Loading...
HomeMy WebLinkAboutNAPLETON KIA OF CARMEL-PLUMB-20190708DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 ROOF JACK, MATCH ROOF COLOR ROOF TOP UNIT REVOLUTIONS PER MINUTE SUPPLY AIR FAN RJ RPM RTU SAF STATIC PRESSURESP TCC TSP TOTAL STATIC PRESSURE WALL CAPWC WALK IN COOLERWIC WALK IN FREEZERWIF ET EXPANSION TANK ELECTRIC WATER COOLEREWC TMV THERMOSTATIC MIXING VALVE AFF ABOVE FINISH FLOOR URINAL SK SINK MOP SINK WATER CLOSET WATER HEATER CO CLEAN OUT PLUMBING CONTRACTOR STORM DRAIN VENT THROUGH ROOF SANITARY SEWER ST STORAGE TANK SD SAN CW COLD WATER DOMESTIC PC PRV PSI PRESSURE RELEIF VALVE POUNDS PER SQUARE INCH MS LAV LAVATORY HWS HWR HOT WATER RETURN DOMESTIC HOT WATER SUPPLY DOMESTIC GPM GALLONS PER MINUTE WH GC GENERAL CONTRACTOR VTR UR WC FOOTFT INCHIN LEAVING AIR TEMPERATURE LINEAR SLOT DIFFUSER MANUAL LAT IR MAN LS 1000 BTUH MECHANICAL CONTRACTOR MOTOR CONTROL CENTER MBH MC MCC MFR MANUFACTURER PRESSURE DROP POOL DEHUMIDIFICATION UNIT PACKAGE TERMINAL AIR CONDITIONER POUNDS PER SQUARE INCH PRESSURE RELEIF VALVE PD PDU PTAC PSI PRV INFRA-RED AIR HANDLING UNIT ACCU AHU BOTTOM OF DUCT BACKDRAFT DAMPER BOD BDD COMBUSTION AIR CUBIC FEET PER MINUTE CA CFM AIR COOLED CONDENSING UNIT ENTERING AIR WET BULB ENTERING AIR DRY BULB DIAMETER EAWB EADB Ø DRY BULBDB ELECTRICAL CONTRACTOREC ELECTRIC WALL HEATER EXHAUST FANEF EWH HOOD EXTERNAL STATIC PRESSURE ELECTRIC REHEAT COIL H ESP ERC E EXHAUST GRILLE OR REGISTER FURNACE FCU F FIRE DAMPER OR FLOOR DRAIN FIRE AND SMOKE DAMPER FD FD/SD FEET PER MINUTEFPM FAN COIL UNIT ABBREVIATIONS UNLESS OTHERWISE NOTEDUON TEMPERATURE CONTROL CONTRACTOR REDUCED PRESSURE ZONED BACKFLOWRPZB FSK FOIL SCRIM VAPOR BARRIER RETURN AIRRA SUPPLY AIRSA EXHAUST AIR OR EACHEA OUTSIDE AIROA VARIABLE AIR VOLUME BOXVAV FAN POWERED VAV BOXFPVAV DEGREES FARENHEITDEG F CND HW HWR SD SAN RD PIPING LINETYPES CONDENSATE DRAIN HEATING WATER SUPPLY DOMESTIC HEATING WATER RETURN DOMESTIC STORM DRAIN SANITARY SEWER COLD WATER DOMESTIC ROOF DRAIN SYMBOLS COMPRESSED AIR CW CA GREASE/OIL/DIRT DRAIN LINE GL GASGAS NATURAL OR PROPANE ANCHOR / HANGER BALL VALVE BUTTERFLY VALVE EXPANSION JOINT GATE VALVE GLOBE VALVE GAS METER PIPE GUIDE "P" TRAP TEST PLUG PLUG VALVE WATER METER UNION THERMOMETER "Y" STRAINER PRESSURE GAUGE BALANCING VALVE CHECK, SWING VALVE FLEXIBLE PUMP CONNECTION FLANGED CONNECTION DROP PITCH DOWN IN DIRECTION OF ARROW RUN OUT OFF BOTTOM OF MAIN RUN OUT OFF TOP OF MAIN RISER TEE OFF SIDE OF MAIN PIPING SYMBOLS M GM P PENDANT STYLE FIRE SUPPRESSION HEAD PLUMBING SPECIFICATIONS GENERAL 1. BID INSTRUCTIONS: CONTRACTORS SHALL PROVIDE BASE BID IN STRICT ACCORDANCE WITH DESIGN BASIS EQUIPMENT AND MATERIALS. PROJECT DOES ENCOURAGE COMPETITIVE PRICING AND ALLOWS FOR SUBSTITUTIONS OF EQUIPMENT AND MATERIALS AS ALTERNATE DEDUCTS TO BASIS OF DESIGN BIDS. LIST ALL SUBSTITUTIONS ALONG WITH DEDUCTS OFFERED ON BID. ENGINEER RESERVES THE RIGHT TO REJECT SUBSTITUTIONS FOUND NOT TO BE EQUAL TO ITEMS LISTED IN DESIGN BASIS. 2. PRIOR TO PROCUREMENT CONTRACTOR SHALL SUBMIT TO ARCHITECT FULL SUBMITTALS FOR ALL ENERGY CONSUMING OR PRODUCING ITEMS AND FOR ALL PLUMBING FIXTURES, VALVES, DRAINS, CLEAN OUTS, PIPING, PIPING ACCESSORIES, INSULATION AND PIPING HANGERS. SUBMITTALS SHALL BE DELINEATED WITH TAGS INDICATED ON PRINTS, CONTRACTORS NAME, PROJECT NAME. CLEARLY INDICATE ALL MODEL NUMBERS AND ALL ACCESSORIES AND OPTIONS BEING PROVIDED. SUBMISSIONS SHALL BE IN PDF FORMAT.ENGINEER RESERVES THE RIGHT TO REJECT ANY SUBSTITUTE ITEM. 3. CONTRACTOR SHALL BE RESPONSIBLE TO VISIT THE SITE TO EXAMINE ALL CONDITIONS THAT MAY IN ANY WAY AFFECT THE EXECUTION OF HIS WORK. HE SHALL ALSO EXAMINE THE DRAWINGS AND SPECIFICATIONS FOR OTHER BRANCHES OF WORK MAKING REFERENCE TO THEM FOR DETAILS OF EXISTING BUILDING CONDITIONS. NO EXTRAS WILL BE ALLOWED FOR FAILURE TO INCLUDE ALL REQUIRED WORK IN THE BID. CONTRACTOR SHALL GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. 4. THE DRAWINGS IN THIS SECTION ARE DIAGRAMMATIC AND ARE NOT INTENDED TO DEFINE EXACT QUANTITIES, LOCATIONS OR CODIFIED REQUIREMENTS. DRAWINGS SHOW GENERAL INTENT OF SYSTEMS. P.C. SHALL PROVIDE AND PAY FOR ALL REQUIRED PERMITS. 