCHEDULE
MARK SIZE (W x D) REINF REMARKS
NOTES:
1. PROVIDE 6" COMPACTED DRAINAGE FlLL SUB-BASE, UNO.
COLUMN FOOTING SCHEDULE
WALL FOOTING SCHEDULE
MARK I PIER SIZE I PI RE NFRT I PIER TIES I TYPE
TYPES:
�
TYPE A
��
TYPE B
REMARKS
�� �
TYPE C
NOTES:
1. PROVIDE (3) TIES @ 3" OC AT TOP OF EACH PIER. TIE SIZE TO MATCH TVPICAL PIER TIES.
PROVIDE TIES AT SPACMG INDICATED IN SCHEDULE FOR REMAINDER OF PIER LENGTH.
PIER SCHEDULE
CONCRETE MIX SCHEDULE
28-DAY MAX CEMENT MAXIMUM
COMPRESSIVE MAXIMUM AIR CONTENT
CONCRETE USAGE STRENGTH REPLACEMENT W�CM RATIO (PERCENT) AGGREGATE NOTES
(PSI) (NOTE 3) SIZE (INCHES)
FOOTING$ELEVATORMATFOUNDATION 4p�0 20% 0.55 03 1.5
EXTERIOR RETG WALLS, STOOPS AND PADS 4,000 20% 045 6+/- 1 1
SLABS ON GRADE (B INCHES OR LESS) 4,000 20% 048 OJ 1 1.5 LBSICVD MICRPFlBER (NOTES 7, 8, 9)
SLABS ON METAL DECK 4,000 20% 048 03 1 4.0 LBSICVD MACRPFlBER (NOTES 7, 8, 9)
SLABS ON METAL DECK (EXTERIOR) 4,500 20% 0 48 6+/- 1 1 4.0 LBSICVD MACRPFleER (NOTES �, 8, 9)
NOTES:
1. SEE GENERAL NOTES AND SPEQFICATIONS FOR ADDITIONAL INFORMATION.
2 ALL CONCRETE IS NORMAL WEIGHTAND CEMENT IS ASTM C150 TVPE 1, UNO. �O NOT USE LIGHTWEIGHT CONCRETE UNLESS SPECIFICALLV INDICATED.
3. ACCEPTAeLE CEMENTREPLACEMENTMATERIAL WHEREPERMITTED SHALLBEFLVASH ASTMC618TVPECORF UNO.
4. TARGETSWMPSHALLBEDETERMMEDBVTHECONTRACTORASNEEDEDFORPROPERPLACEMENT.
5. WHERENOTEO,BLENDEDAGGREGATEWITHZONE2COARSENESSPERACI30215MANDATORV.
6. COORDINATELOCATIONSOFALLPOLISHEDCONCRETESLABS(WHENUSED)ANDREVIEWTHECONCRETEMIXREQUIREMENTSWITHTHEPOLISHEDCONCRETEWNTRACTORPRIORTO
SUBMITTAL OF CONCRETE MIXES. IF THE POLISHED CONCRETE CONTRACTOR REOUESTS TO DEVIATE FROM THE REpUIREMENTS OF THIS SCHEDULE, CONTACT THE STRUCTURAL
ENGINEER TO REVIEW THE REpUESTS PRIOR TO SUBMISSION OF THE POLISHED CONCRETE MIX(ES).
7. PROVIDE ELEMENT 5(ES) A�MIXTURE PER MANUFACTURER'S INSTRUCTIONS AND RECOMMEN�ATIONS COORDINATE USAGE OF "ES PROTECT" WITH ARCHITECTURAL DRAWINGS FOR
SEALANT.
8. SEE GENERAL NOTES ON SW2 FOR ADDITIONAL INFORMATION REGARDING SLABS WITH MACRO RBER THAT WILL BE EXPOSED TO VIEW IN THE COMPLETED CONSTRUCTION.
9. FOLLOWADMIxTURESUPPLIERSRECOMMENDATIONSANDSPECIFICATI0N5.
CONCRETE MIX SCHEDULE
N.T.S.
