Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S 100
HBHB9' - 11"25' - 8"8' - 2" 8' - 2" 10' - 6" 10' - 6" 6' - 6"7' - 3" 18' - 5" 16' - 4" 21' - 8"3' - 10" 60' - 3"6' - 1 1/2"1' - 8" 4' - 10 1/2"20' - 4" 5 1/2" 1' - 8"7' - 9 1/2" 10' - 10 1/2" 2' - 4"25' - 8"25' - 5"3' - 10" 56' - 5"60' - 3"2' - 6 1/2"16' - 3" 6' - 10 1/2" 10"20' - 0" 10"10"24' - 0"10"20' - 10"35' - 7"8' - 9"17" 2' - 1"14' - 1"3' - 0"63' - 9"The measurements, dimensions, and otherspecifications shown on this document areguidelines for construction use only. The actualspecifications of the finished structure mayvary. This document may not be relied on as arepresentation of what the completed structurewill look like. Scale:Rev:Date:Lot:Block:Sect:Proj. No.:Job No.:© Weekley Homes L.P. .rvtDavid Weekley HomesMG/YJ/JB 6/21/2019 420042300009GRAMERCY SF HD 31'923 TEMPLETON DRIVECARMEL, INSOUTH 9803-C FS-1 TARPIN INDIANAPOLIS20191/8"=1'-0"FIRST FLOOR 08/12/20 Adam Schriner