5. UPON COMPLETION OF THE PLUMBING INSTALLATION, DEMONSTRATE TO THE ENGINEER AND/OR THE OWNER'S SATISFACTION THAT THE SYSTEMS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS AND APPLICABLE CODES. DEMONSTRATE THE DYNAMIC OPERATION OF EACH SYSTEM. VERIFY PROPER OPERATION OF EQUIPMENT, FILTERS ARE CLEAN AND COMPONENTS OF THE SYSTEM ARE INSTALLED AND ADJUSTED IN FULL ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. 6. PLUMBING WORK SHALL BE COMPLETE IN EVERY DETAIL AND ALL MISCELLANEOUS ITEMS OF MATERIAL AND LABOR NECESSARY TO COMPLETE THE WORK DESCRIBED, SHOWN OR REASONABLY IMPLIED ON DRAWINGS OR SPECIFICATIONS SHALL BE INCLUDED IN THE CONTRACT. CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS TO THE WORK WHERE REQUIRED, WHEN SUCH ADJUSTMENTS ARE NECESSARY FOR PROPER OPERATION AND WITHIN THE INTENT OF THE CONTRACT. CONTRACTOR SHALL GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. 7. ALL WORK SHALL BE IN FULL ACCORDANCE WITH 2012 INDIANA PLUMBING CODE (INTERNATIONAL PLUMBING CODE 2006), 2010 INDIANA ENERGY CODE (2007 ASHRAE 90.1), 2014 INDIANA FUEL GAS CODE (2012 INTERNATIONAL FUEL GAS CODE) AND ALL PERTINENT STATE, COUNTY, CITY CODES AND ORDINANCES WITH INDIANA AMENDMENTS. 8. PLUMBING CONTRACTOR SHALL ACCEPT SOLE AND COMPLETE RESPONSIBILITY FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. 9. PLUMBING CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL WATER, GAS, STORM AND SEWER UTILITY ROUGH-INS AND SHALL CONSULT WITH THE CIVIL PLANS AND WITH LOCAL UTILITY COMPANY(S) PROVIDING ALL MATERIALS AND LABOR AND PAYING ALL COSTS NOT BORNE BY THE LOCAL UTILITY COMPANY(S) FOR INSTALLATION OF SERVICES INCLUDING SECURING AND PAYING FOR ALL REQUIRED PERMITS. 10. PLUMBING CONTRACTOR SHALL ENSURE EMPLOYEES ARE MEETING AND DOCUMENTING ALL OSHA AND JOB SPECIFIC SAFETY REQUIREMENTS AS REQUIRED BY LAW AND BY CONTRACT. PERSONAL PROTECTIVE EQUIPMENT SHALL BE PROVIDED AND UTILIZED AS REQUIRED. MECHANICAL CONTRACTOR SHALL PAY ALL FINES LEVIED BY OSHA FOR FAILURE TO COMPLY WITH OSHA REQUIREMENTS. 11. ALL PLUMBING MATERIALS INSTALLED IN RETURN AIR PLENUMS SHALL BE INSTALLED OR COVERED WITH MATERIALS AS REQUIRED TO PROVIDE FLAME RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED INDEX OF NOT MORE THAN 50. PRIOR TO ROUGH-IN CONSULT WITH M.C. TO VERIFY ALL LOCATIONS OF RETURN AIR PLENUMS. 12. FURNISH AND INSTALL ACCESS PANELS FOR ALL CONCEALED EQUIPMENT, PIPING VALVES, CLEANOUTS, ETC. ACCESS PANELS SHALL BE OF SUFFICIENT SIZE TO PROVIDE ADEQUATE WORKING CLEARANCE AND ACCESS. 13. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED CUTTING AND PATCHING INCLUDING SAW CUTTING AND PATCHING OF EXISTING FLOORS AS REQUIRED TO ACCEPT NEW FLOORING. EQUIPMENT 1. PROVIDE EQUIPMENT AS SHOWN ON EQUIPMENT SCHEDULES AND PLAN NOTES. SUBSTITUTIONS TO LISTED EQUIPMENT SHALL BE AT RISK OF CONTRACTOR. SUBSTITUTIONS SHALL ONLY BE ALLOWED IF ITEMS ARE EQUAL IN ALL ASPECTS. 2. PROVIDE SUBMITTALS TO ELECTRICIAN AS REQUIRED FOR COORDINATION OF ALL REQUIRED ELECTRICAL POWER WIRING. INCLUDE WIRING DIAGRAMS AND CABLING REQUIREMENTS FOR REFERENCE. COORDINATE ALL INTERLOCKS AS NEEDED. PROVIDE SINGLE POINT CONNECTION KITS AS NEEDED. 3. INSTALL ALL EQUIPMENT IN FULL ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND CLEARANCE REQUIREMENTS. PROVIDE ALL REQUIRED MOUNTING OR HOUSEKEEPING PADS. G.C. SHALL PROVIDE LEVEL GRADE FOR EXTERIOR MOUNTED EQUIPMENT. P.C. SHALL PROVIDE ALL HOISTING AND RIGGING NEEDED TO SET ALL PLUMBING EQUIPMENT. 4. ALL EQUIPMENT SHALL BE INSTALLED AS NEEDED TO PREVENT OBJECTIONABLE NOISE AND/OR VIBRATION. P.C. SHALL PROVIDE VIBRATION PADS, SPRING ISOLATORS, ATTENUATORS AND ACCESSORIES AS NEEDED. 5. PROVIDE ALL BLOCKING, HANGERS, SHELVES, BRACKETS ETC. AS REQUIRED TO INSTALL ALL PLUMBING EQUIPMENT. 