Loading...
HomeMy WebLinkAboutPI.0 PLUMBING PLANSCA CWHWCWCW HW V VSANEX SAN EX SAN 2 01 D C8'-8"+/- FUTURE FUTURE B 102 DRIVE THRU 101 POS MAIN 103 METAL PROGETTI 104 MANAGER AREA 105 BREAK ROOM 106 DELIVERY107 EXIST. RESTROOM SCALE: 1/4" = 1'-0" 2 P1.0 PLUMBING DOMESTIC PLAN SHEET KEYNOTES 1 EXTEND AND CONNECT 3" SANITARY PIPING TO EXISTING SANITARY PIPING. PLUMBING CONTRACTOR TO VERIFY EXACT LOCATION, SIZE, INVERT, AND DIRECTION OF FLOW PRIOR TO STARTING WORK. 2 EXTEND AND CONNECT 2" SANITARY PIPING TO EXISTING SANITARY PIPING. PLUMBING CONTRACTOR TO VERIFY EXACT LOCATION, SIZE, INVERT, AND DIRECTION OF FLOW PRIOR TO STARTING WORK. 3 EXTEND AND CONNECT 3" VENT PIPING TO EXISTING VENT PIPING. PLUMBING CONTRACTOR TO VERIFY EXACT LOCATION AND SIZE PRIOR TO STARTING WORK. 4 2" CW FROM EXISTING WATER MAIN NEARBY. PLUMBING CONTRACTOR TO VERIFY EXACT LOCATION AND SIZE PRIOR TO STARTING WORK. 5 2" CW AND HW DOWN TO F34. 6 3/4" CW AND HW DOWN IN WALL TO F32 7 1/2" CW AND HW DOWN IN WALL TO SK-1. 8 1-1/2" CW AND HW DOWN IN WALL TO WASHING MACHINE. PROVIDE WITH AMERICAN GRANDY FLOW CONTROL VALVE GP15. VERIFY FINAL LOCATION PRIOR TO INSTALL WITH TDC. 9 1/2" COMPRESSED AIR DOWN TO EQ-1B 10 1/2" COMPRESSED AIR TO STORAGE CONVEYOR. VERIFY FINAL LOCATION PRIOR TO INSTALL WITH TIDE DRY CLEANING. 11 EXTEND AND CONNECT 4" SANITARY PIPING TO EXISTING SANITARY PIPING. PLUMBING CONTRACTOR TO VERIFY EXACT LOCATION, SIZE, INVERT, AND DIRECTION OF FLOW PRIOR TO STARTING WORK. 12 CONTRACTOR TO COORDINATE NEW PIPING WITH EXISTING PIPING AND FIXTURE SUPPORTS. 13 EXTEND T&P RELIEF TO OVER TOP OF MOP BASIN AND TERMINATE WITH 2" AIR GAP ABOVE FLOOD RIM LEVEL OF FIXTURE 14 PLUMBING CONTRACTOR TO PROVIDE ROUGH IN CONNECTIONS WITH SHUT OFF VALVES AND CAP FOR FUTURE CONNECTION. 2 01 D C8'-8"+/-FUTURE FUTURE B 102 DRIVE THRU 101 POS MAIN 103 METAL PROGETTI 104 MANAGER AREA 105 BREAK ROOM 106 DELIVERY107 EXIST. RESTROOM SCALE: 1/4" = 1'-0" 1 P1.0 PLUMBING SANITARY PLAN GENERAL SHEET NOTES 1. EXISTING PLUMBING INFORMATION IS BASED ON LIMITED EXISTING BUILDING DRAWINGS AND FIELD WORK. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING CONDITIONS FOR ACCURACY. CONTRACTOR SHALL NOTIFY OWNER, ARCHITECT AND ENGINEER OF ANY SITUATIONS THAT MODIFY OR INCREASE THE SCOPE OF WORK FROM THAT IS DESCRIBED IN THE DOCUMENTS. 2. ANYTHING NOT NOTED AS EXISTING IS TO BE FURNISHED AND INSTALLED AS PART OF THIS PROJECT. 3. REFER TO DRAWINGS AND PROJECT SPECIFICATIONS OF OTHER DISCIPLINES FOR ADDITIONAL PROJECT INFORMATION AND REQUIREMENTS. NOTIFY ENGINEER OF ANY CONFLICTS BETWEEN THE INFORMATION PRESENTED AND FIELD CONDITIONS. 