Loading...
HomeMy WebLinkAboutMiller Auto Entrance 04-24-20 April 24, 2020 Alex Jordan Department of Engineering One Civic Square, 1st Floor Carmel, IN 46032 RE: Miller Auto Care 18110006 DP/ ADLS Rangeline Road Mr. Jordan, Please accept this letter and Construction Plans as a request for the proposed construction entrance location for the above-referenced development project. Per the recent comment pertaining to the entrance, we believe it is shown in the best location for the development of the lot. There is currently a concrete approach off of Rangeline Rd and existing asphalt pavement for the existing lot to the south. There will be one owner for both lots and the existing asphalt pavement will be repaired in the area of the main entrance once construction is complete. Please accept the construction entrance as shown off of the existing asphalt drive to provide a stable entrance to the site where the constructions activities will be taking place to the north. If you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, Matt Maple, P.E. Project Manager