CODE LEGEND
EXIT
SEMI RECESSED FIRE EXTINGUISHER CABINET W/ FIRE
EXTINGUISHER. VERIFY LOCATIONS AND QUANTITIES W/
APPLICABLE CODES, OWNER AND FIRE MARSHAL.
FEC
1 HR FIRE RATED (FIRE BARRIER)
NOTES:
A. WHERE FIRE-RESISTANCE-RATED OR SMOKE-RESISTANCE-RATED WALLS
EXTEND ABOVE A CEILING, SUCH WALLS SHALL BE PERMANENTLY AND
APPROPRIATELY IDENTIFIED IN ACCORDANCE WITH THE REQUIREMENTS
SET FORTH IN THE BUILDING CODE - SECTION 703.3.
PROJECT AREA
AREA DENOTED AS REHAB EQUIPMENT AREA AND USING
OCCUPANT LOAD 1:50
APPLICABLE
BUILDING CODES
2014 Indiana Building Code; comprised of:
-2012 International Building Code
-675 IAC 13-2.6
2014 Indiana Fire Code; comprised of:
-2012 International Fire Code
-675 IAC 22-2.5
2012 Indiana Plumbing Code; comprised of:
-2006 International Plumbing Code
-675 IAC 16-1.4
2009 Indiana Electrical Code; comprised of:
-2008 NFPA 70
-675 IAC 17-1.8
2014 Indiana Mechanical Code; comprised of:
-2012 International Mechanical Code
-675 IAC 18-1.6
ALLOWABLE HEIGHT AND AREA
OCCUPANCY
CLASSIFICATION
B Occupancy
CONSTRUCTION TYPE Type IIB
SPRINKLER SYSTEM Equipped throughout with an automatic sprinkler system in
accordance with 903.3.1.1
LIFE SAFETY / BUILDING CODE SUMMARY
TRAVEL DISTANCE
RESTRICTIONS
• Dead-end Corridor Limit: 50 ft
• Common Path of Travel: 100 ft
• Exit Travel Distance: 300 ft to exit access or exit
3 story; 55 ft
23,000 sf
3 story; 48'-6" ft
43,822 sf
ACTUAL HEIGHT AND
BUILDING AREA
TABULAR VALUES:
sprinkler: 1 story; 20 ftHEIGHT INCREASE:
sprinkler: 200% of 23,000 = 46,000 sf
frontage: 75% of 23,000 = 17,250 sf
AREA INCREASE:
height: 4 story; 75 ft
area: 86,250 sf (per floor); 172,500 sf (building)
TOTALS:
BUILDING USE
This facility will be used for professional offices.
FIRE RESISTANCE
RATING REQ'TS FOR
BUILDING
ELEMENTS
Structural Frame 0 HR
Bearing Walls
Exterior 0 HR
Interior 0 HR
Non Bearing Walls
Exterior 0 HR
Interior 0 HR
Floor Construction 0 HR
Roof Construction 0 HR
• Elevator shaft enclosure - 1 hour fire barrier (3002.1; 713.4)
• Elevator Equipment Room - 1 hour fire barrier (including ceiling)
(3006.4)
• Stairs - 1 hour fire barrier (1009.3.1.2)
• Ductwork chase: A shaft enclosure is required for penetrations by
ducts protected in accordance with Section 713.4 (see also
717.6.3)
• 714.4.2 Nonfire-resistance-rated assemblies. Penetrations of
nonfire-resistance-rated floor or floor/ceiling assemblies or the
ceiling membrane of a nonfire-resistance-rated roof/ceiling
assembly shall meet the requirements of Section 713 or shall
comply with Section 714.4.2.1 or 714.4.2.2
• 714.4.2.2 Penetrating items: Penetrating items that connect not
more than two stories are permitted, provided that the annular
space is filled with an approved material to resist the free passage
of flame and the products of combustion.
REQ'D SEPARATIONS
PLUMBING FIXTURE
CALCULATIONS
1st Floor - Team Rehab
Tenant (Use Group B)
38 occupants (see above)
WC/Urinal - 38 occ * 1/25 = 1.52 fixtures; 2 provided
Lav - 38 occ * 1/40 = 0.95; 2 provided
2,898 sfACTUAL AREA OF
PROJECT
OCCUPANT LOAD
B Occupancy = 1:100
REHAB EQUIPMENT AREA = 1:50
TOTAL OCCUPANTS
B Occupancy Area: 1,998 sf / 100 = 20
Rehab Equipment Area: 900 / 50 = 18 OCCUPANTS
Total Occupants = 38
CODE STRATEGY
The following strategy is being used to approach the life safety code
concerns for this building:
The entire building will be designed as a B Occupancy building of Type
IIB (noncombustible) construction.
PATIENT
RESTROOM
1209
VESTIBULE
1200 RECEPTION
1203WAITING
1201
REHAB
1206
LAUNDRY
1208
STAFF
BREAK
1211
TREATMENT
1205
OFFICE
1212
TREATMENT
1204
STAFF
RESTROOM
1210
PHYSICIAN
WORK
1207
FEC
98 ft.DATA CLOS.
1213
STAIR
ST2-1
JANITOR
109
ELEC
108
CORRIDOR
107
CORRIDOR
102
PUBLIC
RESTROOM
104
PUBLIC
RESTROOM
103
LOBBY
101
VESTIBULE
100
MECH/
SPRINKLER
105
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:7/16/2020 2:12:42 PMG102
FIRST FLOOR LIFE
SAFETY PLAN
2019.01176
07/14/2020
CONSTRUCTION DOCUMENTS
CARMEL MEDICAL ARTS
PAVILION - FIRST FLOOR
TENANT BUILD-OUTS
12174 N. Meridian Street
Carmel, Indiana 46032
N
1/8" = 1'-0"G102
1 FIRST FLOOR LIFE SAFETY PLAN - TEAM REHAB
REVISION SCHEDULE
NO. DESCRIPTION DATE
09/17/20