Loading...
HomeMy WebLinkAboutM-5012X DI A.STR AIGHT DUCTAT INLETSUPPORT TERMINAL UNIT WITH DUCT STRAP AT ALL FOUR CORNERS CONTROL ENCLOSURE, MAINTAIN 2'-0" CLEARANCE MEDIUM OR HIGH PRESSURE PRIMARY SUPPLY DUCTWORK TRANSITION TO INLET SIZE TYPICAL VAV TERMINAL UNIT FASTEN WITH TWO SCREWS MINIMUM REHEAT COIL ON DISCHARGE, REFER TO PIPING DIAGRAM SLIP AND DRIVE CONNECTION FINISHED FLOOR AS SCHEDULED LIGHTING CONTROLS, INTERCOM, PULL STATION, THERMOSTAT DOOR FRAME/WALL OPENING WHERE OCCURS LOCATE DEVICES 6" FROM DOOR/WALL OPENING, OR AS DIMENSIONED. WHERE NOT DIMENSIONED, LOCATE AT NEAREST STUD FROM LOCATION SHOWN ON FLOOR PLAN 6"UON44" UONSPECIFICATION FOR JOINING AND ATTACHING FLEXIBLE DUCT DUCTWORK SPIN-IN FITTING W/VOLUME DAMPER FLEXIBLE DUCT-MAXIMUM 6'-0" LENGTH AND NO MORE THAN TWO (2) 90° BENDS. SQUARE TO ROUND FITTING CEILINGAIR TERMINAL A. METALLIC FLEXIBLE DUCT SHALL BE ATTACHED USING A MINIMUM OF THREE #8 SHEET METAL SCREWS EQUALLY SPACED AROUND THE DUCT'S CIRCUMFERENCE; DUCTS LARGER THAN 12"Ø SHALL HAVE A MINIMUM OF FIVE #8 SHEET METAL SCREWS. SCREWS SHALL BE LOCATED AT LEAST 8" FROM THE DUCT END. B. NON-METALLIC FLEXIBLE DUCT SHALL BE SECURED TO THE SLEEVE OR COLLAR USING A DRAW BAND. IF THE DUCT COLLAR EXCEEDS 12"Ø, THE DRAW BAND MUST BE POSITIONED BEHIND A BEAD ON THE METAL COLLAR. C. INSULATION AND VAPOR BARRIERS PRESENT ON FACTORY-FABRICATED DUCTS SHALL BE FITTED OVER THE CORE CONNECTION AND SHALL BE SUPPLEMENTALLY SECURED WITH A DRAW BAND. D. FLEXIBLE DUCT SEALING SHALL BE A CLASS "B" FOR LOW PRESSURE DUCT. UPBLAST CENTRIFUGAL EXHAUST FAN BIRDSCREEN NEMA 3R DISCONNECT FACTORY WIRED FROM MOTOR TO DISCONNECT THROUGH THE BREATHER TUBE LIQUID TIGHT FLEXIBLE CONDUIT (BY OTHERS) PREFABRICATED ROOF CURB ROOF AUTO BACKDRAFT DAMPER SEE PLANS FOR DUCT SIZE PROVIDE HOLE THRU ROOF SEE ARCH PLANS FOR ROOF CONSTRUCTION TYPICAL PACKAGED ROOFTOP UNIT PLUG VALVE UNION PIPE REDUCER PRESSURE REDUCING VALVE DIRT LEG PIPING BRANCH REFER TO PLANS FOR SIZE PIPE SUPPORT (TYPICAL) INSTALL GROMMET AT PENETRATION THRU CABINET Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE:7/14/2020 12:53:49 PMM-501 MECHANICAL DETAILS 2019.01176 07/14/2020 CONSTRUCTION DOCUMENTS CARMEL MEDICAL ARTS PAVILION -FIRST FLOOR TENANT BUILD-OUTS 12174 N. Meridian Street Carmel, Indiana 46032 12" = 1'-0" VAV WITH REHEAT TERMINAL UNIT DETAIL 1 1/2" = 1'-0" TYPICAL THERMOSTAT MOUNTING DETAIL2 12" = 1'-0" TYPICAL AIR TERMINAL INSTALLATION DETAIL3 12" = 1'-0" TYPICAL EXHAUST FAN (UPBLAST) DETAIL4 12" = 1'-0" ROOFTOP UNIT GAS PIPING DETAIL5 REVISION SCHEDULE NO. DESCRIPTION DATE 09/17/20