Loading...
HomeMy WebLinkAboutEI.0 ELECTRICAL POWER PLAN2 01 D C8'-8"+/-FUTURE FUTURE B 102 DRIVE THRU 101 POS MAIN 103 METAL PROGETTI 104 MANAGER AREA 105 BREAK ROOM 106 DELIVERY107 EXIST. RESTROOM SCALE: 1/4" = 1'-0" 1 E1.0 ELECTRICAL POWER PLAN GENERAL NOTES: (APPLY TO THIS SHEET ONLY) 1. SEE SHEET E0.2 FOR RISER DIAGRAM, PANEL SCHEDULES AND EQUIPMENT CONNECTION SCHEDULE. 2. COORDINATE LOCATION, SIZE AND TYPE OF RECEPTACLES/DISCONNECTS WITH EQUIPMENT PROVIDER. INSTALL UNISTRUT MOUNTING RACK AS REQUIRED SEE 1/E0.1 FOR DETAIL. 3. LOCATION OF UTILITY TRANSFORMER, METER AND INCOMING ASSOCIATED FEEDERS TO BE COORDINATED WITH CIVIL SITE PLAN AND LOCAL UTILITY. POWER NOTES: (APPLY THIS SHEET ONLY) FIRED RATED TELEPHONE BOARD WITH IT AND SECURITY EQUIPMENT, COORDINATE WITH OWNER. SEE A-10 & LV-1 FOR ELEVATION. CONNECTION FOR TV. OUTLET SHALL BE MOUNTED AT 12" BELOW CEILING. COORDINATE FINAL INSTALLATION WITH EQUIPMENT PROVIDER. SEE ARCH. DRAWINGS FOR ADDITIONAL DETAILS. (BY APPROVAL ONLY) PROVIDE POWER FOR INTAKE LOUVER WITH MOTORIZED DAMPER DIRECTLY FROM DRYER EQ-4c MOTOR SUCH THAT WHEN THE DRYER MOTOR IS ON/OFF THE DAMPER OPEN/CLOSES. (BY APPROVAL ONLY) PROVIDE CONNECTION FOR SIGNAGE. COORDINATE ALL SIGN LOCATIONS WITH THE SIGNAGE PACKAGE AND TIDE PM. COORDINATE RECEPTACLE TYPE WITH EQUIPMENT MANUFACTURER. ELECTRICAL CONTRACTOR TO PROVIDE DRYER POWER CORD. PROVIDE RECEPTACLE AND DATA OUTLET FOR CONVEYOR/AUTO COMPUTER. MOUNT CONDUIT AND BOXES DIRECTLY TO THE CONVEYOR LEG. LOCATE BOXES ADJACENT TO THE CONVEYOR MOTOR CONTROL PANEL AT 36"AFF. POWER FOR MOTORIZED DOORS. PROVIDE (1) 1" DATA CONDUIT WITH PULL STRING TO TELEPHONE BACKBOARD / EQ-41. CONDUIT SHALL ALSO BE ROUTED UNDERSLAB TO COME UP UNDER POS. ELECTRICAL CONDUIT FOR CASHWRAP TO BE INSTALLED UNDER SLAB AS SHOWN. REFER TO ARCHITECTURAL DRAWINGS FOR CASHWRAP/POS DETAILS. THE 3 PHASE CIRCUIT FOR EQ-28 AND EQ-30 ARE TO BE INSTALLED WITH 5 WIRES. THE 5TH WIRE SHOULD BE A SPARE NEUTRAL FOR USE BY THE CONVEYOR SCANNERS. EACH STORAGE CONVEYOR (EQ-30) REQUIRES A SEPARATE AND DEDICATED 3 PHASE CIRCUIT. GAS FIRED WATER HEATER. SEE SHEET P3.0 FOR MORE INFORMATION. P1 P2 P3 P4 P6 P7 P9 P10 P12 P13 P14 A-22+48"+48" A-10 GFI A-8 A-8 A-20A-20 A-20 A-10 A-10 +48" GFI A-5 P1 A-10 PANEL "A" A-13 A-13 EQ-1B EQ-37 EQ-3 EQ-3 EQ-4c EQ-4c A-46 A-13 P10 P12 A-33 A-33 A-26 EQ-30 P14 P7 P7 F34 EQ-28 P2 P3 P3 P4 A-12 WP P9 A-31 P13 18" BFC A-28 18" BFC A-28 (FUTURE) (FUTURE) P6 A-24 +78" A-15 WP/GFI EQ-4c (FUTURE) EQ-4c EQ-3 (FUTURE) EQ-3EQ-37 EQ-37 P6 P15 P15 P13 P10 P12 ELECTRICAL POWER PLAN XXX EJR KEY PLAN ISSUE DATE THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF CURRAN ARCHITECTURE, AND ARE NOT TO BE USED OR REPRODUCED, WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF CURRAN ARCHITECTURE. PROJECT INFORMATION CERTIFICATION ISSUE DATES NORTH F :: 317 . 288 . 0753 O :: 317 . 288 . 0681 INDIANAPOLIS, IN 46216 5719 LAWTON LOOP E. DR. #212 N T E S E N G I N E E R I N G Cleveland, OH 44145 25760 First Street P 440 871 2410 F 440 871 7954 tesengineering.com DRAWN BY: ________ CHECKED BY: ________ PROJECT NUMBER: 200079 TIDE CLEANERS 2801 E. 116TH STREET CARMEL, INDIANA 46033 DROP STORE E1.0 AREA OF WORK APPROXIMATE LOCATION OF ELECTRICAL SERVICE METER 06/04/2020 09/24/20