6. INSTALL WATER HEATERS IN ACCORDANCE WITH NFPA-70, AND THE NATIONAL ELECTRICAL CODE. PROVIDE BRASS DRAIN VALVE, 3/4" RELIEF VALVE AND COLD WATER DIP TUBE. INSTALL HEATERS PER MANUFACTURES INSTALLATION INSTRUCTIONS. PROVIDE SHUT-OFF VALVES FOR SERVICE WORK. 7. THERMOSTATS ON WATER HEATER SHALL NOT BE USED FOR LIMITING HOT WATER TEMPERATURES. P.C. SHALL PROVIDE MIXING VALVES FOR HOT WATER TO ALL FAUCETS ACCESSIBLE TO OCCUPANTS. MIXING VALVE SYSTEMS SHALL LIMIT WATER TEMPERATURE AT FAUCETS TO 110 DEG F. OR LESS. 8. PROVIDE SCHEDULE 40 PVC PIPING AND FITTINGS FOR ALL COMBUSTION AIR AND VENT PIPING IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS ON ALL DIRECT VENT WATER HEATERS OR BOILERS. FIXTURES 1. REFERENCE FIXTURE SCHEDULES ON PLANS AND PROVIDE ALL REQUIRED CARRIERS, BLOCKING, HANGERS, TAIL PIECES, TRAPS, RISERS, ESCUTCHEONS, GRIDS, PUTTY, GASKETS, CAULKING, ETC. AS REQUIRED TO INSTALL ALL PLUMBING FIXTURES. 2. REVIEW SUBMITTALS FOR ALL OWNER PROVIDED EQUIPMENT AND PROVIDE ANY REQUIRED ACCESSORIES AS NEEDED FOR A COMPLETE INSTALLATION. P.C. SHALL BE RESPONSIBLE TO RECEIVE AND INSTALL ALL OWNER PROVIDED FIXTURES. 3. FIXTURES DESIGNATED FOR HANDICAP ACCESSIBILITY SHALL COMPLY WITH ANSI A 117.1, LATEST EDITION, INCLUDING ADOPTED INDIANA AMENDMENTS. 4. PROVIDE ALL CODE REQUIRED BACKFLOW DEVICES FOR PROCESS HVAC EQUIPMENT AND FOR WATER SERVING ANY DRINKING OR FOOD PREPARATION FIXTURES. 5. PROVIDE BELLOWS TYPE WATER HAMMER ARRESTERS, STAINLESS STEEL CASHING AND BELLOWS, 250 PSI, INSTALL PER PDI STANDARD WH201. PIPING 1. ALL EXPOSED SUPPLY PIPES AND METAL TRIM IN CONNECTION WITH THE FIXTURES SHALL BE CHROME PLATED RED BRASS OR BRONZE, PROVIDE CHROME PLATED STOP VALVES IN ALL SUPPLIES TO ALL FIXTURES. PLASTIC STOPS OR TRIM SHALL NOT BE ACCEPTABLE. CAULK ALL FIXTURES WITH WATERPROOF SILICONE CAULK. TRAPS SHALL HAVE CLEANOUT PLUGS. INSTALL ONE PIECE CHROME ESCUTCHEON PLATE WITH SET SCREW AT WALL PENETRATIONS. 2. WASTE AND VENT PIPING MAINS SHALL BE PITCHED AT 1/8" PER FOOT. LATERAL BRANCHES SHALL BE PITCHED 1/4" PER FOOT TOWARD THE SANITARY SEWER MAIN. THEY SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH THE CURRENT INDIANA PLUMBING CODE AND TESTED PER AUTHORITY HAVING JURISDICTION. 3. VERIFY LOCATION, DEPTH AND SIZE OF SANITARY SEWER CONNECTION POINTS. CONNECT AS REQUIRED. OUTSIDE SEWER SHALL BE INSTALLED WITH MINIMUM OF 3'-0" COVER. COORDINATE CONNECTIONS WITH SITE CONTRACTOR AND LOCAL UTILITY 4. ALL OUTSIDE WATER PIPING SHALL BE COVERED WITH A MINIMUM OF 52". 5. ALL INTERIOR PIPING PENETRATIONS THROUGH WALLS, CEILINGS, ROOFS AND FLOORS SHALL BE SLEEVED AND SEALED. PROVIDE UL LISTED FIRE STOPPING WHERE REQUIRED. 6. ALL EXTERIOR UNDERGROUND PENETRATIONS OF BUILDING FOUNDATIONS OR SLAB FLOORS SHALL BE SLEEVED AND SEALED. PENETRATIONS BELOW GRADE INTO THE BUILDING SHALL BE DONE WITH MECHANICAL SEALS LIKE "LINK SEAL" OR EQUAL. 7. NO PLUMBING PIPING SHALL PASS DIRECTLY OVER ELECTRICAL PANELS OR DISTRIBUTION CABINETS. PRIOR TO ROUGH IN COORDINATE WITH E.C. 8. DIELECTRIC UNIONS SHALL BE USED TO CONNECT DISSIMILAR METALS OR METAL PIPING SHALL HAVE METAL CONNECTIONS ON EACH END THREADED TO MATCH THE ADJACENT PIPING. METAL COMPONENTS SHALL BE SEPARATED BY A NYLON INSULATOR TO PREVENT CURRENT FLOW BETWEEN DISSIMILAR METALS. UNIONS SHALL BE SUITABLE FOR THE SYSTEM OPERATING PRESSURES AND TEMPERATURE WELD TYPE: ASTM A-234. 9. PIPING SLEEVES; INTERIOR OR EXTERIOR ABOVE GRADE; GALVANIZED-STEEL-PIPE SLEEVES OR PVC-PIPE SLEEVES. VERIFY, WITH FIRE AUTHORITIES HAVING JURISDICTION, THAT PVC MATERIALS ARE ALLOWED FOR SLEEVES. BELOW GRADE; ALL; MECHANICAL GALVANIZED-STEEL PIPE SLEEVE SYSTEM LIKE LINK-SEAL. ALL SLEEVES SHALL BE FIRE STOPPED OR CAULKED. EXTERIOR SLEEVES SHALL PROVIDE WATER/AIR TIGHT PENETRATION SYSTEM. 10. PROVIDE HANGERS PER MSS AND IPC STANDARDS BASED ON PIPING TYPES AND SIZES. 11. PIPING MATERIALS UNLESS OTHERWISE NOTED ON THE PLANS SHALL BE AS FOLLOWS: GAS/AIR ABOVE GRADE, 2" AND SMALLER; BLACK STEEL SCHEDULE 40 TYPE E OR S PIPE GRADE B; ASTM A53 / A53M, A105 OR A120 WITH THREADED ENDS; FITTINGS SHALL BE MALLEABLE IRON THREADED FITTINGS ASTM B16.3 CLASS 150. 