Loading...
HomeMy WebLinkAboutGRT 15 - 42290012 - Energy CertificateIndiana 2�2� Perfarman�e �ompliance Praperty 936 KINZERAVENUE CARMEL, IN 4fi032 Madel: TH 9i98 FITZ SL6 ENa 10P Community: GRAMERCY WEST-TD 909aAVIN GRAMERCY lNEST- TDWNHDMES 936 KINZER Performance-based compliance passes by 6.3°�6 Air Leakage Testing Area-weighted average fenestration SHGC Area-weighted a�erage fenestration Ll-Factor Annual Energy Cost Design Heating Cooling Water Heating Mechanical Ventilatian 5ubTotal - Used to determine �omplian�e Lights & Appliances wlout Ventilation �nsite generation Total Indiana 2020 Performance $640 $92 $324 $19 $1,�74 $48fi $0 $1,560 Inspe�tion 5tatus Results are projected This report is based an a proposed design and does not confirm field enforcement of design elements. Requirements � � � � � � � � 11D5 11 D2.4.12 11 D2.5 11 D2.5 11D4.1 Lighting Equipment Efficiency f�landatory Checklist �'�andatory code requirements that are not checked by Ekotrope must be met. 11D3.6 Mechanical Ventilation Rate 1103.6.1 hlechanical Ventilation Efficacy a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� As aesigned $568 $92 $324 $22 $1,D�7 $486 $0 $1,493 Air sealing is 4.00 AGH at 50 Pa. It must not exceed 5.0� ACH at 5a Pa. Design ex�eeds requirements fvr Indiana 202� Perfvrman�e compliance hy fi.3°Io. As a 3rd party extension of the code jurisdi�tion utilizing these reports, I certify that this energy code complian�e document has been created in accordan�e with the requirements of Chapter 4 of the adopted Intemational Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certiTy that the building design des�ribed herein is consistent with the building plans, specifications, and other �al�ulations submitted �tiith the permit application. If rating is Confirmed, I �ertiTy that the address referenced abo�e has been inspected.+tested and that the mandatory pro�isions of the IECC have 6een installed to meet or ex�eed the intent of the IECC or will be verified as such by another party. Name Organizatian ❑rganixatian TopBuild Home 5ervi�es, I Eric Bjerre 6uilder QAVIQ 1NEEKLEY HDMES Eric 8jerre TapBuild Home 5eruices. In� Signature: ��'�'G ���� ❑igitally sig��ed: 81�1!2D at 10:01 Af�9 Ekotrope RATER - Vers�on 3.2.3.25�9 Indiana 202� Perforinance compliance results calculated using Ekotrope RATER's energ}� and code compliance algorithm, including appropriate amendments. Ekotrope RATER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered 6y Ekotrope users. Ekotrope disclaims all lia6ility for the information shown on this report. Energy �ode Inspectian Checklist Property ❑rganixatian 936 KINZERAVENUE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: TH 9i98 FITZ SL6 ENa 10P Community: GRAMERCY WEST-TD 6uilder QAVIQ 1NEEKLEY 909aAVIN GRAMERCY lNEST- HDMES TDWNHDMES 936 KINZER �eneral Building Infvrmatian Canditioned Area �sq ft} Canditioned Valume (�ubic ft) Insulated Shell Area (sq ft� 1,680 17,625 4,713.5 Inspe�tion 5tatus Results are projected a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� The building energy model in Ekotrope reflects the building assemblies and energy features listed below. Sometimes energy features will �hange in the field frorn what has been modeled. The inspection pro�ess should identify any �hanges and ensure that the home cantinues to meet the applicable energy code. 51ab � Name: SLAB(631 s.f., 105.3 ft. exterior perirneter} R-10 perimeter insulation, R-10 under slab insulation. Framed Flvar � Name: FDA �4D s.f.) R-0 continuous insulation, R-30 cavity insulation Insulatian Grade: I � Name: FDG (424 s.f.} R-0 continuous insulation, R-30 cavity insulatian Insulation Grade: I Fvundatian Wall Nane Present Abvve �rade Wall � Name: AMB (1,43D.8 s.f.} R-3 continuous insulati�n, R-19 cavity insulation Insulation Grade: I � Name: GAR (206.7 s.f.} R-0 continuous insulation, R-19 cavity insulatian Insulati�n Grade: I Energy �ode Inspectian Checklist Property ❑rganixatian 936 KINZERAVENUE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: TH 9i98 FITZ SL6 ENa 10P Community: GRAMERCY WEST-TD 6uilder QAVIQ 1NEEKLEY 909aAVIN GRAMERCY lNEST- HDMES TDWNHDMES 936 KINZER � Name: ATT �5 s.f.