HomeMy WebLinkAboutLVI.P LOW VOLTAGE PLAN2 01
D
C8'-8"+/-FUTURE
FUTURE
B
102
DRIVE
THRU
101
POS
MAIN
103
METAL
PROGETTI
104
MANAGER
AREA
105
BREAK
ROOM
106
DELIVERY107
EXIST.
RESTROOM
SCALE: 1/4" = 1'-0"
1
LV1.0
LOW VOLTAGE PLAN
GENERAL NOTES:
(APPLY TO THIS SHEET ONLY)
1. ALL VERTICAL CABLE RUNS SHOULD BE INSTALLED IN CONDUIT.
2. HORIZONTAL CABLE RAN IN THE OPEN CEILING STRUCTURE CAN BE EXPOSED, HOWEVER,
SHOULD BE NEATLY BUNDLED TOGETHER AND FASTENED TO THE STRUCTURE USING J HOOKS,
O RINGS, OR AS LOCAL CODE REQUIRES.
3. ALL DATA CABLING SHOULD BE WHITE, CAT 5E PLENUM TYPE CABLE. EACH TERMINATED
LOCATION SHOULD INCLUDE AN RJ45 KEYSTONE WITH FACEPLATE (DATA JACK). FOR EACH
TERMINATION, THE LOW VOLTAGE CONTRACTOR SHOULD SUPPLY A BLUE, 6' LONG CAT 5E
PLENUM PATCH CABLES WITH RJ45 PLUGS FOR THE OWNER SUPPLIED EQUIPMENT
4. LOW VOLTAGE CONTRACTOR TO SUPPLY & INSTALL SECURITY CAMERA SYSTEM WITH THE
FOLLOWING SPECIFICATIONS:
COMPLETE 8 CAMERA INDOOR/OUTDOOR SONY EFFIO DAY/NIGHT ULTRA HIGH
RESOLUTION MINI INFRARED BULLET CAMERA SYSTEM WITH INTERNET AND CELL PHONE
VIEWING BRAND
- CCTV; MODEL: CSP-8LITE75024IR
- 8 CAMERAS & CABLING
-16 CHANNEL DVR; HARD DRIVE: PROVIDE ENOUGH STORAGE FOR 30 DAY RETENTION
-22” LCD MONITOR
LOW VOLTAGE NOTES:
(APPLY THIS SHEET ONLY)
LOW VOLTAGE CONTRACTOR TO SUPPLY AND INSTALL LOCKABLE IT CABINET (TRIPP LITE 6U;
SRW6UG; BLACK), 24-PORT PATCH PANEL INSIDE IT CABINET, AND (24) BLUE, 1' LONG CAT 5E PLENUM
PATCH CABLES FOR OWNER SUPPLIED NETWORKING EQUIPMENT. INSTALL IT CABINET PER THE 'IT
CABINET AND PHONE BOARD' ELEVATION ON A-10.
INSTALL (1) 3” CONDUIT FROM BOTTOM OF CEILING STRUCTURE TO TOP OF PHONE BOARD FOR
CABLING INSTALLATION TO PATCH PANEL INSIDE IT CABINET.
REAR DOOR CAMERA - PROVIDE 1” CONDUIT THROUGH WALL FOR CAMERA CABLING. BY APPROVAL
ONLY.
PROVIDE (1) 1” CONDUIT WITH PULLSTRING FROM J-BOX FOR CAMERA TO PHONE BOARD/F-16.
CAMERA CONDUIT TO BE INSIDE CANOPY CEILING.
DATA JACKS TO BE INSTALLED AT 54” ABOVE FINISHED FLOOR.
MOUNT CONDUIT AND DATA JACK DIRECTLY TO THE TOP OF THE AUTO-ASSEMBLER. THE CONDUIT
NEEDS TO BE RUN FROM THE CEILING AND AVOID CONFLICTING WITH THE CONVEYOR ABOVE THE
AUTO-ASSEMBLER. LV CONTRACTOR TO COORDINATE THE FINAL CONNECTIONS FOR THE
CONVEYOR SYSTEM WITH TIDE PM.
MOUNT CONDUIT AND DATA JACK DIRECTLY TO CONVEYOR LEG. LOCATE DATA BOX ADJACENT TO
CONVEYOR MOTOR CONTROL PANEL @ 36” AFF.
