Loading...
HomeMy WebLinkAboutP001DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR EDOOG.RDIVAD PROFES SIONA L E N G INEER D E NADIIN A GER RTSIE STATE OF No. 10200395 ROOF JACK, MATCH ROOF COLOR ROOF TOP UNIT REVOLUTIONS PER MINUTE SUPPLY AIR FAN RJ RPM RTU SAF STATIC PRESSURESP TCC TSP TOTAL STATIC PRESSURE WALL CAPWC WALK IN COOLERWIC WALK IN FREEZERWIF ET EXPANSION TANK ELECTRIC WATER COOLEREWC TMV THERMOSTATIC MIXING VALVE AFF ABOVE FINISH FLOOR URINAL SK SINK MOP SINK WATER CLOSET WATER HEATER CO CLEAN OUT PLUMBING CONTRACTOR STORM DRAIN VENT THROUGH ROOF SANITARY SEWER ST STORAGE TANK SD SAN CW COLD WATER DOMESTIC PC PRV PSI PRESSURE RELEIF VALVE POUNDS PER SQUARE INCH MS LAV LAVATORY HWS HWR HOT WATER RETURN DOMESTIC HOT WATER SUPPLY DOMESTIC GPM GALLONS PER MINUTE WH GC GENERAL CONTRACTOR VTR UR WC FOOTFT INCHIN LEAVING AIR TEMPERATURE LINEAR SLOT DIFFUSER MANUAL LAT IR MAN LS 1000 BTUH MECHANICAL CONTRACTOR MOTOR CONTROL CENTER MBH MC MCC MFR MANUFACTURER PRESSURE DROP POOL DEHUMIDIFICATION UNIT PACKAGE TERMINAL AIR CONDITIONER POUNDS PER SQUARE INCH PRESSURE RELEIF VALVE PD PDU PTAC PSI PRV INFRA-RED AIR HANDLING UNIT ACCU AHU BOTTOM OF DUCT BACKDRAFT DAMPER BOD BDD COMBUSTION AIR CUBIC FEET PER MINUTE CA CFM AIR COOLED CONDENSING UNIT ENTERING AIR WET BULB ENTERING AIR DRY BULB DIAMETER EAWB EADB Ø DRY BULBDB ELECTRICAL CONTRACTOREC ELECTRIC WALL HEATER EXHAUST FANEF EWH HOOD EXTERNAL STATIC PRESSURE ELECTRIC REHEAT COIL H ESP ERC E EXHAUST GRILLE OR REGISTER FURNACE FCU F FIRE DAMPER OR FLOOR DRAIN FIRE AND SMOKE DAMPER FD FD/SD FEET PER MINUTEFPM FAN COIL UNIT ABBREVIATIONS UNLESS OTHERWISE NOTEDUON TEMPERATURE CONTROL CONTRACTOR REDUCED PRESSURE ZONED BACKFLOWRPZB FSK FOIL SCRIM VAPOR BARRIER RETURN AIRRA SUPPLY AIRSA EXHAUST AIR OR EACHEA OUTSIDE AIROA VARIABLE AIR VOLUME BOXVAV FAN POWERED VAV BOXFPVAV DEGREES FARENHEITDEG F CND HW HWR SD SAN RD PIPING LINETYPES CONDENSATE DRAIN HEATING WATER SUPPLY DOMESTIC HEATING WATER RETURN DOMESTIC STORM DRAIN SANITARY SEWER COLD WATER DOMESTIC ROOF DRAIN SYMBOLS COMPRESSED AIR CW CA GREASE/OIL/DIRT DRAIN LINE GL GASGAS NATURAL OR PROPANE ANCHOR / HANGER BALL VALVE BUTTERFLY VALVE EXPANSION JOINT GATE VALVE GLOBE VALVE GAS METER PIPE GUIDE "P" TRAP TEST PLUG PLUG VALVE WATER METER UNION THERMOMETER "Y" STRAINER PRESSURE GAUGE BALANCING VALVE CHECK, SWING VALVE FLEXIBLE PUMP CONNECTION FLANGED CONNECTION DROP PITCH DOWN IN DIRECTION OF ARROW RUN OUT OFF BOTTOM OF MAIN RUN OUT OFF TOP OF MAIN RISER TEE OFF SIDE OF MAIN PIPING SYMBOLS M GM P PENDANT STYLE FIRE SUPPRESSION HEAD PLUMBING SPECIFICATIONS