Loading...
HomeMy WebLinkAbout42300009 - GR3 42 - Energy CertificateIndiana 2�2� Perfarman�e �ompliance Praperty 923 TEMPLETON DRIVE CARMEL, IN 4fi032 Madel: 98D3 TARPIN 5LB 6a3 9PL I Community: GRAMERCY 909aAVIN GRAMERCY 923 TEMPLET�N QRIUE-9803 TARPIN Performance-based compliance passes by 8.6°�6 Air Leakage Testing Area-weighted average fenestration SHGC Area-weighted a�erage fenestration Ll-Factor Annual Energy Cost Design Heating Cooling Water Heating Mechanical Ventilatian 5ubTotal - Used to determine �omplian�e Lights & Appliances wlout Ventilation �nsite generation Total Indiana 2020 Performance $940 $149 $324 $19 $1,433 $5a9 $� $1,942 Inspe�tion 5tatus Results are projected This report is based an a proposed design and does not confirm field enforcement of design elements. Requirements � � � � � � � � 11D5 11 D2.4.12 11 D2.5 11 D2.5 11D4.1 Lighting Equipment Efficiency f�landatory Checklist �'�andatory code requirements that are not checked by Ekotrope must be met. 11D3.6 Mechanical Ventilation Rate 1103.6.1 hlechanical Ventilation Efficacy a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� As aesigned $833 $142 $324 $10 $1,3�9 $509 $0 $1,818 Air sealing is 424 AGH at 50 Pa. It must not exceed 5.0� ACH at 5a Pa. Design ex�eeds requirements fvr Indiana 202� Perfvrman�e compliance hy 8.fi°Io. As a 3rd party extension of the code jurisdi�tion utilizing these reports, I certify that this energy code complian�e document has been created in accordan�e with the requirements of Chapter 4 of the adopted Intemational Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certiTy that the building design des�ribed herein is consistent with the building plans, specifications, and other �al�ulations submitted �tiith the permit application. If rating is Confirmed, I �ertiTy that the address referenced abo�e has been inspected.+tested and that the mandatory pro�isions of the IECC have 6een installed to meet or ex�eed the intent of the IECC or will be verified as such by another party. Name Organizatian ❑rganixatian TopBuild Home 5ervi�es, I Eric Bjerre 6uilder QAVIQ 1NEEKLEY HDMES Eric 8jerre TapBuild Home 5eruices. In� Signature: ��'�'G ���� ❑igitally sig��ed: 61�6!2D at 10:36 Af�9 Ekotrope RATER - Vers�on 3.2.3.247� Indiana 202� Perforinance compliance results calculated using Ekotrope RATER's energ}� and code compliance algorithm, including appropriate amendments. Ekotrope RATER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered 6y Ekotrope users. Ekotrope disclaims all lia6ility for the information shown on this report. 9�3 TEMPLET�N aRIVE Ceiling Attic, R-38 Abawe Grade Walls R-22 Foundation Walls N!A Framed Floor R-3� Slab R-�.� Perimeter, R-1 D.0 Under Ilnfiltration 1.37 ELAI 100 s.f. Shell Area Window U-Value: fl.34, SHGC: 0.31 Building Features Duct 5upply R-6.0, Return R-G.0 Duct Leakage ta Outside 3 CFM251 10� ft2 Tatal auct Leakage 4 CFM251 100 ft2 (Past-Canstructiony Heating Furnace • IVatural Gas • 93 AFUE Cooling Air Conditianer • Electri� • 13 SEER Water Heating Water Heater • Electric • 0.93 Energy Factor As a 3ro party ext�r7sion of tne code junsd�ci�on ut�lizir7g these reports, I cert�fy that ihis energy code can7pliar7ce documeryt has been created in accoraance �;rith the req�ire��erts of Chapter 4 of the adopted International Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certify that the building design described herein is consiste�t �;:ith :�e building plans. specifications, and other calculations submitted with the permit application. If rating is Confrmed: I certiTy that the address referenced above has been inspected.