Loading...
HomeMy WebLinkAboutLVI.P LOW VOLTAGE PLAN2 01 D C8'-8"+/-FUTURE FUTURE B 102 DRIVE THRU 101 POS MAIN 103 METAL PROGETTI 104 MANAGER AREA 105 BREAK ROOM 106 DELIVERY107 EXIST. RESTROOM SCALE: 1/4" = 1'-0" 1 LV1.0 LOW VOLTAGE PLAN GENERAL NOTES: (APPLY TO THIS SHEET ONLY) 1. ALL VERTICAL CABLE RUNS SHOULD BE INSTALLED IN CONDUIT. 2. HORIZONTAL CABLE RAN IN THE OPEN CEILING STRUCTURE CAN BE EXPOSED, HOWEVER, SHOULD BE NEATLY BUNDLED TOGETHER AND FASTENED TO THE STRUCTURE USING J HOOKS, O RINGS, OR AS LOCAL CODE REQUIRES. 3. ALL DATA CABLING SHOULD BE WHITE, CAT 5E PLENUM TYPE CABLE. EACH TERMINATED LOCATION SHOULD INCLUDE AN RJ45 KEYSTONE WITH FACEPLATE (DATA JACK). FOR EACH TERMINATION, THE LOW VOLTAGE CONTRACTOR SHOULD SUPPLY A BLUE, 6' LONG CAT 5E PLENUM PATCH CABLES WITH RJ45 PLUGS FOR THE OWNER SUPPLIED EQUIPMENT 4. LOW VOLTAGE CONTRACTOR TO SUPPLY & INSTALL SECURITY CAMERA SYSTEM WITH THE FOLLOWING SPECIFICATIONS: COMPLETE 8 CAMERA INDOOR/OUTDOOR SONY EFFIO DAY/NIGHT ULTRA HIGH RESOLUTION MINI INFRARED BULLET CAMERA SYSTEM WITH INTERNET AND CELL PHONE VIEWING BRAND - CCTV; MODEL: CSP-8LITE75024IR - 8 CAMERAS & CABLING -16 CHANNEL DVR; HARD DRIVE: PROVIDE ENOUGH STORAGE FOR 30 DAY RETENTION -22” LCD MONITOR LOW VOLTAGE NOTES: (APPLY THIS SHEET ONLY) LOW VOLTAGE CONTRACTOR TO SUPPLY AND INSTALL LOCKABLE IT CABINET (TRIPP LITE 6U; SRW6UG; BLACK), 24-PORT PATCH PANEL INSIDE IT CABINET, AND (24) BLUE, 1' LONG CAT 5E PLENUM PATCH CABLES FOR OWNER SUPPLIED NETWORKING EQUIPMENT. INSTALL IT CABINET PER THE 'IT CABINET AND PHONE BOARD' ELEVATION ON A-10. INSTALL (1) 3” CONDUIT FROM BOTTOM OF CEILING STRUCTURE TO TOP OF PHONE BOARD FOR CABLING INSTALLATION TO PATCH PANEL INSIDE IT CABINET. REAR DOOR CAMERA - PROVIDE 1” CONDUIT THROUGH WALL FOR CAMERA CABLING. BY APPROVAL ONLY. PROVIDE (1) 1” CONDUIT WITH PULLSTRING FROM J-BOX FOR CAMERA TO PHONE BOARD/F-16. CAMERA CONDUIT TO BE INSIDE CANOPY CEILING. DATA JACKS TO BE INSTALLED AT 54” ABOVE FINISHED FLOOR. MOUNT CONDUIT AND DATA JACK DIRECTLY TO THE TOP OF THE AUTO-ASSEMBLER. THE CONDUIT NEEDS TO BE RUN FROM THE CEILING AND AVOID CONFLICTING WITH THE CONVEYOR ABOVE THE AUTO-ASSEMBLER. LV CONTRACTOR TO COORDINATE THE FINAL CONNECTIONS FOR THE CONVEYOR SYSTEM WITH TIDE PM. MOUNT CONDUIT AND DATA JACK DIRECTLY TO CONVEYOR LEG. LOCATE DATA BOX ADJACENT TO CONVEYOR MOTOR CONTROL PANEL @ 36” AFF. MOUNT DATA JACK DIRECTLY TO INSIDE OF BASE CABINET