GENERAL 1. BID INSTRUCTIONS: CONTRACTORS SHALL PROVIDE BASE BID IN STRICT ACCORDANCE WITH DESIGN BASIS EQUIPMENT AND MATERIALS. PROJECT DOES ENCOURAGE COMPETITIVE PRICING AND ALLOWS FOR SUBSTITUTIONS OF EQUIPMENT AND MATERIALS AS ALTERNATE DEDUCTS TO BASIS OF DESIGN BIDS. LIST ALL SUBSTITUTIONS ALONG WITH DEDUCTS OFFERED ON BID. ENGINEER RESERVES THE RIGHT TO REJECT SUBSTITUTIONS FOUND NOT TO BE EQUAL TO ITEMS LISTED IN DESIGN BASIS. 2. PRIOR TO PROCUREMENT CONTRACTOR SHALL SUBMIT TO ARCHITECT FULL SUBMITTALS FOR ALL ENERGY CONSUMING OR PRODUCING ITEMS AND FOR ALL PLUMBING FIXTURES, VALVES, DRAINS, CLEAN OUTS, PIPING, PIPING ACCESSORIES, INSULATION AND PIPING HANGERS. SUBMITTALS SHALL BE DELINEATED WITH TAGS INDICATED ON PRINTS, CONTRACTORS NAME, PROJECT NAME. CLEARLY INDICATE ALL MODEL NUMBERS AND ALL ACCESSORIES AND OPTIONS BEING PROVIDED. SUBMISSIONS SHALL BE IN PDF FORMAT.ENGINEER RESERVES THE RIGHT TO REJECT ANY SUBSTITUTE ITEM. 3. CONTRACTOR SHALL BE RESPONSIBLE TO VISIT THE SITE TO EXAMINE ALL CONDITIONS THAT MAY IN ANY WAY AFFECT THE EXECUTION OF HIS WORK. HE SHALL ALSO EXAMINE THE DRAWINGS AND SPECIFICATIONS FOR OTHER BRANCHES OF WORK MAKING REFERENCE TO THEM FOR DETAILS OF EXISTING BUILDING CONDITIONS. NO EXTRAS WILL BE ALLOWED FOR FAILURE TO INCLUDE ALL REQUIRED WORK IN THE BID. CONTRACTOR SHALL GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. 4. THE DRAWINGS IN THIS SECTION ARE DIAGRAMMATIC AND ARE NOT INTENDED TO DEFINE EXACT QUANTITIES, LOCATIONS OR CODIFIED REQUIREMENTS. DRAWINGS SHOW GENERAL INTENT OF SYSTEMS. P.C. SHALL PROVIDE AND PAY FOR ALL REQUIRED PERMITS. 5. UPON COMPLETION OF THE PLUMBING INSTALLATION, DEMONSTRATE TO THE ENGINEER AND/OR THE OWNER'S SATISFACTION THAT THE SYSTEMS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS AND APPLICABLE CODES. DEMONSTRATE THE DYNAMIC OPERATION OF EACH SYSTEM. VERIFY PROPER OPERATION OF EQUIPMENT, FILTERS ARE CLEAN AND COMPONENTS OF THE SYSTEM ARE INSTALLED AND ADJUSTED IN FULL ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. 6. PLUMBING WORK SHALL BE COMPLETE IN EVERY DETAIL AND ALL MISCELLANEOUS ITEMS OF MATERIAL AND LABOR NECESSARY TO COMPLETE THE WORK DESCRIBED, SHOWN OR REASONABLY IMPLIED ON DRAWINGS OR SPECIFICATIONS SHALL BE INCLUDED IN THE CONTRACT. CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS TO THE WORK WHERE REQUIRED, WHEN SUCH ADJUSTMENTS ARE NECESSARY FOR PROPER OPERATION AND WITHIN THE INTENT OF THE CONTRACT. CONTRACTOR SHALL GUARANTEE ALL LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. 