+tested and that the mandatory provisions of the IECC have been installed to meet or exceed the intent ofthe IEGC or vrill be verifed as such by : neth�r partV. Name� Eric Bjerre Si�nature: "�'�'� ���� Organization: TapBuild Hom�e Services. Inc. Digitally signed: 6f2fi120 at 1 D:36 AM o rope - Version 3.2.3.2470 Irdiara 2C2ii Certiicate cam��iance results calculated using Eko�rape 4.ATER's energy and code complia�c� �Inari:lim. including a���opriate ainerdme�ts E4::�tr:��e R=.TER is a RESNETHcc-edited HERS Rat rg Tool. =.1 resul°s are based on d.=.:._. �n � a: :�: EF:otrope �sers. -E:o�r��:e : a=1a -is all lial: :.: i� t a in-c ma:ic� a�o::n o� 1� a r=��c �. CARM E L, 1 N 4G�32 Builder: ❑AVID WEEKLEY H�MES Madel: 9803 TARPIN SLB BD3 9PL RR C4mmunity: GFtAIVIERCY This repart is based an a propased design and does nat confirm field enfar�ement �f design elements. Energy �ode Inspectian Checklist Property ❑rganixatian 923 TEMPLETON DRIVE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: 98D3 TARPIN 5LB 6a3 9PL I Community: GRAMERCY 6uilder QAVIQ 1NEEKLEY 909aAVIN GRAMERCY 923 HDMES TEMPLET�N QRIUE-9803 TARPIN �eneral Building Infvrmatian Canditioned Area �sq ft} Canditioned Valume (�ubic ft) Insulated Shell Area (sq ft� 1,888 19,816 5,fi17.5 Inspe�tion 5tatus Results are projected a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� The building energy model in Ekotrope reflects the building assemblies and energy features listed below. Sometimes energy features will �hange in the field frorn what has been modeled. The inspection pro�ess should identify any �hanges and ensure that the home cantinues to meet the applicable energy code. 51ab � Name: SLAB(676 s.f., 125.1 ft. exterior perirneter} R-0 perimeter insulation, R-1 D under slab insulatian. Framed Flvar � Name: FDA �2D s.f.) R-0 continuous insulation, R-30 cavity insulation Insulatian Grade: I � Name: FDG (51i s.f.} R-0 continuous insulation, R-30 cavity insulatian Insulation Grade: I Fvundatian Wall Nane Present Abvve �rade Wall � Name: AMB (2,8D9.5 s.f.} R-3 continuous insulati�n, R-19 cavity insulation Insulation Grade: I � Name: GAR (130.5 s.f.} R-0 continuous insulation, R-19 cavity insulatian Insulati�n Grade: I Energy �ode Inspectian Checklist Property ❑rganixatian 923 TEMPLETON DRIVE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: 98D3 TARPIN 5LB 6a3 9PL I Community: GRAMERCY 6uilder QAVIQ 1NEEKLEY 909aRVIN GRAMERCY 923 HDMES TEMPLET�N QRIUE-9803 TARPIN � Name: ATT �9 s.f.} R-0.5 continuous insulation, R-19 �avity insulation Insulation Grade: I Rim Jaist � Name: AMB (227.5 s.f.} R: 22.00 � Name: ATT � 15 s.f. } R: 19.00 Ceiling 1 Rvvf � Name: FLAT �1,213 s.f.y R-25 continuous insulation, R-13 cavity insulation Insulation Grade: I ❑paque Daar � Name: FR�NT (20 s.f.} U: 0.227 � Name: GAR (17.8 s.f.} U: 0.227 Glazing Inspe�tion 5tatus Results are projected � Name: FR�NT 1 ST (36 s.f.), U: 0.340, SHGC: 0.31, �rientatian: NDRTH_WEST � Name: FRONT 1 ST (3 s.f.}, U: 0.340, SHGC: 0.31, Orientatian: IV�RTH_WEST � Name: FR�NT 1 ST (18 s.f.), U: 0.340, SHGC: 0.31, �rientatian: NDRTH_WEST � Name: LEFT 15T (16 s.f.), U: 0.340, SHGC: 0.31, �rientation: N�RTH_EAST � Name: LEFT 15T (32 s.f.], U: �0.340, SHGC: 0.31, �rientation: N�RTH_EAST a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� 2 Energy �ode Inspectian Checklist Property ❑rganixatian 923 TEMPLETON DRIVE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: 98D3 TARPIN 5LB 6a3 9PL I Community: GRAMERCY 6uilder QAVIQ 1NEEKLEY 909aRVIN GRAMERCY 923 HDMES TEMPLET�N QRIUE-9803 TARPIN Inspe�tion 5tatus Results are projected � Name: LEFT 15T FRDR (ii.8 s.f.}, U: 0.340, SHGC: 0.31, Drientation: NDRTH_EAST � Name: LEFT 15T (2.7 s.f.}, lJ: 0.340, SHGC: D.31, ❑rientation: N�RTH_EAST � Name: BAGK 1 ST (36 s.f.), U: 0.340, SHGC: 0.31, �rientatian: SDUTH_EAST � Name: FR�NT 2ND �58.7 s.f.}, Ll: 0.340, SHGC: D.31, Drientatian: NDRTH_UVEST � Name: FR�NT 2ND �32 s.f.