HomeMy WebLinkAboutG101MGCODE LEGEND
EXIT
SEMI RECESSED FIRE EXTINGUISHER CABINET W/ FIRE
EXTINGUISHER. VERIFY LOCATIONS AND QUANTITIES W/
APPLICABLE CODES, OWNER AND FIRE MARSHAL.
FEC
1 HR FIRE RATED PARTITION
SMOKE PARTITION
NOTES:
A. WHERE FIRE-RESISTANCE-RATED OR SMOKE-RESISTANCE-RATED WALLS
EXTEND ABOVE A CEILING, SUCH WALLS SHALL BE PERMANENTLY AND
APPROPRIATELY IDENTIFIED IN ACCORDANCE WITH THE REQUIREMENTS
SET FORTH IN THE BUILDING CODE - SECTION 703.3.
EGRESS ROUTE
RATED
CONSTRUCTION
Interior 1-Hour Rated Walls:UL #U-419 or U-465
APPLICABLE
BUILDING CODES
2014 Indiana Building Code; comprised of:
-2012 International Building Code
-675 IAC 13-2.6
2014 Indiana Fire Code; comprised of:
-2012 International Fire Code
-675 IAC 22-2.5
2012 Indiana Plumbing Code; comprised of:
-2006 International Plumbing Code
-675 IAC 16-1.4
2009 Indiana Electrical Code; comprised of:
-2008 NFPA 70
-675 IAC 17-1.8
2014 Indiana Mechanical Code; comprised of:
-2012 International Mechanical Code
-675 IAC 18-1.6
ALLOWABLE HEIGHT AND AREA
OCCUPANCY
CLASSIFICATION
B
CONSTRUCTION TYPE
Type IIB
SPRINKLER SYSTEM Equipped throughout with an automatic sprinkler system in
accordance with 903.3.1.1
LIFE SAFETY / BUILDING CODE SUMMARY
TRAVEL DISTANCE
RESTRICTIONS
• Dead-end Corridor Limit:50 ft
• Common Path of Travel: 100 ft
• Exit Access Travel Distance: 200 ft to exit access or exit
3 story; 55 ft
23,000 sf
3 story; 48'-6" ft
43,822 sf
ACTUAL HEIGHT AND
BUILDING AREA
TABULAR VALUES:
sprinkler: 1 story; 20 ftHEIGHT INCREASE:
sprinkler: 200% of 23,000 = 46,000 sf
frontage: 75% of 23,000 = 17,250 sf
AREA INCREASE:
height: 4 story; 75 ft
area: 86,250 sf (per floor); 172,500 sf (building)
TOTALS:
BUILDING USE
This facility will be used for professional offices.
FIRE RESISTANCE
RATING REQ'TS FOR
BUILDING
ELEMENTS
Structural Frame 0 HR
Bearing Walls
Exterior 0 HR
Interior 0 HR
Non Bearing Walls
Exterior 0 HR
Interior 0 HR
Floor Construction 0 HR
Roof Construction 0 HR
• Elevator shaft enclosure - 1 hour fire barrier (3002.1; 713.4)
• Elevator Equipment Room - 1 hour fire barrier (including ceiling)
(3006.4)
• Stairs - 1 hour fire barrier (1009.3.1.2)
• Ductwork chase: A shaft enclosure is required for penetrations by
ducts protected in accordance with Section 713.4 (see also
717.6.3)
• 714.4.2 Nonfire-resistance-rated assemblies. Penetrations of
nonfire-resistance-rated floor or floor/ceiling assemblies or the
ceiling membrane of a nonfire-resistance-rated roof/ceiling
assembly shall meet the requirements of Section 713 or shall
comply with Section 714.4.2.1 or 714.4.2.2
• 714.4.2.2 Penetrating items: Penetrating items that connect not
more than two stories are permitted, provided that the annular
space is filled with an approved material to resist the free passage
of flame and the products of combustion.
REQ'D SEPARATIONS
PLUMBING FIXTURE
CALCULATIONS
1st Floor -OPTUM - AHN
Tenant (Use Group B)
90 occupants (see above)
WC/Urinal - 90 occ * 1/25 = 3.6 fixtures; 6 provided plus 2 Public
Lav - 90 occ * 1/40 = 2.25; 2 provided; 6 provided plus 2 Public
CODE STRATEGY
The following strategy is being used to approach the life safety code
concerns for this building:
The entire building will be designed as a B Occupancy building of Type
IIB (noncombustible) construction.
OCCUPANT LOAD B Occupancy = 1:100
TOTAL OCCUPANTS
B Occupancy Area: 8,998 sf / 100 = 90 OCCUPANTS
8,998 sfACTUAL AREA OF
PROJECT
1 1.2 2 3 4 5 6 7 8 98.8
A
B
C
D
F
G
H
J
E
F.3
5.5
4.5
8.5
G.1
H.5
7.1
D.2
YY
XX
0.5 2.9 4.4 5.4 6.9
161' - 6 5/8"97' - 10 3/4"LOBBY
101
VESTIBULE
100
MECH/
SPRINKLER
105
WAITING
1100
STAIR
ST1-1
PUBLIC
RESTROOM
103
PUBLIC
RESTROOM
104
CORRIDOR
102
SHARED
MANAGER
OFFICE
1158
STAFF
BREAK/
CONFERENCE
1156
STAFF
RESTROOM
1154
PORTABLE
X-RAY
1153
PATIENT
RESTROOM
1139
CORRIDOR1157SOILED
HOLDING
1155
BIO-HAZ
1159
STAFF WORK
1152
DIRECTOR
OFFICE
1151
EXAM
1150
EXAM
1149
EXAM
1148
EXAM
1147
EXAM
1146
SHARED
PHYSICAN
OFFICE
1145
FUTURE
TENANT
110
CORRIDOR
1141
MEDS
1144
PATIENT
RESTROOM
1128
LAB
1129CLEAN
SUPPLY
1136
STAFF WORK
POD C
1137DOCTOR
DICT.
1143
DOCTOR
DICT.
1138STAFF WORK
POD D
1142
SCALE
1140
CORRIDOR
1130
RECEPTION
1101
EXAM
1131
EXAM
1132
EXAM
1133
EXAM
1134
EXAM
1135 DME
1127
IT/DATA
1117
EXAM
1125
EXAM
1124
EXAM
1123
EXAM
1122
EXAM
1121
CORRIDOR
1118
PATIENT
RESTROOM
1102
STAFF WORK
POD A
1111
DOCTOR
DICT.
1112
DOCTOR
DICT.
1120
STAFF WORK
POD B
1119 STAFF WORK
1114
PATIENT
RESTROOM
1115
STAFF
RESTROOM
1116
X-RAY
1113
EXAM
1110
EXAM
1109
EXAM
1108
EXAM
1107
EXAM
1106
CORRIDOR
1104
103'-7" 134'-2"110'-6"
FEC
FECELEC
108
CORRIDOR
107
STAIR
ST2-1
JANITOR
109
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:7/16/2020 2:27:29 PMG101
FIRST FLOOR LIFE
SAFETY PLAN -
TENANT 1
2019.01176
07/14/2020
CONSTRUCTION DOCUMENTS
CARMEL MEDICAL ARTS
PAVILION - FIRST FLOOR
TENANT BUILD-OUTS
12174 N. Meridian Street
Carmel, Indiana 46032
N
1/8" = 1'-0"G101
1 FIRST FLOOR LIFE SAFETY PLAN
REVISION SCHEDULE
NO. DESCRIPTION DATE
09/17/20