MOUNT DATA JACK DIRECTLY TO INSIDE OF BASE CABINET UNDERNEATH POS COUNTER. EACH POS
STATION REQUIRES A DOUBLE DATA JACK.
PROVIDE (1) 1” DATA CONDUIT WITH PULLSTRING TO PHONE BOARD. CONDUIT SHOULD BE
INSTALLED UNDERSLAB TO COME UP UNDER POS STATION.
PROVIDE (2) 3” CONDUITS WITH PULLSTRINGS FROM PHONE BOARD TO TELECOMM UTILITY POINT OF
DEMARCATION. COORDINATE WITH CIVIL SITE AND UTILITY PLANS FOR REQUIREMENTS.
INSTALL DATA JACK FOR MANAGERS DESK @ 18” AFF.
INSTALL (3) DATA JACKS FOR VOICE COMMUNICATION @ 18” AFF.; (2) VOICE LINES AND (1)
FAX/SECURITY LINE.
SUPPLY & INSTALL CAMERA SYSTEM (SPECIFIED IN GENERAL NOTES), INCLUDING: 8 CAMERAS &
CABLING, DVR, AND MONITOR. DVR & MONITOR SHOULD BE INSTALLED ON A SHELF ON THE PHONE
BOARD. SETUP AND PROGRAM DVR FOR OWNERS USE.
MOUNT CAMERAS AS CLOSE TO CEILING AS POSSIBLE SO MINIMAL CABLE IS EXPOSED.
INSTALL CAMERA ON WALL APPROX. 8' AFF. COORDINATE HEIGHT WITH OWNER TO ENSURE CLEAR
VISIBILITY TO MANAGERS DESK. CABLE FROM CEILING STRUCTURE TO CAMERA TO BE INSTALLED IN
SURFACE MOUNTED CONDUIT.
1
2
3
5
6
7
8
9
10
11
13
14
15
16
198'-0"3'-0"
F-16 - IT STORAGE CABINET
(SUPPLIED & INSTALLED BY
G.C.)2'-0" 3'-0"1'-0" PUNCHDOWN BLOCKSC1 C2
TIME
CLOCK
(TC)
LIGHTS
3' X 8' X 3/4"
FIRE RATED WOOD
- PAINT WHITE
PUNCHDOWN BLOCKS(2) 3" CONDUITS
- VERIFY WITH PHONE/CABLE SERVICES
-NEW CONSTRUCTION ONLY
(2) 3" CONDUITS
- VERIFY WITH PHONE/CABLE SERVICES
-EXISTING CONSTRUCTION ONLY
(1) 3" CONDUIT FOR LV CABLE MANAGEMENT - RUN
CONDUIT FROM THE SIDE OF THE IT CABINET TO THE
BOTTOM OF THE CEILING TRUSSES
SPACE ALLOCATED
FOR SECURITY
SYSTEM
EQUIPMENT (BY
O.C.V)
CAMERA DVR &
MONITOR ON SHELF
(SUPPLIED &
INSTALLED BY G.C.)
SPACE ALLOCATED
FOR MUSIC SYSTEM
EQUIPMENT (BY O.E.V)6" SCALE: NONE
2
LV1.0
TELCO BACKBOARD ELEVATION
1
2
11
15
13
14
19
5
3
16 16
5
16
5
8
7
9
910
6
10
LOW VOLTAGE PLAN
JDJ EJR
KEY PLAN
ISSUE DATE
THIS DRAWING AND THE IDEAS, DESIGNS
AND CONCEPTS CONTAINED HEREIN ARE
THE EXCLUSIVE INTELLECTUAL PROPERTY
OF CURRAN ARCHITECTURE, AND ARE NOT
TO BE USED OR REPRODUCED, WHOLE OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF CURRAN ARCHITECTURE.
PROJECT INFORMATION
CERTIFICATION
ISSUE DATES
NORTH
F :: 317 . 288 . 0753
O :: 317 . 288 . 0681
INDIANAPOLIS, IN 46216
5719 LAWTON LOOP E. DR. #212
N
T E S
E N G I N E E R I N G
Cleveland, OH 44145
25760 First Street
P 440 871 2410
F 440 871 7954
tesengineering.com
DRAWN BY: ________ CHECKED BY: ________
PROJECT NUMBER: 200079
TIDE CLEANERS
2801 E. 116TH STREET
CARMEL, INDIANA 46033
DROP STORE
LV1.0
AREA OF
WORK
06/04/2020
09/24/20