7. ALL WORK SHALL BE IN FULL ACCORDANCE WITH 2012 INDIANA PLUMBING CODE (INTERNATIONAL PLUMBING CODE 2006), 2010 INDIANA ENERGY CODE (2007 ASHRAE 90.1), 2014 INDIANA FUEL GAS CODE (2012 INTERNATIONAL FUEL GAS CODE) AND ALL PERTINENT STATE, COUNTY, CITY CODES AND ORDINANCES WITH INDIANA AMENDMENTS. 8. PLUMBING CONTRACTOR SHALL ACCEPT SOLE AND COMPLETE RESPONSIBILITY FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. 9. PLUMBING CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL WATER, GAS, STORM AND SEWER UTILITY ROUGH-INS AND SHALL CONSULT WITH THE CIVIL PLANS AND WITH LOCAL UTILITY COMPANY(S) PROVIDING ALL MATERIALS AND LABOR AND PAYING ALL COSTS NOT BORNE BY THE LOCAL UTILITY COMPANY(S) FOR INSTALLATION OF SERVICES INCLUDING SECURING AND PAYING FOR ALL REQUIRED PERMITS. 10. PLUMBING CONTRACTOR SHALL ENSURE EMPLOYEES ARE MEETING AND DOCUMENTING ALL OSHA AND JOB SPECIFIC SAFETY REQUIREMENTS AS REQUIRED BY LAW AND BY CONTRACT. PERSONAL PROTECTIVE EQUIPMENT SHALL BE PROVIDED AND UTILIZED AS REQUIRED. MECHANICAL CONTRACTOR SHALL PAY ALL FINES LEVIED BY OSHA FOR FAILURE TO COMPLY WITH OSHA REQUIREMENTS. 11. ALL PLUMBING MATERIALS INSTALLED IN RETURN AIR PLENUMS SHALL BE INSTALLED OR COVERED WITH MATERIALS AS REQUIRED TO PROVIDE FLAME RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED INDEX OF NOT MORE THAN 50. PRIOR TO ROUGH-IN CONSULT WITH M.C. TO VERIFY ALL LOCATIONS OF RETURN AIR PLENUMS. 12. FURNISH AND INSTALL ACCESS PANELS FOR ALL CONCEALED EQUIPMENT, PIPING VALVES, CLEANOUTS, ETC. ACCESS PANELS SHALL BE OF SUFFICIENT SIZE TO PROVIDE ADEQUATE WORKING CLEARANCE AND ACCESS. 13. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED CUTTING AND PATCHING INCLUDING SAW CUTTING AND PATCHING OF EXISTING FLOORS AS REQUIRED TO ACCEPT NEW FLOORING. EQUIPMENT 1. PROVIDE EQUIPMENT AS SHOWN ON EQUIPMENT SCHEDULES AND PLAN NOTES. SUBSTITUTIONS TO LISTED EQUIPMENT SHALL BE AT RISK OF CONTRACTOR. SUBSTITUTIONS SHALL ONLY BE ALLOWED IF ITEMS ARE EQUAL IN ALL ASPECTS. 2. PROVIDE SUBMITTALS TO ELECTRICIAN AS REQUIRED FOR COORDINATION OF ALL REQUIRED ELECTRICAL POWER WIRING. INCLUDE WIRING DIAGRAMS AND CABLING REQUIREMENTS FOR REFERENCE. COORDINATE ALL INTERLOCKS AS NEEDED. PROVIDE SINGLE POINT CONNECTION KITS AS NEEDED. 3. INSTALL ALL EQUIPMENT IN FULL ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND CLEARANCE REQUIREMENTS. PROVIDE ALL REQUIRED MOUNTING OR HOUSEKEEPING PADS. G.C. SHALL PROVIDE LEVEL GRADE FOR EXTERIOR MOUNTED EQUIPMENT. P.C. SHALL PROVIDE ALL HOISTING AND RIGGING NEEDED TO SET ALL PLUMBING EQUIPMENT. 