Loading...
HomeMy WebLinkAboutSYSTEMS PLAN - TENANT 12WDHH T T T J J J +44"+44" CR J J CR V HHVV VV HV J J CR CR CR7 8 8.8 9 C D E F F.3 F.5 G G.8 H J I VAV-117 VAV-116 1H1-36,38,40 1H1-39,41,43,F40 PATIENT RESTROOM 1209 VESTIBULE 1200 RECEPTION 1203 WAITING 1201 REHAB 1206 LAUNDRY 1208 STAFF BREAK 1211 TREATMENT 1205 OFFICE 1212 TREATMENT 1204 STAFF RESTROOM 1210 PHYSICIAN WORK 1207 ELECTRICAL 1160 STAIR 2 1161 JANITOR 1162 1H1 1L1 2 1 TYP. 1L1-35 1L1-35 2 1L1-37 1L1-41 1L1-41 1L1-41 1L1-43 1L1-43 1L1-43 1L1-37 1L1-37 1L1-39 1L1-39 1L1-39 1L1-39 1L1-37 1L1-49 1L1-49 1L1-47 1L1-47 1L1-45 1L1-451L1-511L1-53 1L1-531L1-531L1-53 1L1-69,71,F301L1-731L1-551L1-571L1-591L1-591L1-61 1L1-63 1L1-65 1L1-67 1L1-79 1L1-77 1L1-75 1L1-81 1L1-81 1L1-81 1L1-81 9 4 5 6 3 7 1L1-838 TYP. 1L2 10 Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE:7/15/2020 3:06:51 PME301.12 FIRST LEVEL POWER/SYSTEMS PLAN - TENANT 12 2019.00780 7.14.2020 CONSTRUCTION DOCUMENTS CARMEL MEDICAL ARTS PAVILION 12174 N. Meridian Street Carmel, Indiana 46032 1/8" = 1'-0"1 FIRST LEVEL POWER/SYSTEMS PLAN - TENANT 12 GENERAL NOTES A. REFER TO DRAWING E001 FOR ELECTRICAL SYMBOLS AND ADDITIONAL GENERAL NOTES. B. COORDINATE ALL WORK WITH THE OWNER AND THE OTHER TRADES ON THE PROJECT. C. REFER TO M AND P SERIES DRAWINGS FOR ADDITIONAL ELECTRICAL REQUIREMENTS. D. PROTECT ALL FINISHES, EQUIPMENT, AND DEVICES DURING THE WORK. E. REFER TO ARCHITECTURAL SCHEDULES, DETAILS, AND ELEVATIONS FOR ADDITIONAL INFORMATION ON DEVICE LOCATIONS PRIOR TO ROUGH-IN. F. COORDINATE ALL WORK WITH THE OWNER'S SYSTEMS VENDORS FOR DEVICES AND WIRING FOR DATA, I.T. SERVICES, AND SECURITY SYSTEMS. G. ELECTRICAL SERVICES SHALL NOT ROUTE THROUGH ANY IDF OR MDF ROOM UNLESS DIRECTLY SERVING THAT \ROOM. H. CONTRACTOR SHALL VERIFY CORD AND PLUG CONNECTED EQUIPMENT CORD CONFIGURATION AND PROVIDE MATCHING RECEPTACLE AS REQUIRED. I. ALL RECEPTACLES WITHIN SIX FEET OF A SINK SHALL BE GFCI TYPE. DEVICES MAY NOT BE IDENTIFIED AS GFCI ON PLANS, BUT SHALL BE PROVIDED ACCORDING TO THE REQUIREMENT. J. ALL SPECIAL TYPE RECEPTACLES SHALL BE NEMA 6-20R UNLESS NOTED OTHERWISE AND SHALL BE CIRCUITED WITH (2) #10 + (1) #10 NEUTRAL + (1) #10 GROUND. COORDINATE REQUIREMENTS WITH OWNER SUPPLIED EQUIPMENT PRIOR TO INSTALLATION. K. COORDINATE INSTALLATION OF LIGHT FIXTURES WITH ARCHITECTURAL REFLECTED CEILING PLAN, ARCHITECTURAL ELEVATIONS, HVAC EQUIPMENT, DIFFUSERS, DUCTWORK, PIPING, SUPPORTS, AND