Loading...
HomeMy WebLinkAboutE602 - ELECTRICAL SCHEDULESProject Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE:7/15/2020 3:07:23 PME602 ELECTRICAL SCHEDULES 2019.00780 7.14.2020 CONSTRUCTION DOCUMENTS CARMEL MEDICAL ARTS PAVILION 12174 N. Meridian Street Carmel, Indiana 46032 Remarks: X-Ray 3670 VA 52.70% 1934 VA Total Est. Demand Current: 149 A Receptacle 87920 VA 55.69% 48960 VA Total Conn. Current: 262 A Lighting 216 VA 100.00% 216 VA Total Est. Demand: 53629 VA HVAC 250 VA 100.00% 250 VA Total Conn. Load: 94445 VA Elevator 2400 VA 95.00% 2280 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Load Sumamry: Total Load: 22.9 kVA 40.1 kVA 31.5 kVA 89 2.1 90 87 3.4 88 85 1L2 (FEED THRU) 20 A 3 2.7 86 83 Rehab 1206 Data Rack 20 A 1 1 0.5 1 20 A Shared Physician Office 1145 Receptacles 84 81 Office 1212 Receptacles 20 A 1 0.7 0.7 1 20 A Shared Physician Office 1145 Receptacles 82 79 Staff Break 1211 Garbage Disposal 20 A 1 0.5 0.4 1 20 A Meds 1144 Receptacles 80 77 Staff Break 1211 Receptacles 20 A 1 0.4 0.8 1 20 A Meds 1144 Refrigerator 78 75 Staff Break 1211 Refrigerator 20 A 1 0.8 0.9 1 20 A 1136, 1145 1141 Receptacles 76 73 Laundry 1208 Washer 20 A 1 1 0.9 1 20 A Staff Work Pod D 1142 Receptacles 74 71 1.5 0.9 1 20 A Staff Work Pod D 1142 Receptacles 72 69 Laundry 1208 Dryer 30 A 2 1.5 0.9 1 20 A Doctor Dict 1143 Receptacles 70 67 Rehab 1206 Tredmill 20 A 1 1 0.9 1 20 A Doctor Dict 1138 Receptacles 68 65 Rehab 1206 Bike 20 A 1 1 0.9 1 20 A Staff Work Pod C 1137 Receptacles 66 63 Rehab 1206 Bike 20 A 1 1 0.9 1 20 A Staff Work Pod C 1137 Receptacles 64 61 Rehab 1206 Bike 20 A 1 1 0.4 1 20 A Lab 1129 Receptacles 62 59 Rehab 1206 Receptacles 20 A 1 0.4 0.5 1 20 A Lab 1129 Counter Receptacles 60 57 Rehab 1206 Refrigerator 20 A 1 0.8 0.9 1 20 A DME 1127 Receptacles 58 55 Rehab 1206 Refrigerator 20 A 1 0.8 1 1 20 A IT / Data 1117 Receptacles 56 53 Physician Work 1207 Receptacles 20 A 1 0.7 1.2 1 20 A IT / Data 1117 Rack 54 51 Rehab 1206 Mobile Heating Unit Receptacle 20 A 1 1.5 1.1 1 20 A Exam 1133, Exam 1134 Receptacles 52 49 Rehab 1206 Table Receptacles 20 A 1 0.4 1.1 1 20 A Exam 1131, Exam 1132 Receptacles 50 47 Rehab 1206 Table Receptacles 20 A 1 0.4 1.1 1 20 A Exam 1125, Exam 1135 Receptacles 48 45 Rehab 1206 Table Receptacles 20 A 1 0.4 1.1 1 20 A Exam 1123, Exam 1124 Receptacles 46 43 Treatment 1205 Receptacles 20 A 1 0.5 1.1 1 20 A Exam 1121. Exam 1122 Receptacles 44 41 Treatment 1204 Receptacles 20 A 1 0.5 1.3 1 20 A Staff RR 1116, Corridor Receptacles 42 39 Reception 1203 Receptacles 20 A 1 0.7 0.9 1 20 A Staff Work 1114 Receptacles 40 37 Waiting 1201 Receptacles 20 A 1 0.7 0.9 1 20 A Staff Work Pod B 1119 Receptacles 38 35 Vestibule 1200 Auto Doors 20 A 1 10 0.9 1 20 A Staff Work Pod B 1119 Receptacles 36 33 Spare 20 A 1 0 0.9 1 20 A Doctor Dict 1120 Receptacles 34 31 Spare 20 A 1 0 0.9 1 20 A Doctor Dict 1112 Receptacles 32 29 Spare 20 A 1 0 0.9 1 20 A Staff Work Pod A 1111 Receptacles 30 27 Spare 20 A 1 0 0.9 1 20 A Staff Work Pod A 1111 Receptacles 28 25 Spare 20 A 1 0 0.2 1 20 A X-Ray 1113 