Loading...
HomeMy WebLinkAboutKuk Scope9/22/2020 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=155315&it=False&pi=813398&print=true 1/7 _____________________________________________________ 8847 Commerce Park Place Suite J                                                                        Basement Estimate Indianapolis, IN  46268                                                                                                July 17, 2020                                                                                                                                           Prepared For: Phone # 317-714-6536                                                                                                 Kyle & Katie Kuk                                                                                                                                           1523 Lash St. www.cmhbuilders.com                                                                                                 Carmel, IN 46032 _____________________________________________________                      9/22/2020 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=155315&it=False&pi=813398&print=true 2/7 Estimate 1000 Building Permits $626.00 Estimated permit cost. The final cost to be determined by municipalities.$626.00 1100 Framing $4,209.53 Framing labor and material.$4,209.53 Labor and material to complete framing in the basement. --Includes all new walls and bulkheads. --Includes all fasteners, tax, and delivery. Option #1 - Select this option to stay with framing per original estimate.$0.00 Option #2 - Select this option to add 6 LVL beams to floor joist in media area.+$1,728.00 1200 Rough In Plumbing $4,560.72 (A) Plumbing rough in.$4,560.72 Labor and material to rough in plumbing as follows: --All water lines and drains for toilet, vanity, shower --Fiberglass shower --Ejector pump with alert system. --Additional charges may apply if the existing under slab plumbing needs to be removed, replaced, or repaired. Option for back up sump pumps. Option for back up sump pumps. Option #1 - Water-powered back up sump pumps.+$664.00 Option #2 - Battery Powered Back up sump pump +$887.98 Option #3 - New primary sump pump with water-powered back up +$1,053.57 Option #4 - New Primary sump pump with battery-powered back up sump pump.+$1,277.55 Option #5 - Select this option to decline sump pumps $0.00 1250 Finish Plumbing $1,250.92 (A) Plumbing finish $673.33 Labor and material to finish plumbing for bathroom. --Includes all drains, sink strainer and supply lines. -Includes labor to install vanity faucet, toilet, shower trim kit with shower head, towel bar, hand towel holder, toilet paper holder, 1/4" frameless mirror. --See Budget items below for toilet, faucets, bathroom accessories. (B) Plumbing finish toilets $153.80 9/22/2020 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=155315&it=False&pi=813398&print=true 3/7 Toilet budgets. --Mansfield standard height elongated toilet is included in the estimated total Option #1 - Upgrade Mansfield comfort height round toilet.+$43.75 Option #2 - Upgrade to a Mansfield comfort height elongated toilet.+$56.25 Option #3 - Choose this option to remain with the Mansfield standard height elongated toilet as quoted. $0.00 Bathroom fixtures $423.79 Bathroom fixture budget. --Includes shower valve, shower head, vanity faucet,18" towel bar, towel ring, toilet paper holder, 1/4" polished edge mirror. Optional Framed shower door. Labor and material to install 70" tall framed by-pass shower door. --Based on multiple frame colors and glass types. Option #1 - Select this option to add a shower door.+$600.00 Option #2 - Select this option to decline the shower door.$0.00 1300 HVAC Rough In $884.52 HVAC Labor and Material.$884.52 Labor and material to complete HVAC rough-in as follows: --Includes 2 supplies and one return. --Includes all final registers and grills. --Includes bathroom exhaust fan/light combo. 1400 Electrical rough in $3,687.66 Electrical Rough-in $3,687.66 Labor and material to complete electrical rough-in. --Estimating 16 can lights, closet light under stairs. --Includes moving existing lights into storage and utility areas. --Outlets and switches per code. --Includes 2 network cables, 1 smoke detector. --Cable and network wiring to run into an unfinished area and to be connected by the service provider. --Includes electrical sub-panel. 1450 Electrical Finish $1,389.05 (A) Electrical Finish $1,389.05 Labor and material to complete electrical finish as follows: --Install all LED Can light trim kits. --Install all switches, outlets, and cover plates. 9/22/2020 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=155315&it=False&pi=813398&print=true 4/7 --All switches, outlets, and cover plates to match existing as close as possible. --Add Additional $28.00 per dimmer switch. 1500 Insulation $1,132.32 Insulation labor and material.$1,132.32 Labor and material to install R-13 insulation in exterior walls. --Based on sq. ft. of coverage --Includes walls between finished and unfinished areas. Optional ceiling insulation in new finished area only. Labor and material to add R-13 insulation to the ceiling of the finished area only Option #1 - Labor and material to install R-13 ceiling insulation in newly finished areas only. +$1,273.44 Client may decline this selection $0.00 1600 Drywall $5,773.17 Drywall $5,773.17 Labor and material to hang and finish drywall --Includes smooth walls and textured ceilings. --Ceiling texture to match the main level as close as possible, if present. --Walls and ceilings inside utility and unfinished storage area to be free of drywall. --Includes drywall, mud, corner bead, tape, tax, and delivery --Includes repairs to existing drywall on stairs that are damaged during CMH Builders construction. --An additional charge of $50.00 per hour per man plus material charge will apply for additional work needed to repair existing drywall damage. 