4. WHERE PIPE, DUCTWORK, INSULATION, FIXTURES OR EQUIPMENT TO REMAIN IS DAMAGED OR DISTURBED, REMOVE THE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY. WHERE IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USED, USE MATERIALS WHOSE INSTALLED PERFORMANCE EQUALS OR SURPASSES THAT OF THE EXISTING MATERIALS. 5. PLUMBING INSTALLATION MUST MAINTAIN INTEGRITY OF WALLS, PARTITIONS AND FLOORS DESIGNATED AS EITHER FIRE RATED OR "SMOKE TIGHT". SEAL AROUND ALL PENETRATIONS THROUGH RATED OR SMOKE TIGHT ASSEMBLIES. COORDINATE WITH ARCHITECTURAL PLANS AND GENERAL CONTRACTOR. 6 PROVIDE STOP VALVES AT EVERY FIXTURE ON BOTH HOT AND COLD WATER SUPPLY LINES. VALVES, ESCUTCHEONS, FITTINGS, ETC. MUST BE CHROME PLATED. WHERE EXPOSED, CHROME PLATED PIPE IS TO BE USED. 7. ALL SANITARY PIPING INSTALLED UNDERGROUND IS TO BE PITCHED @ 1% SLOPE EXCEPT FOR 2" LINES WHICH SHALL BE PITCHED AT 2% SLOPE. 8. ALL OVERHEAD PIPING IS TO BE ROUTED TIGHT TO BUILDING STRUCTURE. 9. PIPING IS NOT PERMITTED IN DEMISING WALLS. 10. ALL EXPOSED, EXTERIOR PIPING SHALL BE PAINTED WITH RUST INHIBITIVE PRIMER, COLOR CODED FINISH, AND IDENTIFICATION LABELS. 11. VERIFY NATURAL GAS AVAILABILITY AND CAPACITY. COORDINATE PRESSURE, SERVICE CONNECTION, AND METER INSTALLATION WITH THE LANDLORD AND LOCAL UTILITY COMPANY. 12. PROVIDE GAS PIPE SUPPORTS ON ROOF. PROVIDE 10'-0" ON CENTER AND AT ALL CHANGES OF DIRECTION. 13. DO NOT ROUTE ANY WATER CONVEYING PIPING OVER ELECTRICAL EQUIPMENT. 14. ALL ACCESSIBLE P-TRAPS MUST BE PROVIDED WITH BOTTOM CLEANOUT PLUGS. 15. INSULATE EXPOSED P-TRAPS, HOT AND COLD VALVES AND PIPING SERVING HANDICAPPED LAVATORIES. 16. ALL CONCEALED PIPING SHALL BE TESTED AND PROVEN LEAK PROOF AND FREE FROM DEFECTS PRIOR TO CONCEALMENT. SK-1 F32 F34 TD-1 1 11 2 3 EX CO SAN 4 5 6 7 8 8 9 10 SK-1 F34 F32 2" O/H 1/2" O/H 2" O/H 3/4" O/H 2" O/H 1-1/2" O/H 1-1/2" O/H 1/2" O/H 12 EQ 1A 1313 TMV-1 14 3/4" O/H PLUMBING PLANS MMD DLJ KEY PLAN ISSUE DATE THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF CURRAN ARCHITECTURE, AND ARE NOT TO BE USED OR REPRODUCED, WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF CURRAN ARCHITECTURE. COPYRIGHT 2020, CURRAN ARCHITECTURE PROJECT INFORMATION CERTIFICATION ISSUE DATES NORTH F :: 317 . 288 . 0753 O :: 317 . 288 . 0681 INDIANAPOLIS, IN 46216 5719 LAWTON LOOP E. DR. #212 N T E S E N G I N E E R I N G Cleveland, OH 44145 25760 First Street P 440 871 2410 F 440 871 7954 tesengineering.com DRAWN BY: ________ CHECKED BY: ________ PROJECT NUMBER: 200079 TIDE CLEANERS 2801 E. 116TH STREET CARMEL, INDIANA 46033 DROP STORE P1.0 06/04/2020 09/24/20