2-1/2" AND LARGER: BLACK STEEL SCHEDULE 40 TYPE E OR S PIPE GRADE B; ASTM A53 / A53M, A105 OR A120 WITH PLAIN ENDS. FITTINGS; WROUGHT STEEL WELDING FITTINGS TO ASTM A 234/A 234M FOR BUTT AND SOCKET WELDING. WATER COPPER TUBING (INSIDE BUILDING): ASTM B 88, TYPE 'L' HARD WATER TUBE DRAWN TEMPER. WITH CAST-COPPER SOLDER-JOINT FITTINGS: ANSI B16.18. OR WROUGHT-COPPER SOLDER JOINT FITTINGS: ANSI B16.22 SEWER/VENT BELOW GRADE: POLYVINYL CHLORIDE SEWER PIPE (PVC) SOLID: ASTM D1866, ASTM D 2665, ASTM D 2949, ASTM D 3034, CSA B181.2 CSA B182.1,.2,.4 SCHEDULE 40 SOLID DRAIN WASTE AND VENT PIPE. JOINTS SHALL BE PVC SOCKET WELDED FITTINGS DESIGNED TO FIT PIPING DIAMETERS ASTM D 2855 ASSEMBLED WITH PRIMER ASTM F 656 AND SOLVENT CEMENT ASTM D 2564, CSA B181.2. SEWER/VENT ABOVE GRADE: POLYVINYL CHLORIDE SEWER PIPE (PVC) CELLULAR CORE: ASTM F 891 DRAIN WASTE AND VENT PIPE. JOINTS SHALL BE PVC SOCKET WELDED FITTINGS DESIGNED TO FIT PIPING DIAMETERS ASTM D 2855 WITH PRIMER ASTM F 656 AND SOLVENT CEMENT ASTM D 2564, CSA B181.2. ALL PIPING IN RETURN AIR PLENUMS SHALL CONFORM TO REQUIREMENTS FOR PLENUM MATERIALS. VENTING POLYVINYL CHLORIDE DRAIN, WASTE AND VENT PIPE (PVC): ASTM D2665. INSULATED IN RETURN AIR PLENUMS. STORM POLYVINYL CHLORIDE SEWER PIPE (PVC): ASTM D2665 SOLID DRAIN WASTE AND VENT OR ASTM F 891 CELLULAR CORE SCHEDULE 40 WITH PVC SOCKET WELDED FITTINGS DESIGNED TO FIT PIPING DIAMETERS. INSULATED IN RETURN AIR PLENUMS. PLUMBING INSULATION 1. ALL PIPING INSULATION MATERIALS SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS (ON THE FLAME SPREAD TEST SCALE) AND SMOKE DEVELOPMENT OF 50 OR LESS (ON THE SMOKE TEST SCALE) OR AS DEFINED BY NFPA 255 STANDARD METHOD OF TESTING OF SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS, LOCAL CODES AND LOCAL AUTHORITIES HAVING JURISDICTION. ALL PVC PIPING LOCATED IN RETURN AIR PLENUM SPACES OR EXPOSED SHALL BE INSULATED. 2. INSULATION: INSTALL ALL INSULATION IN STRICT ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS IN A TIGHT AND NEAT MANOR. NO SAGGING, FRAYED OR TORN INSULATION WILL BE EXCEPTED. UNLESS OTHERWISE NOTED ON PLANS PIPING SHALL BE INSULATED AS FOLLOWS: ALL PLUMBING PIPING SHALL BE INSULATED TO THE FOLLOWING THICKNESS. a. HW, HWR: 1/2" THICKNESS FOR PIPE SIZES UPTO 1-1/2", 1" THICKNESS FOR GREATER THAN 1-1/2. b. CW: 1/2" THICKNESS FOR PIPE SIZES. c. STM: 1/2" THICKNESS FOR ALL PIPE SIZES. PRE-FORMED TYPE I, 850 DEG F MINERAL OR GLASS FIBERS BONDED WITH A THERMOSETTING RESIN AND HINGED WITH SELF SEALING LAP. COMPLY WITH ASTM C 547, TYPE I, GRADE A, WITH FACTORY-APPLIED ASJ. FLEXIBLE ELASTOMERIC CLOSED CELL OR EXPANDED RUBBER PIPE INSULATION WITH PRESSURE SENSITIVE ADHESIVE SYSTEM, ASTM C534, ASTM E84 CLASS A 300 DEG F. EXTERIOR/EXPOSED JACKETS: UV RESISTANT PVC PIPE JACKETS AND PREFORMED FITTING COVERS COMPLIANT WITH ASTM D257, D638, D790, D792, D1784, D3679, E84 AND E136. CHECK TEST AND START UP REQUIREMENTS 1. CLOSE OUT: PROVIDE MANUFACTURERS OPERATION AND MAINTENANCE MANUALS AND AS BUILT DRAWINGS. PROVIDE (1) TRAINING SESSION TO OWNER SELECTED PERSONNEL AS REQUESTED. 2. FILL SYSTEMS WITH FRESH WATER AND INSPECT ALL CONNECTIONS FOR LEAKAGE. REMOVE ALL PACKING AND PROTECTIVE SHIPPING MATERIALS. CLEAN ALL FIXTURES AND START-UP ALL WATER HEATERS, PUMPS, AND EQUIPMENT. VERIFY PROPER OPERATION. OPERATE ALL FAUCETS AND INSPECT STOPS, RISERS, TRAPS AND DRAINS. CORRECT ALL LEAKS, WATER HAMMER AND VIBRATIONS AS REQUIRED. P001 09/21/20 DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 1-1/23" 3/4" 3/4" 1/2" - 3" ITEM V (inch) WHW (inch) (inch) CW (inch)DESCRIPTION UR DF WC-2 2"1" - 1/2" 1/2" 1-1/2 LV-1 MS WC-1 TOTO #UT104E, VITREOUS CHINA, .05GPF, COMPACT WHITE URINAL WITH 3/4" TOP SPUD INLET, FURNISH W/ TOTO #THU3010 DRAIN COVER & TOTO #TEU1LA, 0.5GPF, ECO-POWER, HIGH-EFFICIENCY, AUTOMATIC FLUSH VALVE AND POLISHED CHROME. 3/4" - 2" HALSEY TAYLOR HAC8FSBL-Q BILEVEL BARRIER FREE ELECTRIC WATER COOLER, WITH FRONT PUSH BARS, PLATINUM VINYL FINSH 1-1/2 1-1/4 TOTO #CT1708EG, VITREOUS CHINA, 1.28 GPF, ELONGATED BOWL, WALL MOUNTED, CeFiONTECT CERAMIC GLAZE, WHITE TOILET, W/ 1-1/2" TOP SPUD INLET. FURNISH W/ TOTO #SC534, ELONGATED OPEN FRONT SEAT & TOTO #TET1LA, 1.28GPF, ECO- POWER, HIGH-EFFICIENCY, AUTOMATIC FLUSH VALVE, POLISHED CHROME W/ POLISHED CHROME SUPPLY NIPPLE, AND STOP VALVE. MOUNT AT ADA HEIGHT. 