UNDERNEATH POS COUNTER. EACH POS STATION REQUIRES A DOUBLE DATA JACK. PROVIDE (1) 1” DATA CONDUIT WITH PULLSTRING TO PHONE BOARD. CONDUIT SHOULD BE INSTALLED UNDERSLAB TO COME UP UNDER POS STATION. PROVIDE (2) 3” CONDUITS WITH PULLSTRINGS FROM PHONE BOARD TO TELECOMM UTILITY POINT OF DEMARCATION. COORDINATE WITH CIVIL SITE AND UTILITY PLANS FOR REQUIREMENTS. INSTALL DATA JACK FOR MANAGERS DESK @ 18” AFF. INSTALL (3) DATA JACKS FOR VOICE COMMUNICATION @ 18” AFF.; (2) VOICE LINES AND (1) FAX/SECURITY LINE. SUPPLY & INSTALL CAMERA SYSTEM (SPECIFIED IN GENERAL NOTES), INCLUDING: 8 CAMERAS & CABLING, DVR, AND MONITOR. DVR & MONITOR SHOULD BE INSTALLED ON A SHELF ON THE PHONE BOARD. SETUP AND PROGRAM DVR FOR OWNERS USE. MOUNT CAMERAS AS CLOSE TO CEILING AS POSSIBLE SO MINIMAL CABLE IS EXPOSED. INSTALL CAMERA ON WALL APPROX. 8' AFF. COORDINATE HEIGHT WITH OWNER TO ENSURE CLEAR VISIBILITY TO MANAGERS DESK. CABLE FROM CEILING STRUCTURE TO CAMERA TO BE INSTALLED IN SURFACE MOUNTED CONDUIT. 1 2 3 5 6 7 8 9 10 11 13 14 15 16 198'-0"3'-0" F-16 - IT STORAGE CABINET (SUPPLIED & INSTALLED BY G.C.)2'-0" 3'-0"1'-0" PUNCHDOWN BLOCKSC1 C2 TIME CLOCK (TC) LIGHTS 3' X 8' X 3/4" FIRE RATED WOOD - PAINT WHITE PUNCHDOWN BLOCKS(2) 3" CONDUITS - VERIFY WITH PHONE/CABLE SERVICES -NEW CONSTRUCTION ONLY (2) 3" CONDUITS - VERIFY WITH PHONE/CABLE SERVICES -EXISTING CONSTRUCTION ONLY (1) 3" CONDUIT FOR LV CABLE MANAGEMENT - RUN CONDUIT FROM THE SIDE OF THE IT CABINET TO THE BOTTOM OF THE CEILING TRUSSES SPACE ALLOCATED FOR SECURITY SYSTEM EQUIPMENT (BY O.C.V) CAMERA DVR & MONITOR ON SHELF (SUPPLIED & INSTALLED BY G.C.) SPACE ALLOCATED FOR MUSIC SYSTEM EQUIPMENT (BY O.E.V)6" SCALE: NONE 2 LV1.0 TELCO BACKBOARD ELEVATION 1 2 11 15 13 14 19 5 3 16 16 5 16 5 8 7 9 910 6 10 LOW VOLTAGE PLAN JDJ EJR KEY PLAN ISSUE DATE THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF CURRAN ARCHITECTURE, AND ARE NOT TO BE USED OR REPRODUCED, WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF CURRAN ARCHITECTURE. PROJECT INFORMATION CERTIFICATION ISSUE DATES NORTH F :: 317 . 288 . 0753 O :: 317 . 288 . 0681 INDIANAPOLIS, IN 46216 5719 LAWTON LOOP E. DR. #212 N T E S E N G I N E E R I N G Cleveland, OH 44145 25760 First Street P 440 871 2410 F 440 871 7954 tesengineering.com DRAWN BY: ________ CHECKED BY: ________ PROJECT NUMBER: 200079 TIDE CLEANERS 2801 E. 116TH STREET CARMEL, INDIANA 46033 DROP STORE LV1.0 AREA OF WORK 06/04/2020 09/24/20