4. ALL EQUIPMENT SHALL BE INSTALLED AS NEEDED TO PREVENT OBJECTIONABLE NOISE AND/OR VIBRATION. P.C. SHALL PROVIDE VIBRATION PADS, SPRING ISOLATORS, ATTENUATORS AND ACCESSORIES AS NEEDED. 5. PROVIDE ALL BLOCKING, HANGERS, SHELVES, BRACKETS ETC. AS REQUIRED TO INSTALL ALL PLUMBING EQUIPMENT. 6. INSTALL WATER HEATERS IN ACCORDANCE WITH NFPA-70, AND THE NATIONAL ELECTRICAL CODE. PROVIDE BRASS DRAIN VALVE, 3/4" RELIEF VALVE AND COLD WATER DIP TUBE. INSTALL HEATERS PER MANUFACTURES INSTALLATION INSTRUCTIONS. PROVIDE SHUT-OFF VALVES FOR SERVICE WORK. 7. THERMOSTATS ON WATER HEATER SHALL NOT BE USED FOR LIMITING HOT WATER TEMPERATURES. P.C. SHALL PROVIDE MIXING VALVES FOR HOT WATER TO ALL FAUCETS ACCESSIBLE TO OCCUPANTS. MIXING VALVE SYSTEMS SHALL LIMIT WATER TEMPERATURE AT FAUCETS TO 110 DEG F. OR LESS. 8. PROVIDE SCHEDULE 40 PVC PIPING AND FITTINGS FOR ALL COMBUSTION AIR AND VENT PIPING IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS ON ALL DIRECT VENT WATER HEATERS OR BOILERS. FIXTURES 1. REFERENCE FIXTURE SCHEDULES ON PLANS AND PROVIDE ALL REQUIRED CARRIERS, BLOCKING, HANGERS, TAIL PIECES, TRAPS, RISERS, ESCUTCHEONS, GRIDS, PUTTY, GASKETS, CAULKING, ETC. AS REQUIRED TO INSTALL ALL PLUMBING FIXTURES. 2. REVIEW SUBMITTALS FOR ALL OWNER PROVIDED EQUIPMENT AND PROVIDE ANY REQUIRED ACCESSORIES AS NEEDED FOR A COMPLETE INSTALLATION. P.C. SHALL BE RESPONSIBLE TO RECEIVE AND INSTALL ALL OWNER PROVIDED FIXTURES. 3. FIXTURES DESIGNATED FOR HANDICAP ACCESSIBILITY SHALL COMPLY WITH ANSI A 117.1, LATEST EDITION, INCLUDING ADOPTED INDIANA AMENDMENTS. 4. PROVIDE ALL CODE REQUIRED BACKFLOW DEVICES FOR PROCESS HVAC EQUIPMENT AND FOR WATER SERVING ANY DRINKING OR FOOD PREPARATION FIXTURES. 5. PROVIDE BELLOWS TYPE WATER HAMMER ARRESTERS, STAINLESS STEEL CASHING AND BELLOWS, 250 PSI, INSTALL PER PDI STANDARD WH201. PIPING 1. ALL EXPOSED SUPPLY PIPES AND METAL TRIM IN CONNECTION WITH THE FIXTURES SHALL BE CHROME PLATED RED BRASS OR BRONZE, PROVIDE CHROME PLATED STOP VALVES IN ALL SUPPLIES TO ALL FIXTURES. PLASTIC STOPS OR TRIM SHALL NOT BE ACCEPTABLE. CAULK ALL FIXTURES WITH WATERPROOF SILICONE CAULK. TRAPS SHALL HAVE CLEANOUT PLUGS. INSTALL ONE PIECE CHROME ESCUTCHEON PLATE WITH SET SCREW AT WALL PENETRATIONS. 2. WASTE AND VENT PIPING MAINS SHALL BE PITCHED AT 1/8" PER FOOT. LATERAL BRANCHES SHALL BE PITCHED 1/4" PER FOOT TOWARD THE SANITARY SEWER MAIN. THEY SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH THE CURRENT INDIANA PLUMBING CODE AND TESTED PER AUTHORITY HAVING JURISDICTION. 3. VERIFY LOCATION, DEPTH AND SIZE OF SANITARY SEWER CONNECTION POINTS. CONNECT AS REQUIRED. OUTSIDE SEWER SHALL BE INSTALLED WITH MINIMUM OF 3'-0" COVER. COORDINATE CONNECTIONS WITH SITE CONTRACTOR AND LOCAL UTILITY 4. ALL OUTSIDE WATER PIPING SHALL BE COVERED WITH A MINIMUM OF 52". 