Receptacle 26 23 Spare 20 A 1 0 0.7 1 20 A X-Ray 1113 Receptacle 24 21 Elevator B Cab Lights and Control 20 A 1 1.2 1.1 22 19 Elevator A Cab Lights and Control 20 A 1 1.2 1.1 2 20 A X-Ray 1113 Main Breaker 20 17 Elevator 1B Hoistway Lights and Receptacle 20 A 1 0.5 1.1 1 20 A Exam 1109, Exam 1110 Receptacles 18 15 Elevator 1A Hoistway Lights and Receptacle 20 A 1 0.5 1.1 1 20 A Exam 1107,Exam 1108 Receptacles 16 13 CP-1 20 A 1 0.3 0.9 1 20 A Exam 1106, Scale 1103 Receptacles 14 11 Lobby and Mechanical Receptacles 20 A 1 0.5 1.2 1 20 A Reception 1101 Copier 12 9 Corridor and Janitor Receptacles 20 A 1 0.5 0.5 1 20 A Reception 1101 Scale 1140 Receptacles 10 7 Front Automatic Doors 20 A 1 1 0.4 1 20 A Reception 1101 Receptacles 8 5 Electrical Water Cooler Receptacle (GFI) 20 A 1 0.2 0.4 1 20 A Reception 1101 Receptacles 6 3 Telecom DEMARC Receptacle 20 A 1 0.2 15 1 20 A Waiting 1100 Auto Doors 4 1 Fire Alarm Control Panel 20 A 1 0.5 1.3 1 20 A Waiting 1100 Receptacles 2 Circuit Number Circuit Description Trip Poles A B C Poles Trip Circuit Description Circuit Number PROVIDE WITH FEED THRU LUGS General Panel Comments: Enclosure Type: Type 1 Ground: Yes Main Rating: 225A Mounting: Surface Wire: 4 Main Type: MCB Supplied From: T-1L1 Phase: 3 A.I.C. Rating: Location: Voltage: 120/208 Wye Branch: Normal Branch Panel:1L1 Remarks: Total Est. Demand Current: 23 A Total Conn. Current: 23 A Total Est. Demand: 8160 VA X-Ray 700 VA 100.00% 700 VA Total Conn. Load: 8160 VA Receptacle 7460 VA 100.00% 7460 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Load Sumamry: Total Load: 2.7 kVA 3.4 kVA 2.1 kVA 41 PROVISION -- -- 0 0 -- -- PROVISION 42 39 PROVISION -- -- 0 0 -- -- PROVISION 40 37 PROVISION -- -- 0 0 -- -- PROVISION 38 35 PROVISION -- -- 0 0 -- -- PROVISION 36 33 PROVISION -- -- 0 0 -- -- PROVISION 34 31 PROVISION -- -- 0 0 -- -- PROVISION 32 29 PROVISION -- -- 0 0 -- -- PROVISION 30 27 PROVISION -- -- 0 0 -- -- PROVISION 28 25 PROVISION -- -- 0 0 -- -- PROVISION 26 23 PROVISION -- -- 0 0 -- -- PROVISION 24 21 Shared Manager Office 1158 Receptacles 20 A 1 0.5 0 1 20 A Spare 22 19 Staff Break 1156 Counter Receptacle 20 A 1 0.2 0 1 20 A Spare 20 17 Staff Break 1156 Refrigerator 20 A 1 0.8 0 1 20 A Spare 18 15 Staff Break 1156 Receptacles 20 A 1 0.7 0 1 20 A Spare 16 13 Portable X-Ray 1153 20 A 1 0.7 0 1 20 A Spare 14 11 1152, 1153 1157 Receptacles 20 A 1 0.7 0 1 20 A Spare 12 9 Staff Work 1152 Receptacles 20 A 1 1.1 0 1 20 A Spare 10 7 DIrector Office 1151 Receptacles 20 A 1 0.7 0 1 20 A Spare 8 5 Exam 1150 Receptacles 20 A 1 0.5 0 1 20 A Spare 6 3 Exam 1148, Exam 1149 Receptacles 20 A 1 1.1 0 1 20 A Spare 4 1 Exam 1146, Exam 1147 Receptacles 20 A 1 1.1 0 1 20 A Spare 2 Circuit Number Circuit Description Trip Poles A B C Poles Trip Circuit Description Circuit Number General Panel Comments: Enclosure Type: Type 1 Ground: Yes Main Rating: Mounting: Surface Wire: 4 Main Type: Supplied From: 1L1 Phase: 3 A.I.C. Rating: Location: Voltage: 120/208 Wye Branch: Normal Branch Panel:1L2 REVISION SCHEDULE NO. DESCRIPTION DATE 09/17/20