} R-0.5 continuous insulation, R-19 �avity insulation Insulation Grade: I � Name: CaM �749 s.f.� R-a continuous insulation, R-13 cavity insulatian Insulation Grade: I Rim Jaist � Name: AMB (102 s.f.} R: 22.00 � Name: ATT �3D s.f.} R: 19.00 Ceiling 1 Ravf � Name: FLAT �1,095 s.f.� R-25 continuous insulatian, R-13 cavity insulation Insulation Grade: I Dpaque Daar � Name: AMB (20 s.f.) U: 0.227 � Name: GAR (17.8 s.f.} U: 0.227 �lazing Inspe�tion 5tatus Results are projected � Name: FR�NT 1 ST (36 s.f.), U: 0.340, SHGC: 0.31, �rientation: EAST � Name: FR�NT 1 ST (12 s.f.), U: 0.340, SHGC: 0.31, �rientatian: EAST � Name: FR�NT 1 ST (3 s.f.}, U: 0.340, SHGC: 0.31, ❑rientation: EAST a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� 2 Energy �ode Inspectian Checklist Property ❑rganixatian 936 KINZERAVENUE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: TH 9i98 FITZ SL6 ENa 10P Community: GRAMERCY WEST-TD 6uilder QAVIQ 1NEEKLEY Inspe�tion 5tatus Results are projected 909aAVIN GRAMERCY lNEST- HDMES TDWNHDMES 936 KINZER � Name: FR�NT 2ND �18 s.f.}, lJ: 0.340, SHGC: 0.31, ❑rientation: EAST � Name: FR�NT 2ND �36 s.f.}, lJ: 0.340, SHGC: 0.31, ❑rientation: EAST � Name: BAGK 2ND �18 s.f.}, U: 0.34a, SHGC: a.31, ❑rientation: WEST � Name: BAGK 2ND �36 s.f.}, U: 0.34a, SHGC: 0.31, ❑rientation: UVEST 5kylight Nane Present Mechanical Ventilativn � Mechanical ventilatian system rated for, and capable of, providing cantinuous �entilation. System shall include automatic timing controls. System type: Air Cycler, � hrsJday, 1 fiD.8 UVatts Mechanical Equiprnent � Fuel-fired air distributiQn {1 }• Natural Gas • 10Q°/o Heating Load [�7a 93 AFUE � Air conditioner (2} • Electric • 1 DD°Io Caoling Load [�7a 13 SEER � Water Heating �3} • Electric • 100°Io Hot lNater Laad a� 0.93 Energy Factor Air Leakage Cvntrvl � Test Status: 6lower-door tested House is air-sealed as to achieve 1,174 CFM50 �4.00 AGH50} or less at final blower-door test. Infiltration Requirements for IECC in Climate Z�ne 5 2a09 IECC Infiltration limit for the design home is 7 ACHS�. 2a12 IECC Infiltration limit for the design hame is 3 ACHS�. 2a15 IECC Infiltration limit for the design hame is 3 ACHS�. 2a18 IECC Infiltration limit for the design home is 3 ACHS�. a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� 3 Energy �ode Inspectian Checklist Property ❑rganixatian 936 KINZERAVENUE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: TH 9i98 FITZ SL6 ENa 10P Community: GRAMERCY WEST-TD 6uilder QAVIQ 1NEEKLEY 909aAVIN GRAMERCY lNEST- HDMES TDWNHDMES 936 KINZER Duct Leakage Duct 5ystem 1 Inspe�tion 5tatus Results are projected NDT entirely within �onditioned spa�e, testing required Leakage to ❑utside spe�ified as: 3 CFM251 1 DD ft2 Total Leakage spe�ified as: 4 CFM25 ! 1 D� ftZ �Post-Constru�tion} Duct Leakage Cvde Requirements fvr IECC 2009 IECC: Postconstructian Leakage Test: ❑uct Leakage ta �utdoors �= 8 CFM251 1 a0 sq ft �FA. Rough in Test with AHU: Tatal auct Leakage c= � CFM251 100 sq ft CFA. Rough in Test without AHU: Total Duct Leakage �= 4 CFM25 ! 100 sq ft CFA. 2012 IECC Mandatory, 2D15 and 2018 IECC Prescriptive Paths: Postconstructian Leakage Test: Tatal au�t Leaka�e �= 4 CFM251 100 sq ft CFA. Rough in Test with AHU: Total auct Leakage �= 4 CFM251 100 sq ft CFA. Rough in Test without AHU: Total Duct Leakage �= 3 CFM25 ! 100 sq ft CFA. �015 and 2018 IECC Performance Paths �C�st Compliancey: a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� Leakage testing is required UNLESS all ducts and air handlers are lo�ated entirely within the thermal envelope. There is no passlfail threshold for duct leakage Qn the performance path. Praject Nates ❑RG ID: 48 ACC#: 909DAVIN BUILDER NAME: DAVID WEEKLEY HOMES PR�7ECT ID: 50747 SUBDIV25IDN: GRAMERCY WEST-TOI�INHOMES PLAN ID: 871778 PLAN NAME: 935 KINZER AVENUE-TH 9798 REVISIDN DATE: 08�21�2020 PR�GRAM: EFL�P�3Y�100��CH5:N❑ CREATED ❑N: 08�21�2020 FIT� SLB END 10PL RL-CC 4