HomeMy WebLinkAboutP100KEY PLAN
AB
N
3 5 10 13 15 16 17
C
E
H
J
M
O
S
2 1
9 6
D
B
A
F
18
T
G
L
N
7 4 11 12 14
K
28
R
P
WC-1
WC-1
WC-2
LV-1
LV-1LV-1
LV-1
DF
MS
UR
UR
FD-1
FD-1FD-1
TD-1TD-1
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
SAN SAN SANSAN SAN SAN
CO
6"Ø
6"Ø
4"Ø
4"Ø
CO
3"Ø
4"Ø
4"Ø
2"Ø
WC-2
4"Ø
4"Ø
IE= 737.0SAN CO
SANSEE P101 FOR
CONTINUATION
SEE CIVIL PLANS
FOR CONTINUATION
4"Ø Up2"Ø Up
FFE= 743.0SD8 SDSAN SANSAN SAN CO
SAN SAN SAN SANSAN SANROUTE 4" SANITARY LINE UP TO SERVE FIXTURES
ON SECOND FLOOR. SEE SHEET P201 FOR
CONTINUATION.
ROUTE 2" SANITARY LINE UP TO SERVE FIXTURES
ON SECOND FLOOR. SEE SHEET P201 FOR
CONTINUATION.
SEE CIVIL PLANS FOR CONTINUATION OF STORM
DRAIN.
KEY NOTES:
1. REFERENCE SHEET P001 FOR LEGENDS,
ABBREVIATIONS, SPECIFICATIONS AND NOTES.
2. REFERENCE SHEET P002 FOR SCHEDULES AND
DETAILS.
3. REFERENCE SHEET P003 FOR DETAILS.
GENERAL NOTES:
1
DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR
EDOOG.RDIVAD
PROFES
SIONA L E N G INEER D
E
NADIIN A
GER RTSIE
STATE OF
No.
10200395
1 SCALE: 1/8" = 1'-0"
FIRST FLOOR PLUMBING WASTE - AREA 'A'
P100
1
2
2
3
3
09/21/20