1" 3" FIAT MSB-2424 MOLDED STONE MOP SINK 24"x24", PLATE NO. 830-AA SERVICE FAUCET WITH VACUUM BREAKER, WALL BRACE, PAIL HOOK AND 3/4" HOSE THREAD SPOUT, PLATE NO. 832-AA-30 HOSE AND HOSE BRACKET , AND PLATE NO. 889-CC-24 MOP HANGER -SEE PLANS--FD-1 -SEE PLANS--TD-1 6" WIDE POLYMER TRENCH DRAIN SYSTEM WITH LOAD CLASS C DUCTILE IRON GRATE: ZURN #Z-806-HD-DGC PROVIDE OUTLETS, JOINT CLIPS, CONNECTORS AND END CAPS AS REQUIRED FOR COMPLETE SYSTEM. SEE DETAIL THIS SHEET. 1-1/2"1/2 1/2 SK-1 BREAK ROOM SINK: ELKAY LRAD3322604 DOUBLE SINK, STAINLESS STEEL, FURNISH WITH LK801AT08L2 FAUCET WITH 8' SWING SPOUT, SPRAYER AND HOSE, LK36 BASKET STRAINER, CP SUPPLIES & STOPS AND PROVIDE WITH BADGER 5 1/2HP DISPOSAL. --- 3/4 HB-1 PRIER C-138 HEAVY PATTERN HOSE BIB FAUCET W/ SATIN NICKEL FINISH --- 3/4 HB-2 PRIER C-634 HEAVY COMMERCIAL FREEZE PROOF HYDRANT W/ SATIN NICKEL FINISH AND KEYED ON-OFF --3/8" IMB OATEY ICE MAKER SUPPLY BOX W/ 3/8" SUPPLY VALVE AND COPPER LINE TO FIXTURE -2" JR SMITH 1080-06 WITH CLAMP AND SUMP.OD-1 JR SMITH 1010-06 WITH CLAMP AND SUMP.RD-1 -- - SEE PLANS -- - SEE PLANS 1-1/4 1-1/2 1-1/4 -SEE PLANS--FD-2 WATER HAMMER ARRESTER SCHEDULE PCN/ FIG. NO. P.D.I. SYMBOL RATING FIXTURE UNIT SIZE A B C D 5005 5010 5020 5030 5040 5050 A B C D E F 1-11 12-32 33-60 61-113 155-330 114-154 3/4 1 1 1 1 1 3 3-5/8 5-1/8 5-1/2 6-5/8 3-1/4 3-1/4 3-1/4 3-1/4 3-1/4 1-7/16 5-1/4 4-1/8 3-1/4 2-1/4 1-3/4 SK-2 3/4" 3/4" 2" MECHANICS SERVICE SINK: MEDEXSUPPLY COLUMBIA SINKS MODEL 54WSL SANI LAV HANDS FREE 2 PERSON WALL MOUNT STAINLESS STEEL SINK 40" LENGTH x 20" WIDTH x 0-8" DEPTH COMPLETE W/ KNEE VALVES AND FAUCETS. 1-1/2 TOTO #LT221 ATHERTON, RECTANGULAR, VITREOUS CHINA, UNDERCOUNTER, WHITE, 17"x13" SINK WITH OVERFLOW. FURNISH W/ TOTO #TEL115 SERIES, HELIX, ECO-POWER, ONE HOLE FAUCET, W/ TOTO #TLT10 MIXING VALVE, CONTROLLER, SPOUT KIT AND MOUNTING HARDWARE. FURNISH W/ POLISHED CHROME SUPPLY NIPPLES, AND STOP VALVES. PROVIDE TOTO #THU410 FOR GRANITE/MARBLE INSTALLATION IF APPLICABLE - --3/4" 3/4" EWH ELECTRIC WATER HEATER: BRADFORD WHITE LE250S3-3, 50 GALLON UPRIGHT, 18 GPH RECOVERY AT 100 DEG. @ 4500W AND 277V SK-3 CAFE SINK: ELKAY CROSSTOWN, SINGLE BOWL, UNDERMOUNT, MODEL ECTRU12179 STAINLESS STEEL W/ ELKAY MODEL LKD208513C 1.5 GPM 1/4 TURN SINGLE HOLE FAUCET W/ CP SUPPLIES & STOPS A NOTE: + Actual Channel length is 122 1/2 [3112] to allow for overlap. 1221 2" 120" 4" MIN. INVERT 4" 6" 4" MIN. ZURN Z806 POLYMER TRENCH DRAIN SYSTEM TYPICAL 10'-0" SECTION C SCALE: NONE TD-1 STANDARD TRENCH DRAIN TYPICAL SECTION SECTION VIEW SIDE VIEW PLAN VIEW SPECIFYING ENGINEER IS RESPONSIBLE FOR CONCRETE ENCASEMENT AND REINFORCING BASED UPON APPLICATION AND LOCAL CODES TOTO #CT1708EG, VITREOUS CHINA, 1.28 GPF, ELONGATED BOWL, WALL MOUNTED, CeFiONTECT CERAMIC GLAZE, WHITE TOILET, W/ 1-1/2" TOP SPUD INLET. FURNISH W/ TOTO #SC534, ELONGATED OPEN FRONT SEAT & TOTO #TET1LA, 1.28GPF, ECO- POWER, HIGH-EFFICIENCY, AUTOMATIC FLUSH VALVE, POLISHED CHROME W/ POLISHED CHROME SUPPLY NIPPLE, AND STOP VALVE. J.R. SMITH FIG #2005-B (SQUARE) J.R. SMITH FIG. #2005-A (ROUND) ZURN #Z541 12" HEAVY DUTY DRAIN, DURA COATED C.I. BODY, COMBINATION SEEPAGE PAN AND FLASHING CLAMP/ FRAME W/ ANTI-TILT SLOTTED GRATE AND SEDIMENT BUCKET FD-2 -SEE PLANS-- 3 8"x3" STAINLESS STEEL ANCHOR BOLTS FINISHED GRADE (SLOPE AWAY FROM CASTING) PRE-CAST CONCRETE AJUSTING RING OR FLANGE OF CASTING FRAME AND COVER (SEE MANHOLE CASTING TABLE FOR DETALS, TYP) 24" RCP RISERS AS REQUIRED 2'-0" MIN. TO 3'-0" MAX (FOR CONCRETE STRUCTURES 54" MIN. FROST LINE MIN. (1) 4" PRE-CAST CONCRETE ADJUSTING RINGS (TYP.) INFLUENT 6" ALL JOINTS SHALL BE SEALED BY AN O-RING GASKET PLUS 1 2" OR 3 4" CITY APPROVED FLEXIBLE BUTYL RESIN CONCRETE SEALANT (ROPE) CONFORMING TO ASHALL BE DEPENDENT ON SEASON OF INSTALLATION AND AS DIRECTED BY ENGINEER. CONTRACTOR SHALL GROUT ALL INTERNAL MANHOLE JOINTS WITH NON-SHRINK GROUT KENT SEAL JOINT DETAIL 12" MIN. TO UNDISTURBED EARTH "CLEAN" SAND BACKFILL TO INFLUENT AND EFFLUENT PIPES KEY NOTES: A. DISTANCE MAY BE INCREASED BASED ON THE CONSTITUENTS OF THE WASTEWATER FLOWS. CONSULT CITY PRIOR TO SHOP DRAWING SUBMITTAL. B. MINIMUM LIQUID DEPTH MAY BE REDUCED ON A CASE-BY-CASE BASIS AS APPROVED BY THE CITY OF CARMEL. NOTES: 1. INTERCEPTOR/SEPERATOR SHALL CONFORM TO ASTM C478 UTILIZING 4000 PSI CONCRETE 2. EXTERIOR INSTALLATION MUST BE CONCRETE OR CAST IRON. STEEL INTERCEPTORS/SEPERATORS SHALL ONLY BE INSTALLED INSIDE A BUILDING 3. CONTRACTOR MAY SUPPLY INTERCEPTORS/SEPERATORS AS MANUFACTURED BY JR SMITH CO. SERIES 8500 IF INTERIOR INSTALLATION UTILIZED 4. SIZE AS PER CODE OR LOCAL REQUIREMENTS. THE SIZING METHOD FOR ALL STRUCTURES MUST BE APPROVED BY CTRWD. 