HomeMy WebLinkAboutEI.0 ELECTRICAL POWER PLAN2 01
D
C8'-8"+/-FUTURE
FUTURE
B
102
DRIVE
THRU
101
POS
MAIN
103
METAL
PROGETTI
104
MANAGER
AREA
105
BREAK
ROOM
106
DELIVERY107
EXIST.
RESTROOM
SCALE: 1/4" = 1'-0"
1
E1.0
ELECTRICAL POWER PLAN
GENERAL NOTES:
(APPLY TO THIS SHEET ONLY)
1. SEE SHEET E0.2 FOR RISER DIAGRAM, PANEL SCHEDULES AND EQUIPMENT
CONNECTION SCHEDULE.
2. COORDINATE LOCATION, SIZE AND TYPE OF RECEPTACLES/DISCONNECTS WITH
EQUIPMENT PROVIDER. INSTALL UNISTRUT MOUNTING RACK AS REQUIRED SEE
1/E0.1 FOR DETAIL.
3. LOCATION OF UTILITY TRANSFORMER, METER AND INCOMING ASSOCIATED
FEEDERS TO BE COORDINATED WITH CIVIL SITE PLAN AND LOCAL UTILITY.
POWER NOTES:
(APPLY THIS SHEET ONLY)
FIRED RATED TELEPHONE BOARD WITH IT AND SECURITY EQUIPMENT, COORDINATE
WITH OWNER. SEE A-10 & LV-1 FOR ELEVATION.
CONNECTION FOR TV. OUTLET SHALL BE MOUNTED AT 12" BELOW CEILING.
COORDINATE FINAL INSTALLATION WITH EQUIPMENT PROVIDER. SEE ARCH.
DRAWINGS FOR ADDITIONAL DETAILS. (BY APPROVAL ONLY)
PROVIDE POWER FOR INTAKE LOUVER WITH MOTORIZED DAMPER DIRECTLY FROM
DRYER EQ-4c MOTOR SUCH THAT WHEN THE DRYER MOTOR IS ON/OFF THE DAMPER
OPEN/CLOSES. (BY APPROVAL ONLY)
PROVIDE CONNECTION FOR SIGNAGE. COORDINATE ALL SIGN LOCATIONS WITH THE
SIGNAGE PACKAGE AND TIDE PM.
COORDINATE RECEPTACLE TYPE WITH EQUIPMENT MANUFACTURER. ELECTRICAL
CONTRACTOR TO PROVIDE DRYER POWER CORD.
PROVIDE RECEPTACLE AND DATA OUTLET FOR CONVEYOR/AUTO COMPUTER.
MOUNT CONDUIT AND BOXES DIRECTLY TO THE CONVEYOR LEG. LOCATE BOXES
ADJACENT TO THE CONVEYOR MOTOR CONTROL PANEL AT 36"AFF.
POWER FOR MOTORIZED DOORS.
PROVIDE (1) 1" DATA CONDUIT WITH PULL STRING TO TELEPHONE BACKBOARD /
EQ-41. CONDUIT SHALL ALSO BE ROUTED UNDERSLAB TO COME UP UNDER POS.
ELECTRICAL CONDUIT FOR CASHWRAP TO BE INSTALLED UNDER SLAB AS SHOWN.
REFER TO ARCHITECTURAL DRAWINGS FOR CASHWRAP/POS DETAILS.
THE 3 PHASE CIRCUIT FOR EQ-28 AND EQ-30 ARE TO BE INSTALLED WITH 5 WIRES.
THE 5TH WIRE SHOULD BE A SPARE NEUTRAL FOR USE BY THE CONVEYOR
SCANNERS.
EACH STORAGE CONVEYOR (EQ-30) REQUIRES A SEPARATE AND DEDICATED 3
PHASE CIRCUIT.
GAS FIRED WATER HEATER. SEE SHEET P3.0 FOR MORE INFORMATION.
P1
P2
P3
P4
P6
P7
P9
P10
P12
P13
P14
A-22+48"+48"
A-10
GFI
A-8
A-8
A-20A-20 A-20
A-10
A-10
+48"
GFI
A-5
P1
A-10
PANEL
"A"
A-13
A-13
EQ-1B
EQ-37
EQ-3
EQ-3
EQ-4c
EQ-4c
A-46
A-13
P10
P12 A-33
A-33
A-26
EQ-30
P14
P7
P7
F34
EQ-28
P2
P3
P3
P4
A-12
WP
P9
A-31
P13
18" BFC
A-28
18" BFC
A-28
(FUTURE)
(FUTURE)
P6
A-24
+78"
A-15
WP/GFI
EQ-4c
(FUTURE)
EQ-4c
EQ-3
(FUTURE)
EQ-3EQ-37
EQ-37
P6
P15
P15
P13
P10
P12
ELECTRICAL POWER
PLAN
XXX EJR
KEY PLAN
ISSUE DATE
THIS DRAWING AND THE IDEAS, DESIGNS
AND CONCEPTS CONTAINED HEREIN ARE
THE EXCLUSIVE INTELLECTUAL PROPERTY
OF CURRAN ARCHITECTURE, AND ARE NOT
TO BE USED OR REPRODUCED, WHOLE OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF CURRAN ARCHITECTURE.
PROJECT INFORMATION
CERTIFICATION
ISSUE DATES
NORTH
F :: 317 . 288 . 0753
O :: 317 . 288 . 0681
INDIANAPOLIS, IN 46216
5719 LAWTON LOOP E. DR. #212
N
T E S
E N G I N E E R I N G
Cleveland, OH 44145
25760 First Street
P 440 871 2410
F 440 871 7954
tesengineering.com
DRAWN BY: ________ CHECKED BY: ________
PROJECT NUMBER: 200079
TIDE CLEANERS
2801 E. 116TH STREET
CARMEL, INDIANA 46033
DROP STORE
E1.0
AREA OF
WORK
APPROXIMATE LOCATION
OF ELECTRICAL SERVICE
METER
06/04/2020
09/24/20