HomeMy WebLinkAboutP200KEY PLAN
B
C
D
N
SK-1
WC-1WC-2
UR UR
SK-4
CWCW CW CW CW
2" CW
GAS GAS GAS GASGAS GAS GAS GAS GAS
2" CW
IWH
HWS
1/2" HW
1-1/4" GAS1" GAS
6" SD
SK-1
WC-1WC-2
UR UR
FD-1
SK-4
SAN SANSANSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD8" SD 6" SDFD-1SANSAN
CO
4" DN2"4" SD 6" SD
DWN
6" SD 8" SD
DWN
DATAREV.DATADWG.OF CARMELNAPLETON KIANapleton Automative GroupMEP Engineer874 Cheltenham WayAvon, IN 46123317.506.8151317.745.5761dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP: F: E: MUR
EDOOG.RDIVAD
PROFES
SIONA L E N G INEER D
E
NADIIN A
GER RTSIE
STATE OF
No.
10200395
2 SCALE: 1/8" = 1'-0"
SECOND FLOOR WATER PLAN - AREA 'D'
1 SCALE: 1/8" = 1'-0"
SECOND FLOOR WASTE PLAN - AREA 'D'P200
ROUTE CW AND GAS LINES DOWN TO SERVICE
RECEPTION CEILING ELEVATION AND SEE SHEET
P103 FOR CONTINUATION.
ROUTE 1-1/4" GAS LINE DOWN TO FIRST FLOOR. SEE
SHEET P103 FOR CONTINUATION.
ROUTE CW AND GAS LINES THROUGH WALL TO
SERVICE DEPARTMENT. SEE SHEET P103 FOR
CONTINUATION.
KEY NOTES:
1. REFERENCE SHEET P001 FOR LEGENDS,
ABBREVIATIONS, SPECIFICATIONS AND NOTES.
2. REFERENCE SHEET P002 FOR SCHEDULES AND
DETAILS.
3. REFERENCE SHEET P003 FOR DETAILS.
GENERAL NOTES:
1
1
2
2
3
3
09/21/20