5. THE BAFFLE ORIENTATION WILL BE DEPENDANT UPON THE APPLICATION. 6. SHOP DRAWINGS MUST BE SUBMITTED TO CTRWD FOR REVIEW AND APPROVAL. 7. TOP OF CASTING SHALL EXTEND .2Ø FEET MIN. ABOVE FINISHED GRADE UNLESS APPROVED BY THE CITY. CASTING MUST NOT BE WITHIN 1'-0" HORIZONTAL DISTANCE OF ANY PAVED OR CONCRETE SURFACE. OUTSIDE DIAMETER + 1'-0" FOR PRE-CAST 12" MIN. CRUSHED #8 STONE MAT FOR LEVELING AND SUPPORT #2 STONE AS REQUIRED BY CTRWD FOR UNSTABLE SOIL CONDITIONS - DEPTH TO STABLE GROUND PER CITY 6" REINFORCED CONCRETE NO CORE WILL BE PERMITTED WITHIN 6" OD INTERNAL OR EXTERNAL JOINTS CORE DRILLED OPENING WITH RESILIENT CONNECTOR OR CAST-IN-PLACE A-LOCK OR CITY APPROVED EQUAL (TYP. ALL PIPE PENETRATIONS). EFFLUENT 6" 10" MIN. 12" MAX. 1' TYP. 1'-0" MIN. 2'-0" DIA. (TYP.) 6" OPENING 8" (SEE NOTE A) LIQUID DEPTH 30" MINS. TO 78" MAX (SEE NOTE B) 1 4" STAINLESS STEEL SUPPORT LOCATION 18" OR MORE ABOVE THE 100-YEAR FLOOD ELEVATION OF ALL WATERWAYS LESS THAN 18" ABOVE THE 100-YEAR FLOOD ELEVATION OF ALL WATERWAYS OWNERSHIP PRIVATE LID LETTERING "SANITARY SEWER" EAST JORDAN 1Ø22ZIGS OR NEENAH R-1772 MANHOLE CASTING TABLE COVERMODEL EAST JORDAN 1Ø221ZIPT HEAVY DUTY SOLID HEAVY DUTY SOLID 20" 6" (SEE NOTE A) B OIL/ SAND SEPARATOR DETAIL 1,000 GALLON P002 A PARTIAL SANITARY ISOMETRIC PLUMBING FIXTURE SCHEDULE (BID PURPOSE ONLY, PRIOR TO ORDER APPROVED SUBMITTAL IS REQUIRED) SAN SAN SAN SAN SAN 3" WC-1 WC-1 3" UR SA N SA N FD-1 FD-1 2" 2" WC-2 UR WC-2 LV-1 LV-1 LV-1 LV-1 DF FD-1 MS SAN SAN CO 4" 4" UP TO 2ND FLOOR TO VEHICLE DELIVERY CENTER CO SA N S A N TO AREA 'B' 6" SA N 6" SEE CIVIL PLANS FOR CONTINUATION 4" S AN SAN SAN SAN SAN SA N CONTINUE VENT LINE TO SERVE REMAINDER OF FIXTURES FIELD ROUTE VENT TO 3" ROOF TERMINAL 1-1/2" V1-1/2" V2" V2" V2" V2" V1-1/2" V1-1/2" V1-1/2" V1-1/2" VSCALE: NONE SCALE: NONE 3" 3" 3" 2" 4" INSTANTANEOUS WATER HEATER. EEMAX EX4277T ML. 4.1 KW.IWH 1/2" 1/2" - - S AN SAN SAN SAN SAN 4" 09/21/20 DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 STEEL PIPE FLOOR SLEEVE RISER CLAMP BOLT SLAB FIRE CAULKING OAKUM PACKING (OMIT IF RUBBER SEAL IS USED.) C PIPE SLEEVE FLOOR PENETRATION SINGLE PIPE HANGER DETAILA INSULATED PLUMBING PIPES. RIGID MOLDED FIBERGLASS INSULATION METAL PROTECTION SHIELDS HANGING RODS 12" MIN. NUTS & LOCK WASHERS SUPPORT CHAIR BOLTED TO CHANNEL STEEL CHANNEL ADEQUATE TO CARRY LOAD GENERAL NOTES: 1) PROTECTION SADDLES SHALL BE COPPER CLAD IF COPPER TUBE IS USED. 2) PROVIDE INTERMEDIATE HANGING ROD SUPPORT WHERE NUMBER OF PIPES EXCEED FIVE(5). TRAPEZE HANGER DETAILB ADD PIPE SLEEVE THAT HAS AN INSIDE DIAMETER, 14"± LARGER THAN OUTSIDE DIA. PIPE HANGER ROD CLIP CONNECTION 3/8" ROD ATTACHED TO TOP OF STRUCTURAL ROOF FRAMING MEMBER WITH BEAM CLAMP. "L" 6'-0"MAX. ADD FRAMING CHANNEL OR ANGLE WHEN "L" IS GREATER THAN MAX. LENGTH. CLEVIS PIPE HANGER SAME AS OPPOSITE SIDE M.J. X FL. ADAPTER 3/4" ALL THR. ROD WASHER TIE BOLT "J" BOLT OR HEX NUT & THRUST BLOCK (PER NFPA 24) 6" U.G. PIPING D.I.P. RISER TO RISER BY DESIGN AND BUILD FIRE LINE DETAILD FIRE SUPPRESION CONTRACTOR E BACKFLOW PREVENTOR DETAIL OVERFLOW DRAIN J.R. SMITH MODEL 1080Y ROOF OVERFLOW DRAIN NO-HUB WITH DUCO CAST IRON BODY / FLASHING CLAMP AND POLYETHYLENE DOME H ROOF DRAIN DETAIL ROOF DRAIN J.R. SMITH MODEL 1010Y ROOF DRAIN NO-HUB WITH DUCO CAST IRON BODY / FLASHING CLAMP AND POLYETHYLENE DOME APPX. 24" O.C. I WASH BAY PSI WASHER STATION 3/4" HW (FROM OVERHEAD HOT WATER) 3/4" CW (FROM OVERHEAD COLD WATER) 3/4" HOSE BIBB SPIGOT 3/4" BALL VALVE (H & C) MOUNT AT +36" AFF FIN. FLOOR TEMPERATURE GAGE 18" 2" TO DOMESTIC SYSTEM REDUCED PRESSURE ZONE BACKFLOW PREVENTER: WATTS MODEL 009M2QTS CAST BRONZE CONSTRUCTION WITH QUARTER TURN FULL-PORT BALLVALVES (VERIFY W/ LOCAL UTILITY CO.) WATER METER W/ REMOTE READ 30""RISING STEM GATE VALVES FROM CITY