5. ALL INTERIOR PIPING PENETRATIONS THROUGH WALLS, CEILINGS, ROOFS AND FLOORS SHALL BE SLEEVED AND SEALED. PROVIDE UL LISTED FIRE STOPPING WHERE REQUIRED. 6. ALL EXTERIOR UNDERGROUND PENETRATIONS OF BUILDING FOUNDATIONS OR SLAB FLOORS SHALL BE SLEEVED AND SEALED. PENETRATIONS BELOW GRADE INTO THE BUILDING SHALL BE DONE WITH MECHANICAL SEALS LIKE "LINK SEAL" OR EQUAL. 7. NO PLUMBING PIPING SHALL PASS DIRECTLY OVER ELECTRICAL PANELS OR DISTRIBUTION CABINETS. PRIOR TO ROUGH IN COORDINATE WITH E.C. 8. DIELECTRIC UNIONS SHALL BE USED TO CONNECT DISSIMILAR METALS OR METAL PIPING SHALL HAVE METAL CONNECTIONS ON EACH END THREADED TO MATCH THE ADJACENT PIPING. METAL COMPONENTS SHALL BE SEPARATED BY A NYLON INSULATOR TO PREVENT CURRENT FLOW BETWEEN DISSIMILAR METALS. UNIONS SHALL BE SUITABLE FOR THE SYSTEM OPERATING PRESSURES AND TEMPERATURE WELD TYPE: ASTM A-234. 9. PIPING SLEEVES; INTERIOR OR EXTERIOR ABOVE GRADE; GALVANIZED-STEEL-PIPE SLEEVES OR PVC-PIPE SLEEVES. VERIFY, WITH FIRE AUTHORITIES HAVING JURISDICTION, THAT PVC MATERIALS ARE ALLOWED FOR SLEEVES. BELOW GRADE; ALL; MECHANICAL GALVANIZED-STEEL PIPE SLEEVE SYSTEM LIKE LINK-SEAL. ALL SLEEVES SHALL BE FIRE STOPPED OR CAULKED. EXTERIOR SLEEVES SHALL PROVIDE WATER/AIR TIGHT PENETRATION SYSTEM. 10. PROVIDE HANGERS PER MSS AND IPC STANDARDS BASED ON PIPING TYPES AND SIZES. 11. PIPING MATERIALS UNLESS OTHERWISE NOTED ON THE PLANS SHALL BE AS FOLLOWS: GAS/AIR ABOVE GRADE, 2" AND SMALLER; BLACK STEEL SCHEDULE 40 TYPE E OR S PIPE GRADE B; ASTM A53 / A53M, A105 OR A120 WITH THREADED ENDS; FITTINGS SHALL BE MALLEABLE IRON THREADED FITTINGS ASTM B16.3 CLASS 150. 2-1/2" AND LARGER: BLACK STEEL SCHEDULE 40 TYPE E OR S PIPE GRADE B; ASTM A53 / A53M, A105 OR A120 WITH PLAIN ENDS. FITTINGS; WROUGHT STEEL WELDING FITTINGS TO ASTM A 234/A 234M FOR BUTT AND SOCKET WELDING. WATER COPPER TUBING (INSIDE BUILDING): ASTM B 88, TYPE 'L' HARD WATER TUBE DRAWN TEMPER. WITH CAST-COPPER SOLDER-JOINT FITTINGS: ANSI B16.18. OR WROUGHT-COPPER SOLDER JOINT FITTINGS: ANSI B16.22 SEWER/VENT BELOW GRADE: POLYVINYL CHLORIDE SEWER PIPE (PVC) SOLID: ASTM D1866, ASTM D 2665, ASTM D 2949, ASTM D 3034, CSA B181.2 CSA B182.1,.2,.4 SCHEDULE 40 SOLID DRAIN WASTE AND VENT PIPE. JOINTS SHALL BE PVC SOCKET WELDED FITTINGS DESIGNED TO FIT PIPING DIAMETERS ASTM D 2855 ASSEMBLED WITH PRIMER ASTM F 656 AND SOLVENT CEMENT ASTM D 2564, CSA B181.2. SEWER/VENT ABOVE GRADE: POLYVINYL CHLORIDE SEWER PIPE (PVC) CELLULAR CORE: ASTM F 891 DRAIN