HomeMy WebLinkAboutScope_Of_WorkScope Of Work Name of the Project: Finishing Basement Badroom and Full Bathroom Location of the Project: 4410 Schmidler Dr. Carmel, IN 46074 Scope of Work Statement This project is to finish the unfinished storage area in the basement within the residential home at 4410 Schmidler Dr. Carmel, IN 46074 (Lot 53 – Bellewood) and turn the area into a bedroom with a full bathroom by October 31st, 2020. Below are the itemized tasks that needs to be completed during this project. Bedroom : 1. Frame the concrete basement walls and around the egress window with 2x6 studs 2. Build and frame a wall in between the rough-in bathroom and bedroom area 3. Run electrical cables, install outlet/switch casings and can lights 4. Install insulation for the framed walls 5. Install drywall for the walls and ceiling 6. Finish drywalls by mudding and sanding, paint the walls 7. Install laminate flooring and complete baseboards Bathroom : 1. Install additional PEX pipes for shower, fixtures and toilet to extend from rough-in pipes 2. Run electrical cables for light fixtures and switches 3. Install GFI outlet 4. Install pre-cast shower base and shower walls 5. Install insulation for the bathroom walls 6. Install drywall for the walls and ceiling 7. Finish drywalls by mudding and sanding, paint the walls 8. Install tile flooring and complete baseboards 9. Install single flush toilet 10. Install vanity with cabinets Milestones Start Date September 25, 2020 Halfway Point October 15, 2020 Completion Date October 31, 2020 09/21/20 Tasks and Schedule S.No Tasks Delivery Date Contractor 1 Framing September 26, 2020 Kutlu Ergun 2 Electrical and cabling September 27, 2020 David Electric 3 Plumbing October 2, 2020 Mr. Plummer Plumbing 4 Insulation and Drywall October 5, 2020 Kutlu Ergun 5 Mudding and Painting October 10, 2020 Kutlu Ergun 6 Shower installation and tiling October 17, 2020 Mr. Plummer Plumbing 7 Flooring October 23, 2020 Kutlu Ergun 8 Painting and fixtures, detailing October 24, 2020 Kutlu Ergun Stakeholders S.No Name of Stakeholder Responsibility 1 Kutlu Ergun Framing, Drywall and Mudding, Flooring, Fixtures 2 David Electric Cabling, Electrical 3 Mr. Plummer Plumbing Bathroom, Plumbing Estimate Cost of Project Type Description Cost Labor $5,000.00 Materials 90 2x6 Lumber, 50 4x8 Drywall, R- 13 Insulation, 12 Gauge Wire, 8 Outlets, 1 GFI outlet, 3 switches, 6 can lights, 1 fluorescent light, 1 vanity with cabinets, 1 toilet, 1 pre- cast shower base, shower walls, laminate flooring, underlayment, tile, tile base, grout, adhesive, silicone caulk, silicon grout sealer, 1/2” and 1” PEX pipe, shower door, 1 paneled interior hollow door, baseboard, paint, 2 bucket drywall screws and nails, drywall tape, drywall joint compound. $15,000.00 Total $20,000.00 09/21/20 Contact Details: Project Owner : Kutlu Ergun Address : 4410 Schmidler Dr. Carmel, IN 46074 Phone : (317) 997 – 1091 Email : kutlu.ergun@genesys.com 09/21/20