1700 Interior Trim $3,990.98 (A) Interior trim $3,662.58 Labor and material to complete interior trim as follows: --Install 5 hollow core hinged doors, 1 set of hollow core by-swing doors, 1 hollow core by-pass door. --Install baseboards, casing, and door hardware. --All doors, trim, and hardware to match existing close as possible. Closet shelving $328.40 Labor and material to install wire shelving in the closets as follows: --Includes on 1 row of 12" wire wardrobe shelves on the back wall of the closet. --Includes 3 rows of 12" wire linen shelves in the linen closet. Optional Drink Ledge Labor and material to install custom drink ledge. --Based on stained Maple ply drink ledge and painted wood corbels 9/22/2020 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=155315&it=False&pi=813398&print=true 5/7 Option #1 - Select this option for drink ledge.+$1,103.00 Option #2 - Select this option to decline drink ledge.$0.00 Client may decline this selection $0.00 1800 Painting $3,547.29 Complete painting package.$3,547.29 Labor and material to complete painting as follows: --Sand and prime all new drywall. --Textured ceiling to be painted with flat white primer. --Custom color paint on finished walls. --Based on 1 color 2 coats with Sherwin Williams Washable Flat paint. --Walk-in closets to be painted to match walls. --Standard depth closets to be painted flat white. --Color to be selected by homeowners using CMH Builders designer. --Additional charges will apply if a darker color is selected and requires more then 2 coats. --Prep and paint all trim and doors. --Based on Sherwin Williams Semi-Gloss White paint. 1900 Flooring $3,616.65 Carpet, Stairs Only $720.00 Labor and material to install carpet on stairs. --Based on Level 2 carpet with 8 lb. pad. --Includes tack strips, metal transition, tax, and delivery. LVT Flooring $2,896.65 Labor and material to install direct apply LVT flooring in all living area --Based on Level 1 LVT flooring. --Includes metal transition trim, adhesive, tax, and delivery. --Multiple other options available at CMH Builders Showroom ***Slab conditions to dictate the final cost of flooring labor. Certain slab conditions may increase the cost of flooring labor (i.e. levelness, cracking, and control joints). CMH Builders flooring installer to examine slab prior to installation to determine the final cost of flooring install. 2000 Ceramic/Porcelain Tile Dry Bar backsplash material Backsplash tile budget --Based on 3" x 6" white glazed subway tile. --Includes thin-set, grout, metal trim. tax, and delivery. --Final cost may change if tile pattern, level, and/or square footage changes Option #1 - Select this option to add dry bar backsplash material.+$248.80 Client may decline this selection $0.00 9/22/2020 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=155315&it=False&pi=813398&print=true 6/7 Optional Dry Bar Backsplash Labor Labor to install tile on Dry bar backsplash --Labor cost is based on 3" x 6" Subway tiles installed in a brick pattern Option #1 - Select this option to add dry bar backsplash labor.+$624.00 Client may decline this selection $0.00 2100 Cabinets $4,351.50 (A) Dry Bar $3,841.50 Labor and material to install Dry bar cabinets. --Based on Shaker white cabinets. --Includes soft close dovetail drawers, soft close doors, plywood box construction. --Includes Level 1 hardware --Includes 2 custom stained floating shelves. (B) Vanity Cabinet $510.00 Labor and material to install the vanity cabinet. --Based on 30" white Shaker cabinet --Includes Onyx Granite Gloss countertop with integrated sink. 2200 Countertops $1,536.00 Dry Bar Countertops, laminate, option granite $1,536.00 Labor and material to install Dry bar countertops. --Base on 16 sq.ft. of Level A Granite countertops. --Final sq. ft. quantity to be determined at field measure during the project. --Additional cost savings may apply if a remnant piece of granite/quartz is selected. 4000 Cleaning $140.00 Cleaning $140.00 Labor to complete final construction cleaning. --Based on wet mop hard surface flooring, vacuuming of carpet, wipe down all cabinets and countertops. 6000 Discount ($1,000.00) CMH Builders Promotion ($1,000.00) Discount if the estimate is accepted and an October 2020 start date is selected. --Discount is based on estimate total and is subject to change as estimate total changes.   Base Price $39,696.31 9/22/2020 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=155315&it=False&pi=813398&print=true 7/7                                                                                                ****Additional Information**** 1. All pricing is based on CMH Builders completing the entire scope of work using CMH Builders Supplier Materials.  Unit pricing may change if portions of the project removed from CMH Builders' scope. 2. CMH Builders offers a 2 year workmanship warranty on all basements, including a 1 time drywall touch up from settling within the first year. 3. Due to potential changes of material costs from suppliers CMH Builders estimates are valid for 30 days. 4. All work completed by CMH Builders will be up to local building codes.  This estimate does not include repairs or code updates required by the municipal inspector in other areas of the home. Any upgrades required by the inspector, outside of CMH Builders' scope of work, will require additional compensation. 5.  Not all items displayed in CMH Builders proved design is included in the estimate above. 6. Estimate includes up to 2 visits at 2 hours each visit to make selections with CMH Builders Designer.  Additional Charges of $85.00 per hour will apply for any time spent past the amount listed.  Kyle & Katie Kuk,  "Homeowner"  has been presented with an estimate for basement finish and wishes to contract with CMH Builders Inc. "Contractor" to complete a basement finish project at 1523 Lash St.Carmel, IN 46032.   Homeowner agrees to estimate total with the understanding that final selections may increase or decrease the final project cost.   Homeowner to complete all project selections prior to signing Contract with Contractor to determine final pre- construction cost. Contractor to present final contract documents to Homeowner within 5 Business Days of the successful completion of all project selections.  The homeowner has been presented and agreed to the basement design completed by the Contractor. The basement design is attached as Exhibit B to this Agreement.  Homeowner Agrees to pay an earnest money deposit of $1,000.00 when signing this agreement. Homeowner to selected tentative start date with the understanding that the start date may change based on the date of the successful completion of all project selections.  Signatures Client: Kyle & Katie Kuk Aug 11, 2020 Date Builder: Brandon Kriese Jul 17, 2020 Date