STRUCTURE PRIOR TO ROUGH-IN. L. ALL EXIT SIGNS, EMERGENCY BATTERY LIGHTING UNITS, AND LIGHT FIXTURES SHOWN WITH EMERGENCY BATTERY BACKUP OR INDICATED AS A NIGHT LIGHT ("NL") SHALL BE PROVIDED WITH AN UNSWITCHED "HOT" CIRCUIT CONDUCTOR. M. AT LOCATIONS WITH TWO OR MORE WALL SWITCHES, ALL SWITCHES SHALL BE INSTALLED GANGED IN A COMMON SWITCH BOX. N. AT LOCATIONS WHERE LIGHT SWITCHES AND ABOVE-COUNTER RECEPTACLES ARE TO BE MOUNTED ADJACENT TO EACH OTHER, THE DEVICES SHALL BE INSTALLED AT THE SAME HEIGHT. O. WHERE OCCUPANCY SENSORS ARE INDICATED ON PLANS, THE ENTIRE ROOM SHALL BE COVERED. SENSOR MANUFACTURER IS RESPONSIBLE FOR SENSOR LAYOUT. ADDITIONAL SENSORS REQUIRED DUE TO LACK OF COVERAGE SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR. PROVIDE QUANTITIES AS REQUIRED. CEILING AND WALL MOUNTED SENSORS SHALL BE DUAL-TECHNOLOGY TYPE. SENSORS SHALL INCLUDED ALL POWER SUPPLIES AND RELAYS NECESSARY TO CONTROL LIGHT FIXTURES IN ROOM/AREA. SENSORS SHALL OPERATE IN "VACANCY" MODE - MANUAL ON/AUTO OFF. P. PROVIDE PULL STRING IN ALL EMPTY CONDUITS. Q. CONTRACTOR TO PROVIDE ROUGH-INS ONLY FOR DATA, I.T. SERVICES, AND SECURITY SYSTEMS. DATA, I.T. SERVICES, AND SECURITY SYSTEMS DEVICES AND WIRING TO BE PROVIDED BY THE OWNERS SYSTEMS VENDORS. PROVIDE ROUGH-INS WITH "RING AND STRING". PLAN NOTES 1 EXISTING TO REMAIN. 2 CONNECT AUTO OPERATORS COMPLETE. PROVIDE ALL ASSOCIATED ROUGH-INS AND CONTROL WIRING IN CONDUIT AS REQUIRED. PROVIDE TOGGLE DISCONNECT SWITCH. 3 PROVIDE 3P-30A, 480V, FUSIBLE DISCONNECT SWITCH FUSED PER UNIT MANUFACTURERS RECOMMENDATIONS. PROVIDE ADDITIONAL SUPPORT STRUCTURE AS REQUIRED. 4 NEMA 14-30R RECEPTACLE FOR DRYER. CONTRACTOR SHALL VERIFY RECEPTACLE CONFIGURATION, CIRCUIT SIZE, AND MOUNTING HEIGHT WITH OWNER PRIOR TO INSTALLATION. DRYER MAY BE DIFFERENT THAN WHAT IS SHOWN ON PLAN. 5 GARBAGE DISPOSAL SWITCH INSTALLED OVER COUNTERTOP AT +2" ABOVE BACKSPLASH TO BOTTOM OF DEVICE. COORDINATE MOUNTING HEIGHT WITH CASEWORK TO BE INSTALLED. 6 RECEPTACLE FOR MOBILE HEATING UNIT. VERIFY EXACT LOCATION WITH OWNER PRIOR TO ROUGH-IN. 7 PROVIDE (1) 2" CONDUIT TO TENANT SPACE FOR TELECOM UTILITY SERVICE. 8 PROVIDE ROUGH-INS FOR CARD READER AS REQUIRED. REFER TO ELECTRICAL DETAILS FOR ADDITIONAL INFORMATION. 9 PROVIDE 3P-60A, 480V, FUSIBLE DISCONNECT SWITCH FUSED PER UNIT MANUFACTURERS RECOMMENDATIONS. PROVIDE ADDITIONAL SUPPORT STRUCTURE AS REQUIRED. REVISION SCHEDULE NO. DESCRIPTION DATE 09/17/20