Loading...
HomeMy WebLinkAboutM2003 5 10 13 15 16 17 C E H J M O S 2 1 B A T G L N 11 12 14 7 2 F 18 75 E-2 75 E-2 75 E-2 16"Ø 200 S-2 200 S-2 200 S-2 200 S-2 120 S-1 75 S-1 75 S-1 120 S-1 220 S-1 220 S-1 1000 R-2 1000 R-2 800 R-1 400 S-4 600 S-4 600 S-4 600 S-4 600 S-4 600 S-4 400 S-5 400 S-5 400 S-5 400 S-5 400 S-5 400 S-5 400 S-5 400 S-5 400 S-5 400 S-5 400 S-5 400 S-5 1600 R-2 1600 R-2 375 S-5 375 S-5 375 S-5 375 S-5 EF-6 18"Ø 30/30 30/30 1600 R-2 1600 R-2 1600 R-2 24/16 22/12 18/12 12/1210"Ø30/16 30/20 30/22 30/26 10"Ø10"Ø10"Ø10"Ø10"Ø10"Ø10"Ø 10"Ø10"Ø12"Ø12"Ø12"Ø12"Ø12"Ø30/20 30/26 22/20 18"Ø18"Ø18"Ø 18"Ø 18"Ø10"Ø10"Ø 10"Ø10"Ø10"Ø 14"Ø14"Ø8"Ø 8"Ø 10"Ø120 R-1 14"ØS-1 200 10"Ø 8"Ø10"Ø 8"Ø10"Ø14"Ø200 R-1 440 R-1 AHU-1 T 120 R-1 10"Ø 10"Ø 12/10 UP TO EF-5 8/8 UP TO EF-6 18"Ø 18"Ø 18"Ø 18"Ø 18"Ø 18"Ø 30/28KEY PLAN B C N DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 1 SCALE: 1/8" = 1'-0" SECOND FLOOR HVAC PLAN - AREA 'C' KEY NOTES: GENERAL NOTES: 1 ROUTE DUCTING BELOW 2ND FLOOR FRAMING TIGHT TO I BEAMS. COORDINATE WITH PLUMBING, SPRINKLER AND ELECTRICAL CONTRACTORS. 1. REFERENCE SHEET M-001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEETS M-002 THOUGH M-004 FOR DETAILS, SCHEDULES AND NOTES. 3. PRIOR TO ROUGH IN, COORDINATE TEMPERATURE CONTROL RACEWAYS WITH E.C. M.C. TO PROVIDE ALL CONTROLS AND LOW VOLTAGE CABLES, E.C. TO PROVIDE ALL MOTOR STARTERS, RACEWAYS AND LINE VOLTAGE CONDUCTORS. 1 M200 09/21/20