SLAB ON GRADE
FLATNESS / LEVELNESS SCHEDULE
CLASSIFICATION FF FL
CONVENTIONAL 20 15
MODERATELVFLAT 25 20
FLAT 35 25
VERV RAT 45 35
SUPER FLAT 60 40
FLOORTYPE/LOCATION
EXPOSED WAREHOUSE, MANUFACTURINGAREAS, UNO
EXPOSED UTILITVIMECHANICALAREAS, UNO
FLOORS W ITH CARPET, VCT FINISH, UNO
FLOORS W ITH POLISHED CONCRETE FINISH
TILE UP TO 16" LONG DIMENSION, >=V4' GROUT JOINTS
TILE UP TO 16" LONG DIMENSION, 3/16" GROUT JOINTS
TILE UP TO 16" LONG DIMENSION, 1/8" GROUT JOINTS
TILE>i6" TO <36" LONG �IMENSION, �=1/4" GROUT JOINTS
TILE >i 6" TO <36" LONG �IMENSION, <1/4" GROUT JOINTS
TILE >36" LONG DIMENSION
�TNESS/LEVELNESS SCHEDULE
1/4"(+/-)SAWEDJOINT� �
rrrrrr � rrr �z
�
o a
w
w
N
SLAB ON GRADE PER
PLAN
CONTROL JOINT
NON-COATED REINFORCING BAR DEVELOPMENT AND SPLICE LENGTHS
f'c = 3000 PSI f'c = 4000 PSI f'c = 5000 PSI ALL CONCRETE STRENGTHS
BAR SIZE Ld Ldt Lt Ltl BAR SRE Ld Ldt Lt Lit BAR SIZE Ld Ldt Lt Lit BAR S2E Lb Lc Lcs
#3 17 23 23 29 #3 15 20 20 26 #3 13 1] 17 22 #3 9 12 12
U4 22 29 29 38 #4 19 25 25 33 #6 1] 23 23 29 f14 11 13 12
#5 28 3] 3� 48 #5 24 32 32 41 #5 22 29 29 38 #5 14 i6 15
U6 33 43 43 56 #6 29 38 38 50 #6 26 34 34 44 #6 1] 19 1]
p] 48 63 63 82 #] 42 55 55 ]1 #] 38 50 50 65 #] 20 22 20
M8 55 ]2 ]2 93 k8 48 63 63 82 #8 43 56 56 ]3 #B 22 25 23
�t9 62 81 81 105 #9 54 ]1 ]1 92 #9 48 63 63 82 N9 25 29 26
aio ss eo eo in aio so �a �a ioz ttio sa �i �i sz uio za az zs
#11 �6 99 99 129 p11 66 86 86 112 #11 59 ]] ]] 100 #11 31 35 31
NOTES:
1. db = NOMINAL BAR DIAMETER
Ltl = TENSIONOEVELOPMENTLENGTH
Ltlt= OEVELOPMEMLENGTHOFTOPBARSINTENSION TqBLEVAWESSHALLBEMULTIPLIED8V1.51FTHEFOLLOWING
Lt = TENSIONL4PSPLICELENGTH CRITERIAARENOTMET: MECHANICAL
Ltt = TENSION LAP SPLICE LENGTH OF TOP BARS COUPLER
Lb = COMPRESSION DEVELOPMEM LENGTH 3tlb � J� �
w
Lc = TIED COLUMN LAP SPLICE IN COMPRESSION Q FL Lq Ltlt I
Lcs = SPIRAL COLUMN LAP SPLICE IN COMPRESSION MIN N � a
2. REBARDEVELOPMENTISPLICELENGTHSAREBASED • • • f �= Lb I
ONACI318.REINFORCEMENTVIELDSTRENGTH,Fy=60KS1. � TOP � —� I
� BAR Q
_ p
I M I I I
3 "TOP BARS" — HOR ZONTAL BEAM. AT. OR SL4B RE NFORC NG W TH
� ^ r
MORE THAN 12" CAST BELOW. U 2tlb 2tlb N
4. ALLSPLICESSHALLBETENSIONSPLICES,UNO. �O MINMIN MECHANICAL
SPLICE STAGGER LAP DETAIL DEVELOPMENT LENGTH
S LARGER�IAMETERSPLICELENGTHSGOVERNATBARSIZE SLAB/WALL COLUMNBEAM
ranNsinoNs. TYPICAL REINFORCING BAR DEVELOPMENT / SPLICE DETAILS
6. FOR LIGHTWEIGHT CONCRETE, MULTIPLV TABLE VALUES BV 133, UNO.
CONCRETE REINFORCEMENT DEVELOPMENT AND LAP SPLICE TABLE
N.T.S.
SMOOTH DOWEL BAR PER APPLV CURING COMPOUND TO FACE
TABLE INSTALL AT MID-0EPTH OF SLAB AFTER REMOVAL OF EDGE
OF SLAB, UNO. FORM
SLAB ON GRADE COAT OR W RAP DOW EL TO
PERPLAN PREVENTBOND
z
rrr rr o d
w
�
CONSTRUCTION JOINT
DOWEL SIZE AND SPACING
SLABDEPTH(IN) �OWELBAR TOTALBAR BARSPACING
DIAMETER(IN) LENGTHQN) (CTR-CTR)(IN)
4 3/4 16 24
MARK I SIZE I REINFORCEMENT I VAPOR PROTECTION
�.Y•ieE�aE�i�.1CI.YLN'Ul r I[N:Z�DylAy:iikfan�.c�sn:ava:r.naa
. �r7�/_f:7:�
VAPOR PROTECTION
� PER SCHEDULE
SUB-BASE
VAPOR PROTECTION AND SUB-BASE DETAIL
SLAB-ON-GRADE SCHEDULE
1IT' E%P JT
MATERIAL
�
ROOF DRAIN,
SEE PLUMBING
DRAWINGS
COLUMNPER
PLAN
CONTROL JOINT, TVP
ISOLATION JOINT
� COWMN & FOOTING
TISY
PER PLAN
T/F�PER PLAN
FlLLWICONCRETE
- ISOLATION JOINT
FOOTING PER PLAN
TYPICAL SLAB ON GRADE JOINTS
ANCHORRODSPERCOLUMNSCHED
AND COLUMN BASE DETAIL
COLUMN ISOLATION JOINT AT ROOF DRAIN
CCORNERSTONE
■�
�
� �M�R CR\
■ STRUCTUREPOINT
�,�
■ o
CARMEL MEDICAL
ARTS PAVILION
12174 N. Meridian Street
Carmel, Indiana 46032
�(/ +�t-
m: No.
q�11200647
9� STFTE Of /
�OSI��
CERTIFIED BY
ISSUANCE INDEX
DATE:
05.22.2020
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
FOUNDATION
SCHEDULES,
SECTIONS, AND
DETAILS
S301
Project Number 2019.00780