Loading...
HomeMy WebLinkAboutM1003 5 10 13 15 16 17 C E H J M O S 2 1 9 6 D B A F 18 T G L N 7 4 11 12 14 K 28 R P 300 E-1 300 E-1 75 E-2 120 S-1 120 S-1 120 R-1 120 S-1 120 R-1 120 S-1 120 R-1 120 S-1 120 R-1 275 S-3 275 S-3 200 S-2 120 S-1 120 S-1 150 S-2 120 R-1 220 R-1 200 R-1 22"Ø 22"Ø 140 S-2 140 S-2 300 S-3 300 S-3 120 S-1 120 S-1 120 S-1 220 S-2 220 S-2 220 S-2 220 S-2 220 S-2 220 S-2 100 S-1 75 S-1 220 S-1 75 R-1 100 R-1 120 R-1 120 R-1 600 R-1 280 R-1 150 R-1 1400 R-2 240 S-3 220 R-1 120 R-1 220 S-2 12"Ø16"Ø 20Ø 20"Ø 16'Ø RTU-46"Ø6"Ø6"Ø6"Ø6"Ø6"Ø8"Ø8"Ø8"Ø8"Ø8"Ø10"Ø6"Ø 8"Ø 8"Ø6"Ø8"Ø8"Ø10"Ø12/106"Ø 6"Ø16/14 22/14ECH-1 EWH-1 T T T T 18/1422/1420/1414"Ø 120 R-1 12"Ø 6"Ø10"Ø 16/14 120 R-1 120 R-1 14/14 12"ØKEY PLAN AB N DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 1 SCALE: 1/8" = 1'-0" FIRST FLOOR HVAC PLAN - AREA 'A' KEY NOTES: GENERAL NOTES: 1 ROUTE DUCTING BELOW 2ND FLOOR FRAMING TIGHT TO I BEAMS. COORDINATE WITH PLUMBING, SPRINKLER AND ELECTRICAL CONTRACTORS. 1. REFERENCE SHEET M-001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEETS M-002 THOUGH M-004 FOR DETAILS, SCHEDULES AND NOTES. 3. PRIOR TO ROUGH IN, COORDINATE TEMPERATURE CONTROL RACEWAYS WITH E.C. M.C. TO PROVIDE ALL CONTROLS AND LOW VOLTAGE CABLES, E.C. TO PROVIDE ALL MOTOR STARTERS, RACEWAYS AND LINE VOLTAGE CONDUCTORS. 1 M100 09/21/20