Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A5.1
12 3 4 4.4 5 FIRST FLOOR PLAN 0" FIRST FLOOR PLAN 0" MEZZANINE 10'-0" EAVE HT. 18'-0" EAVE HT. 18'-0" LOWER PARAPET HT. 21'-0" UPPER PARAPET HT. 25'-4" RIDGE HT. 19'-8" REAR PARAPET HT. 21'-5" A6.1 1 B/ DECKING 17'-3" PREFIN. METAL PARAPET COPING (TYP.) SCHEDULED EXTERIOR DOOR (SEE DOOR SCHEDULE - TYP.) FACE BRICK VENEER (TYP.) PREFIN. METAL PARAPET COPING (TYP.) PREFIN. PEMB METAL VERT. PANEL 'A' (TYP.) PREFIN. GUTTER AND DOWNSPOUTS (SEE ROOF PLAN) (TYP.) INSULATED OVERHEAD DOOR (SEE DOOR SCHEDULE - TYP.) PREFIN. PEMB METAL ROOFING SYSTEM 4.3 6 T/ BRICK (NORTH) 13'-4"PREFIN. PEMB METAL VERT. PANEL 'B' (TYP.) BRICK SOLDIER COURSE HEADER (CORBEL OUT 1" - TYP.) 119 120A 120B 121 122 123 124A 124B PREFIN. FLASHING TRANSITION BETWEEN METAL AND BRICK (SEE DETAIL 2/A6.2) STANDARD PREFIN. PEMB WALL PANEL TRANSITION TRIM FLASHING (TYP.) A A.6 B.1 B.7 C B.2C.8 C.9D E FIRST FLOOR PLAN 0" FIRST FLOOR PLAN 0" MEZZANINE 10'-0" MEZZANINE 10'-0" EAVE HT. 18'-0" B/ CANOPY 10'-6" UPPER PARAPET HT. 25'-4" REAR PARAPET HT. 21'-5" A.1D.9 A6.1 2 ATTIC HT. 11'-6" BRICK SOLDIER COURSE HEADER AND ROWLOCK SILLS (CORBEL OUT 1" - TYP.) FACE BRICK VENEER (TYP.) PREFIN. METAL PARAPET COPING (TYP.) PREFIN. METAL PARAPET COPING (TYP.) PREFIN. PEMB METAL VERT. PANEL 'A' (TYP.) SCHEDULED WINDOWS (SEE WINDOW SCHEDULE - TYP.) KEY DROP BOX PREFABRICATED ALUM. CANOPY T/ BRICK (NORTH) 13'-4" PREFIN. PEMB METAL VERT. PANEL 'B' (TYP.) PEMB PREFIN. METAL FASCIA (TYP.) PREFIN. ALUM. GUTTER AND DOWNSPOUT (SEE ROOF PLAN) (TYP.) PREFIN. PEMB METAL VERT. PANEL 'C' (TYP.) W2 W2 100 W3 W3 W7W7 1 2 3 4 4.4 5 FIRST FLOOR PLAN 0" FIRST FLOOR PLAN 0" MEZZANINE 10'-0" B/ CANOPY 10'-6" LOWER PARAPET HT. 21'-0" UPPER PARAPET HT. 25'-4" RIDGE HT. 19'-8"REAR PARAPET HT. 21'-5" A6.1 1 ATTIC HT. 11'-6" PREFIN. METAL PARAPET COPING (TYP.) SCHEDULED EXTERIOR DOOR (SEE DOOR SCHEDULE - TYP.) FACE BRICK VENEER (4X4X16 SIZING- TYP.) PREFIN. METAL PARAPET COPING (TYP.) PEMB PREFIN. METAL FASCIA (TYP.) INSULATED OVERHEAD DOOR (SEE DOOR SCHEDULE - TYP.) PREFIN. PEMB METAL VERT. PANEL 'B' (TYP.) BRICK SOLDIER COURSE HEADER AND ROWLOCK SILLS (CORBEL OUT 1" - TYP. FACE BRICK VENEER (TYP.) PREFIN. METAL PARAPET COPING (TYP.) BUILDING SIGNAGE (BY OWNER) PREFABRICATED ALUM. CANOPY SCHEDULE WINDOWS - SEE WINDOW SCHEDULE (TYP.) EAVE HT 18'-0" T/ BRICK (SOUTH) 15'-0" 4.3 6 PREFIN. PEMB METAL VERT. PANEL 'A' (TYP.) W3W2 113A 113B 114 115 116 117 118A 118B PREFIN. FLASHING TRANSITION BETWEEN METAL PANEL AND BRICK (SEE DETAIL 2/A6.2) A C B.2 C.8 E FIRST FLOOR PLAN 0" FIRST FLOOR PLAN 0" EAVE HT. 18'-0" LOWER PARAPET HT. 21'-0" UPPER PARAPET HT. 25'-4" RIDGE HT. 19'-8" A6.1 2 BRICK SOLDIER COURSE HEADER AND ROWLOCK SILLS (CORBEL OUT 1" - TYP.) FACE BRICK VENEER (TYP.) LOWER ROW OF GLASS TO BE OBSCURED (THIS ELEVATION ONLY - TYP.) (SEE WINDOW SCHEDULE) PREFIN. METAL PARAPET COPING (TYP.) BUILDING SIGNAGE (BY OWNER) SCHEDULED WINDOWS - SEE WINDOW SCHEDULE ( TYP.) A5.1 5 W1 W1 W1 W1 W1 W1 A5.1 5B 2'-4" 2'-0" TYP.3'-5 5/8"EQ EQ4'-8"4'-0" EQ EQ 4'-8" CAST STONE MEDALLION (SMOOTH FACE) FACE BRICK VENEER W/ ANCHORS @ 16" O.C. VERT. (UTILITY SIZE - TYP.) 16 GA. 6" METAL STUD FRAMING @ 16" O.C. WITH BATT INSULATION (R-19 MIN.) 5/8" GYP. SHEATHING BUILDING WRAP 7 1/4"3'-5 5/8" 7 1/4"4 5/8"2" 6 5/8"4'-8"B/ MEDALLION 18'-4" STATE OF 900019 No.MICH A E L W .HAL S T EADI ND I A N AREGISTER E DA RCH I T E C T PROJECT NUMBER DATE 1139 SHELBY STREET INDIANAPOLIS, IN 46203 317.684.1431 CERTIFIED BY: 123 EAST THIRD ST. MARION, INDIANA 46952 765.662.9372 www.halstead-architects.com REVISIONS ISSUE DRAWING © 2020 Halstead Architects All Rights ReservedSTATE RFI -06/01/2020 - - - - DESIGN DEVELOPMENT SET -01/16/2020 90% CONST. DOCUMENTS - 04/01/2020NEW CONSTRUCTION FORMILLER AUTO CARE985 N. RANGELINE ROADCARMEL, INDIANA 46032HAMILTON COUNTYCLAY TOWNSHIP100% CONST. DOCUMENTS - 05/15/2020 1 2 3 4 A5.1 1832 MAY 15, 2020 BUILDING ELEVATIONS SCALE: 1/8" = 1'-0" 1 NORTH ELEVATION SCALE: 1/8" = 1'-0" 2 EAST ELEVATION SCALE: 1/8" = 1'-0" 3 SOUTH ELEVATION SCALE: 1/8" = 1'-0" 4 WEST ELEVATION SCALE: 1/2" = 1'-0" 5 MEDALLION DETAIL ELEVATION 'A'SECTION 'B' 09/25/20