WATER MAIN 2" ROUND CHIMNEY TOP METALBESTOS FLUE RECOMMENDATIONS MANUFACTURER'S INSTALL PER NOTE FLASHING ROOF STORM COLLAR METAL ROOF AIR SPACE AROUND FLUE METALBESTOS FLUE, SEAL WITH FLUE DETAILK LISTED HIGH TEMPERATURE SEALANT. CONNECT TO APPLIANCE WITH B-VENT CONNECTOR PIPING SLOPE AT MINIMUM 1/4" PER FOOT GAS PIPING MIRO PIPE HANGER MODEL #1.5 J ROOF GAS PIPING SUPPORT ROOF DECK P003 F POINT OF USE WATER HEATER DETAIL FACTORY SUPPLIED HEAT TRAP PIPE NIPPLE CASH ACME TMV C INCOMING COLD WATER (CONCEALED IN WALL) INSTANTANEOUS WATER HEATER WALL MOUNTED SEE SCHEDULE Finished Floor WARNING: THIS DRAWING SHOWS SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES; CHECK WITH LOCAL CODES AND ORDINANCES FOR ADDITIONAL REQUIREMENTS. 3. SERVICE VALVES ARE SHOWN FOR SERVICING UNIT. HOWEVER, LOCAL 2. THE TEMPERATURE AND PRESSURE RELIEF VALVE SETTING SHALL NOT EXCEED PRESSURE RATING OF ANY COMPONENT IN THE SYSTEM. 1. PREFERRED PIPING DIAGRAM. NOTES: CODES SHALL GOVERN THE USAGE OF ANY COMPONENT IN THE SYSTEM. OUTGOING HOT WATER (CONCEALED IN WALL) 3 4" SHUT OFF TYPICAL DIGITAL LIGHT PWRD THERMOMETER SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE HW CW EWH VALVE TANK DRAIN 2" METAL DRAIN PAN TERMINATE RELIEF OVER DRAIN PAN 3/4" INSULATED HW SUPPLY G WATER HEATER DETAIL TMV THERMOSTATIC MIXING VALVE COLD WATER ASME T&P EXPANSION TANK FACTORY SUPPLIED HEAT TRAP NIPPLES OR 27" HEAT TRAP 110 DEG. WATER TEMPERATURE GAGE EXP-1 SIMILAR TO AO SMITH PMC-2 INSULPAD-310854 2" HEATER PAD FLOOR DRAIN SCALE: NONE 09/21/20 KEY PLAN AB N 3 5 10 13 15 16 17 C E H J M O S 2 1 9 6 D B A F 18 T G L N 7 4 11 12 14 K 28 R P WC-1 WC-1 WC-2 LV-1 LV-1LV-1 LV-1 DF MS UR UR FD-1 FD-1FD-1 TD-1TD-1 SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SANSAN SAN SAN CO 6"Ø 6"Ø 4"Ø 4"Ø CO 3"Ø 4"Ø 4"Ø 2"Ø WC-2 4"Ø 4"Ø IE= 737.0SAN CO SANSEE P101 FOR CONTINUATION SEE CIVIL PLANS FOR CONTINUATION 4"Ø Up2"Ø Up FFE= 743.0SD8 SDSAN SANSAN SAN CO SAN SAN SAN SANSAN SANROUTE 4" SANITARY LINE UP TO SERVE FIXTURES ON SECOND FLOOR. SEE SHEET P201 FOR CONTINUATION. ROUTE 2" SANITARY LINE UP TO SERVE FIXTURES ON SECOND FLOOR. SEE SHEET P201 FOR CONTINUATION. SEE CIVIL PLANS FOR CONTINUATION OF STORM DRAIN. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 1 SCALE: 1/8" = 1'-0" FIRST FLOOR PLUMBING WASTE - AREA 'A' P100 1 2 2 3 3 09/21/20 KEY PLAN AB N 18 CO FD-2 FD-3FD-3 TD-1 TD-1 TD-1 GI SAN SAN SAN SAN SAN SAN SAN SAN SANGL GL GL GL GL GL GL GL GL GL GL GL GL GL SAN SAN SAN GL GL GL GL GL GL GLGL GL GL GL GL GL GL GLGL GL GL GL GLGL GL GL GL GL GL GL GLGL GL GL GL GLGL GL GL GL GLGL GL GL GL GL GL GL GL GL COCO CO CO GL GL GL GL GL GL GL GL GL GL FD-2 GL GL FD-2 CO CO 6"Ø 6"Ø 4"Ø 6"Ø 4"Ø4"Ø 3"Ø3"Ø 3"Ø 4"Ø I.E. = 738.5 SAN SAN SAN SAN 4"Ø 4"Ø Up CO SD 8" SD SD6" SDFD-2 SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN GL SAN3"Ø CO CO SAN SAN SAN SAN SAN SAN SAN SAN SAN CO CO FFE= 743.0 DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 1 SCALE: 1/8" = 1'-0" FIRST FLOOR PLUMBING WASTE - AREA 'B' P101 SEE SHEET P100 FOR SANITARY CONTINUATION. SEE CIVIL PLANS FOR CONTINUATION OF STORM DRAIN. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 1 2 2 2 09/21/20 KEY PLAN AB N 3 5 10 13 15 16 17 C E H J M O S 2 1 9 6 D B A F 18 T G L N 7 4 11 12 14 K 28 R P WC-1 WC-1 WC-2 LV-1 LV-1LV-1 LV-1 DF MS UR UR EWH CW CWCWCW CW CW CW CWCW HWS HWS HWSHWS HWS CW WC-2 2" CW Up CW1" HW3/4" HW Up 2" CW 2" CW CW CW CW2" CW 2" CW 3/4" HW 1" CWDATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 1 SCALE: 1/8" = 1'-0" FIRST FLOOR WATER PLAN - AREA 'A' P102 ROUTE 2" CW AND 3/4" HW UP TO SECOND FLOOR CEILING. SEE SHEET P201 FOR CONTINUATION. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 1 09/21/20 KEY PLAN AB C N 1718 RTU-7 7.5 TON IR-2 IR-2 IR-3 IR-3 IR-3 IR-3 IR-1 CW2" CWUp 2" CW SEE P200 FOR CONTINUATIONCW CW CW CW CW CW 3/4"CW HB-1 3/4"CW HB-1 3/4"CW HB-1 3/4"CW HB-1 CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW 3/4"CW HB-1 CW CW CW CW CWCW CW CW CW CW CW CW 3/4"CW HB-1 3/4"CW HB-1 CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CWCW CW CW CW CW CW CWGAS GAS GAS GAS GAS GASSEE P200 FOR CONTINUATIONGAS GAS GAS GAS GAS GAS GASGASGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGAS GAS GAS GAS GAS SEE P301 FOR CONTINUATION GAS GAS GAS GASGAS GAS GAS GAS GASSEE P200 FOR CONTINUATION SEE P301 FOR CONTINUATION 1-1/4" GAS UP 1-1/4" GAS CW CW CW CWCW FP6" FP2" CW 2" CW2" CW 1" CW3/4"CW HB-1 2" CW3/4" GAS 1" GAS GAS GAS 3/4" GAS 3/4" GAS3/4" GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS 3/4" GAS1" GASCW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CWHB-2 3/4" CW CW CW CW RPZ DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 1 SCALE: 1/8" = 1'-0" FIRST FLOOR WATER PLAN - AREA 'B' P103 2" DOMESTIC WATER SERVICE. SEE CIVIL PLANS FOR CONTINUATION. 6" FIRE PROTECTION SERVICE. SEE CIVIL PLANS FOR CONTINUATION. SEE SHEET P201 FOR CW LINE CONTINUATION. PROVIDE AND INSTALL 2,000 MBH, 2 PSIG GAS SERVICE. PROVIDE 1-1/4" GAS LINE FROM METER TO BUILDING. a. (7) RTU'S 1,130 MBH b. (7) IR HEATERS 710 MBH c. (1) UNIT HEATER 30 MBH TOTAL 1,870 MBH ROUTE 6" FIRE PROTECTION LINE UP THROUGH FLOOR AND SET FLANGE. SEE DETAIL ON SHEET P003 FOR MORE INFORMATION. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 2 1 2 3 3 4 4 5 5 09/21/20 KEY PLAN B C D N SK-1 WC-1WC-2 UR UR SK-4 CWCW CW CW CW 2" CW GAS GAS GAS GASGAS GAS GAS GAS GAS 2" CW IWH HWS 1/2" HW 1-1/4" GAS1" GAS 6" SD SK-1 WC-1WC-2 UR UR FD-1 SK-4 SAN SANSANSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD8" SD 6" SDFD-1SANSAN CO 4" DN2"4" SD 6" SD DWN 6" SD 8" SD DWN DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 2 SCALE: 1/8" = 1'-0" SECOND FLOOR WATER PLAN - AREA 'D' 1 SCALE: 1/8" = 1'-0" SECOND FLOOR WASTE PLAN - AREA 'D'P200 ROUTE CW AND GAS LINES DOWN TO SERVICE RECEPTION CEILING ELEVATION AND SEE SHEET P103 FOR CONTINUATION. ROUTE 1-1/4" GAS LINE DOWN TO FIRST FLOOR. SEE SHEET P103 FOR CONTINUATION. ROUTE CW AND GAS LINES THROUGH WALL TO SERVICE DEPARTMENT. SEE SHEET P103 FOR CONTINUATION. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 1 2 2 3 3 09/21/20 KEY PLAN C D N H J M O S T G L N 11 12 14 7 2 SK-1 SK-2 LV-1 LV-1 WC-1 WC-1 MS CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CWCWCW CWCWCW CW CW CW CW HWSHWSHWS HWSHWSHWS HWS HWS HWS 3/4" HW DWN FOR CONTINUATION 2" CW DWN CW2" CW 2" CW 2" CW1/2" HW 1/2" CW H J M O S T G L N 11 12 14 7 2 SK-1 SK-2 LV-1 LV-1 WC-1 WC-1 MS SANSAN FD-1 FD-1 FD-1 2"Ø DN SAN SAN SAN SD SD SD SD SD SD SD SD SD SDSD SD SD SD SD SD 6" SD 8" SDCONDENSATE DRAIN 4"Ø DN 8" SD DWN DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 2 SCALE: 1/8" = 1'-0" SECOND FLOOR WATER PLAN - AREA 'C' P201 1 SCALE: 1/8" = 1'-0" SECOND FLOOR WASTE PLAN - AREA 'C' ROUTE SANITARY LINE DOWN TO BELOW FIRST FLOOR SLAB. SEE SHEET P100 FOR CONTINUATION. ROUTE CW LINE DOWN TO SERVICE RECEPTION CEILING ELEVATION AND SEE SHEET P103 FOR CONTINUATION. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 1 1 2 2 09/21/20 KEY PLAN AB N RD-1OD-1 RD-1OD-1 6"6" 6"6"DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 P300 1 SCALE: 1/8" = 1'-0" ROOF PLAN - AREA 'A' ROUTE STORM DRAINS DOWN TO SECOND FLOOR CEILING. SEE SHEET P201 FOR CONTINUATION. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 1 1 09/21/20 KEY PLAN AB N RTU-1 RTU-2 RTU-3 RTU-4 RTU-5 20 TON 5 TON 5 TON 8.5 TON 5 TON RTU-7 7.5 TON RTU-6 5 TON GAS GAS GAS GAS GAS GAS GASGAS GAS GAS GAS GASGAS GASGAS GAS GAS GAS GAS GAS GAS GAS 3/4" GAS 3/4" GAS 3/4" GAS 3/4" GAS 3/4" GAS 3/4" GAS1" GAS3/4" GASRD-1 OD-1 RD-1 OD-1 RD-1 OD-1 RD-1 OD-1 3/4" GAS 1" GAS DWNGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS 3/4" GAS DWN 6" 6" 6" 6" 4" 4" 4" 4"GAS GAS GASDATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 P301 1 SCALE: 1/8" = 1'-0" ROOF PLAN - AREA 'B' ROUTE 1" GAS DOWN TO CEILING OF SERVICE RECEPTION. SEE SHEET P103 FOR CONTINUATION. ROUTE 3/4" GAS DOWN TO CEILING OF SERVICE DEPARTMENT. SEE SHEET P103 FOR CONTINUATION. ROUTE STORM DRAINS DOWN TO SECOND FLOOR CEILING. SEE SHEET P200 FOR CONTINUATION. KEY NOTES: 1. REFERENCE SHEET P001 FOR LEGENDS, ABBREVIATIONS, SPECIFICATIONS AND NOTES. 2. REFERENCE SHEET P002 FOR SCHEDULES AND DETAILS. 3. REFERENCE SHEET P003 FOR DETAILS. GENERAL NOTES: 1 1 2 2 3 3 3 3 3 09/21/20