}, U: 0.340, SHGC: 0.31, ❑rientation: N�RTH_WEST � Name: LEFT 2ND �24 s.f.}, U: 0.340, SHGC: �.31, Drientation: N�RTH_EAST � � � � � � � � � Name: LEFT 2ND �54 s.f.}, U: 0.340, SHGC: �.31, ❑rientati�n: N�RTH_ERST Name: LEFT 2ND �� s.f.}, lJ: 0.34�, SHGC: 0.31, ❑rientati4n: N�RTH_EAST Name: LEFT 2ND �6 s.f.}, lJ: 0.34�, SHGC: D.31, ❑rientatian: N�RTH_EAST Name: BAGK 2ND �32 s.f.}, U: 0.34a, SHGC: 0.31, ❑rientation: S�IJTH_EAST Name: BAGK 2ND �8 s.f.y, lJ: 0.340, SHGC: D.31, ❑rientation: 50L1TH_EAST Name: BAGK 2ND �4 s.f.y, lJ: 0.340, SHGC: D.31, ❑rientation: 5DL1TH_EAST Name: RIGHT 2Na (4 s.f.), U: 0.340, SHGC: 0.31, �rientatian: SDUTH_WEST Name: RIGHT 2Na (4 s.f.J, U: 0.340, SHGC: 0.31, �rientation: SDUTH_WEST Name: RIGHT 2Na (16 s.f.), U: 0.340, SHGC: 0.31, arientatian: SDUTH_WEST 5kylight Nane Present Mechanical Ventilativn a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� 3 Energy �ode Inspectian Checklist Property ❑rganixatian 923 TEMPLETON DRIVE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: 98D3 TARPIN 5LB 6a3 9PL I Community: GRAMERCY 6uilder QAVIQ 1NEEKLEY 909aRVIN GRAMERCY 923 HDMES TEMPLET�N QRIUE-9803 TARPIN Inspe�tion 5tatus Results are projected � Mechanical ventilatian system rated for, and capable of, providing continuous �entilation. System shall include automatic timing controls. System type: Air Cycler, 6 hrsJday, 7D.42 lNatts Mechanical Equiprnent !�! � � Fuel-fired air distribution {1 }• Natural Gas • 10D°/o Heating Load [�7a 93 AFUE Air conditioner (2} • Electric • 1 DD°Io Caoling Load [�7a 13 SEER Water Heating �3} • Electric • 1 QO°Io Hot Water Load a� 0.93 Energy Factor Air Leakage Cvntrvl � Test Status: 6lower-door tested House is air-sealed as to achieve 1,399 CFM50 �4.24 AGH50] ar less at final blower-doar test. Infiltration Requirements for IECC in Climate Zane 5 2a09 IECC Infiltration limit for the design hame is 7 ACHS�. 2�12 IECC Infiltration limit fQr the design home is 3 ACHS�. 2a15 IECC Infiltratian limit for the design hame is 3 ACHS�. 2a18 IECC Infiltration limit for the design hame is 3 ACHS�. Duct Leakage Duct 5ystem 1 NOT entirely within �onditioned spa�e, testing required Leakage to Outside spe�ified as: 3 CFM251 1 DD f#2 Total Leakage spe�ified as: 4 CFM251 1D� ft2 �Post-Constru�ti�n} a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� 4 Energy �ode Inspectian Checklist Property ❑rganixatian 923 TEMPLETON DRIVE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: 98D3 TARPIN 5LB 6a3 9PL I Community: GRAMERCY 6uilder QAVIQ 1NEEKLEY 909aAVIN GRAMERCY 923 HDMES TEMPLET�N QRIUE-9803 TARPIN Duct Leakage Cvde Requirements fvr IECC 20fl9 IECC: Inspe�tion 5tatus Results are projected Postconstruction Leakage Test: auct Leakage to Dutdoors �= 8 CFM251 100 sq ft CFR. Rough in Test with AHU: Tatal auct Leakage �= 6 CFM251 100 sq ft CFA. Rough in Test without AHU: Total Duct Leakage �= 4 CFM251 1 a0 sq ft CFA. 2a12 IECC and 2015 IECC Prescripti�e Path: PQstconstruction Leakage Test: Tatal au�t Leaka�e �= 4 CFM25 ! 100 sq ft CFA. Rough in Test with AHU: Total auct Leakage �= 4 CFM251 100 sq ft CFA. Raugh in Test without AHU: Total Duct Leakage �= 3 CFM25 1 100 sq ft CFA. 2015 Performance Path �Cost Campliance}: a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� Leakage testing is required UNLESS all ducts and air handlers are lo�ated entirely within the thermal envelope. There is no passlfail threshold for duct leakage on the performance path. Praject Nates ORG ID: 48 ACC#: 909DAVIN BUILDER NAME: DAVID WEEKLEY HOMES PR�]ECT ID: 59945 SUBDIVISI�N: GRAMERCY PLAN ID: 857137 PLAN NAME: 923 TEMPLET�N DRIVE-9803 TARPIN SLB BD3 9PL RR-CC REVISI�N DATE: 05J25�2020 PRQGRAM: EFL�P�3Y�100��CH5:N� CREATED QN: 05�25J2020 5