WASTE AND VENT PIPE. JOINTS SHALL BE PVC SOCKET WELDED FITTINGS DESIGNED TO FIT PIPING DIAMETERS ASTM D 2855 WITH PRIMER ASTM F 656 AND SOLVENT CEMENT ASTM D 2564, CSA B181.2. ALL PIPING IN RETURN AIR PLENUMS SHALL CONFORM TO REQUIREMENTS FOR PLENUM MATERIALS. VENTING POLYVINYL CHLORIDE DRAIN, WASTE AND VENT PIPE (PVC): ASTM D2665. INSULATED IN RETURN AIR PLENUMS. STORM POLYVINYL CHLORIDE SEWER PIPE (PVC): ASTM D2665 SOLID DRAIN WASTE AND VENT OR ASTM F 891 CELLULAR CORE SCHEDULE 40 WITH PVC SOCKET WELDED FITTINGS DESIGNED TO FIT PIPING DIAMETERS. INSULATED IN RETURN AIR PLENUMS. PLUMBING INSULATION 1. ALL PIPING INSULATION MATERIALS SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS (ON THE FLAME SPREAD TEST SCALE) AND SMOKE DEVELOPMENT OF 50 OR LESS (ON THE SMOKE TEST SCALE) OR AS DEFINED BY NFPA 255 STANDARD METHOD OF TESTING OF SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS, LOCAL CODES AND LOCAL AUTHORITIES HAVING JURISDICTION. ALL PVC PIPING LOCATED IN RETURN AIR PLENUM SPACES OR EXPOSED SHALL BE INSULATED. 2. INSULATION: INSTALL ALL INSULATION IN STRICT ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS IN A TIGHT AND NEAT MANOR. NO SAGGING, FRAYED OR TORN INSULATION WILL BE EXCEPTED. UNLESS OTHERWISE NOTED ON PLANS PIPING SHALL BE INSULATED AS FOLLOWS: ALL PLUMBING PIPING SHALL BE INSULATED TO THE FOLLOWING THICKNESS. a. HW, HWR: 1/2" THICKNESS FOR PIPE SIZES UPTO 1-1/2", 1" THICKNESS FOR GREATER THAN 1-1/2. b. CW: 1/2" THICKNESS FOR PIPE SIZES. c. STM: 1/2" THICKNESS FOR ALL PIPE SIZES. PRE-FORMED TYPE I, 850 DEG F MINERAL OR GLASS FIBERS BONDED WITH A THERMOSETTING RESIN AND HINGED WITH SELF SEALING LAP. COMPLY WITH ASTM C 547, TYPE I, GRADE A, WITH FACTORY-APPLIED ASJ. FLEXIBLE ELASTOMERIC CLOSED CELL OR EXPANDED RUBBER PIPE INSULATION WITH PRESSURE SENSITIVE ADHESIVE SYSTEM, ASTM C534, ASTM E84 CLASS A 300 DEG F. EXTERIOR/EXPOSED JACKETS: UV RESISTANT PVC PIPE JACKETS AND PREFORMED FITTING COVERS COMPLIANT WITH ASTM D257, D638, D790, D792, D1784, D3679, E84 AND E136. CHECK TEST AND START UP REQUIREMENTS 1. CLOSE OUT: PROVIDE MANUFACTURERS OPERATION AND MAINTENANCE MANUALS AND AS BUILT DRAWINGS. PROVIDE (1) TRAINING SESSION TO OWNER SELECTED PERSONNEL AS REQUESTED. 2. FILL SYSTEMS WITH FRESH WATER AND INSPECT ALL CONNECTIONS FOR LEAKAGE. REMOVE ALL PACKING AND PROTECTIVE SHIPPING MATERIALS. CLEAN ALL FIXTURES AND START-UP ALL WATER HEATERS, PUMPS, AND EQUIPMENT. VERIFY PROPER OPERATION. OPERATE ALL FAUCETS AND INSPECT STOPS, RISERS, TRAPS AND DRAINS. CORRECT ALL LEAKS, WATER HAMMER AND VIBRATIONS AS REQUIRED. P001 09/21/20