Loading...
HomeMy WebLinkAboutG101MGCODE LEGEND EXIT SEMI RECESSED FIRE EXTINGUISHER CABINET W/ FIRE EXTINGUISHER. VERIFY LOCATIONS AND QUANTITIES W/ APPLICABLE CODES, OWNER AND FIRE MARSHAL. FEC 1 HR FIRE RATED PARTITION SMOKE PARTITION NOTES: A. WHERE FIRE-RESISTANCE-RATED OR SMOKE-RESISTANCE-RATED WALLS EXTEND ABOVE A CEILING, SUCH WALLS SHALL BE PERMANENTLY AND APPROPRIATELY IDENTIFIED IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH IN THE BUILDING CODE - SECTION 703.3. EGRESS ROUTE RATED CONSTRUCTION Interior 1-Hour Rated Walls:UL #U-419 or U-465 APPLICABLE BUILDING CODES 2014 Indiana Building Code; comprised of: -2012 International Building Code -675 IAC 13-2.6 2014 Indiana Fire Code; comprised of: -2012 International Fire Code -675 IAC 22-2.5 2012 Indiana Plumbing Code; comprised of: -2006 International Plumbing Code -675 IAC 16-1.4 2009 Indiana Electrical Code; comprised of: -2008 NFPA 70 -675 IAC 17-1.8 2014 Indiana Mechanical Code; comprised of: -2012 International Mechanical Code -675 IAC 18-1.6 ALLOWABLE HEIGHT AND AREA OCCUPANCY CLASSIFICATION B CONSTRUCTION TYPE Type IIB SPRINKLER SYSTEM Equipped throughout with an automatic sprinkler system in accordance with 903.3.1.1 LIFE SAFETY / BUILDING CODE SUMMARY TRAVEL DISTANCE RESTRICTIONS • Dead-end Corridor Limit:50 ft • Common Path of Travel: 100 ft • Exit Access Travel Distance: 200 ft to exit access or exit 3 story; 55 ft 23,000 sf 3 story; 48'-6" ft 43,822 sf ACTUAL HEIGHT AND BUILDING AREA TABULAR VALUES: sprinkler: 1 story; 20 ftHEIGHT INCREASE: sprinkler: 200% of 23,000 = 46,000 sf frontage: 75% of 23,000 = 17,250 sf AREA INCREASE: height: 4 story; 75 ft area: 86,250 sf (per floor); 172,500 sf (building) TOTALS: BUILDING USE This facility will be used for professional offices. FIRE RESISTANCE RATING REQ'TS FOR BUILDING ELEMENTS Structural Frame 0 HR Bearing Walls Exterior 0 HR Interior 0 HR Non Bearing Walls Exterior 0 HR Interior 0 HR Floor Construction 0 HR Roof Construction 0 HR • Elevator shaft enclosure - 1 hour fire barrier (3002.1; 713.4) • Elevator Equipment Room - 1 hour fire barrier (including ceiling) (3006.4) • Stairs - 1 hour fire barrier (1009.3.1.2) • Ductwork chase: A shaft enclosure is required for penetrations by ducts protected in accordance with Section 713.4 (see also 717.6.3) • 714.4.2 Nonfire-resistance-rated assemblies. Penetrations of nonfire-resistance-rated floor or floor/ceiling assemblies or the ceiling membrane of a nonfire-resistance-rated roof/ceiling assembly shall meet the requirements of Section 713 or shall comply with Section 714.4.2.1 or 714.4.2.2 • 714.4.2.2 Penetrating items: Penetrating items that connect not more than two stories are permitted, provided that the annular space is filled with an approved material to resist the free passage of flame and the products of combustion. REQ'D SEPARATIONS PLUMBING FIXTURE CALCULATIONS 1st Floor -OPTUM - AHN Tenant (Use Group B) 90 occupants (see above) WC/Urinal - 90 occ * 1/25 = 3.6 fixtures; 6 provided plus 2 Public Lav - 90 occ * 1/40 = 2.25; 2 provided; 6 provided plus 2 Public CODE STRATEGY The following strategy is being used to approach the life safety code concerns for this building: The entire building will be designed as a B Occupancy building of Type IIB (noncombustible) construction. OCCUPANT LOAD B Occupancy = 1:100 TOTAL OCCUPANTS B Occupancy Area: 8,998 sf / 100 = 90 OCCUPANTS 8,998 sfACTUAL AREA OF PROJECT 1 1.2 2 3 4 5 6 7 8 98.8 A B C D F G H J E F.3 5.5 4.5 8.5 G.1 H.5 7.1 D.2 YY XX 0.5 2.9 4.4 5.4 6.9 161' - 6 5/8"97' - 10 3/4"LOBBY 101 VESTIBULE 100 MECH/ SPRINKLER 105 WAITING 1100 STAIR ST1-1 PUBLIC RESTROOM 103 PUBLIC RESTROOM 104 CORRIDOR 102 SHARED MANAGER OFFICE 1158 STAFF BREAK/ CONFERENCE 1156 STAFF RESTROOM 1154 PORTABLE X-RAY 1153 PATIENT RESTROOM 1139 CORRIDOR1157SOILED HOLDING 1155 BIO-HAZ 1159 STAFF WORK 1152 DIRECTOR OFFICE 1151 EXAM 1150 EXAM 1149 EXAM 1148 EXAM 1147 EXAM 1146 SHARED PHYSICAN OFFICE 1145 FUTURE TENANT 110 CORRIDOR 1141 MEDS 1144 PATIENT RESTROOM 1128 LAB 1129CLEAN SUPPLY 1136 STAFF WORK POD C 1137DOCTOR DICT. 1143 DOCTOR DICT. 1138STAFF WORK POD D 1142 SCALE 1140 CORRIDOR 1130 RECEPTION 1101 EXAM 1131 EXAM 1132 EXAM 1133 EXAM 1134 EXAM 1135 DME 1127 IT/DATA 1117 EXAM 1125 EXAM 1124 EXAM 1123 EXAM 1122 EXAM 1121 CORRIDOR 1118 PATIENT RESTROOM 1102 STAFF WORK POD A 1111 DOCTOR DICT. 1112 DOCTOR DICT. 1120 STAFF WORK POD B 1119 STAFF WORK 1114 PATIENT RESTROOM 1115 STAFF RESTROOM 1116 X-RAY 1113 EXAM 1110 EXAM 1109 EXAM 1108 EXAM 1107 EXAM 1106 CORRIDOR 1104 103'-7" 134'-2"110'-6" FEC FECELEC 108 CORRIDOR 107 STAIR ST2-1 JANITOR 109 Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE:7/16/2020 2:27:29 PMG101 FIRST FLOOR LIFE SAFETY PLAN - TENANT 1 2019.01176 07/14/2020 CONSTRUCTION DOCUMENTS CARMEL MEDICAL ARTS PAVILION - FIRST FLOOR TENANT BUILD-OUTS 12174 N. Meridian Street Carmel, Indiana 46032 N 1/8" = 1'-0"G101 1 FIRST FLOOR LIFE SAFETY PLAN REVISION SCHEDULE NO. DESCRIPTION DATE 09/17/20