Loading...
HomeMy WebLinkAbout1st floor layoutrequired for cantilever.BCI joist blocking 23/32" min. plywood/OSB into each flange. Nail with 8d nails or rimboard closure. ® F05 See Boise literature for Nail Boise Rimboard nail into each flange. to BCI joist with 8d Bo ise R i mboa r d vertical load capacity. ® F07 vertical load capacity.See Boise literature forF07-A of Boise joist & rimboard for total vertical load capacity. Sum vertical load capacities F07-C (stacked over wall below) Load bearing wall above See Boise literature for vertical load capacity. BCI Joist Blocking® F06 above to bearing below. Solid block all posts from F08 required for cantilever.BCI / AJS joist blocking LVL Rim 8d nails @ 6" o.c. ® Inverted hanger F05-A against top flange with 1/8" Boise Rim Board Web Stiffener for 14" & 16" joists. 5 - 3" (10d) nails gap between bottom flange 1/8" Stiffeners are required on both sides - Hangers with side nailing. - Any hanger with sides not containing the top flange with 3 - 3" (10d) - Web stiffener nailed of the joist. 11 7/8" joists, and nails for 9 1/2" and of the web when : Point Load from above > 1500 lbs. (Factored) Install web stiffeners tight For Point Load from above: F16-E 2x block (stacked over wall below) 1/16" Load bearing wall aboveF09 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 (see literature)Filler Block Contact Boise EWP Engineering for specific conditions. Connection valid for all applications. Nailing 12" OCWeb-Filler Connection Double BCI Joist®F58 Start Framing Here 16" O.C Spacing Products PlotIDLengthProduct Plies Net QtyFab Type FJ1 44' 0" 16" AJS® 24 1 1 MFD FJ2 40' 0" 16" AJS® 24 1 1 MFD FJ3 38' 0" 16" AJS® 24 1 2 MFD FJ4 36' 0" 16" AJS® 24 1 10 MFD FJ5 34' 0" 16" AJS® 24 1 2 MFD FJ6 32' 0" 16" AJS® 24 1 7 MFD FJ7 30' 0" 16" AJS® 24 1 1 MFD FJ8 28' 0" 16" AJS® 24 1 3 MFD FJ9-2 28' 0" 16" AJS® 24 2 2 MFD FJ10 26' 0" 16" AJS® 24 1 13 MFD FJ11-2 26' 0" 16" AJS® 24 2 2 MFD FJ12 24' 0" 16" AJS® 24 1 8 MFD FJ13 20' 0" 16" AJS® 24 1 27 MFD FJ14-2 20' 0" 16" AJS® 24 2 6 MFD FJ15-2 18' 0" 16" AJS® 24 2 2 MFD FJ16 16' 0" 16" AJS® 24 1 8 MFD FJ17 14' 0" 16" AJS® 24 1 1 MFD FJ18 12' 0" 16" AJS® 24 1 1 MFD FJ19 8' 0" 16" AJS® 24 1 3 MFD FJ20 4' 0" 16" AJS® 24 1 1 MFD FJ21 2' 0" 16" AJS® 24 1 1 MFD BM-3 10' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 3 3 FF BM-4 10' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 3 3 FF BM-61 28' 0" 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-60 12' 0" 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP 4 4 FF BM-58 6' 0" 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP 1 1 FF BM-59 6' 0" 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-2 20' 0" 1-3/4" x 18" VERSA-LAM® 2.0 3100 SP 4 4 FF BM-1 14' 0" 1-3/4" x 18" VERSA-LAM® 2.0 3100 SP 4 4 FF Ca1 12' 0" 1" x 16" BC RIM BOARD OSB 1 26 FF Bk1 2' 0" 16" AJS® 24 1 18 FF Bk2 2' 0" 16" AJS® 24 1 6 MFD Connector Summary PlotIDQtyManufProduct Flange H1 1 USP THDH7214 None USEDWALL FOR BEARNG. PLEASE VERIFY FOOTING FRAMING BY OTHER. PLEASE VERIFY BEAM BM - 1 FAILEDDUETO BEARING LENGTH. IT REQUIRES 6" BEARING LENGTH. PLEASE VERIFY ADDFLUSHEDBEAM TO SUPPORT POINT LOAD ABOVE. PLEASE VERIFY PRELIMINARY- NOT FOR CONSTRUCTION - VERIFY STAIRCASE FRAMING WITH BUILDERPRIOR TO SHIPMENT BM-1BM-2 BM-3 BM-4 B M - 5 8 B M - 5 9 BM-60BM-61Ca1Ca1Ca1 C a1 Ca1 Ca1 Ca1Ca1Ca1Ca1 Ca1Ca1Ca1 Ca1 Ca1Ca1Ca1Ca1 Ca1Ca1Ca1 Ca1 Ca 1Ca1Ca 1Ca1Ca1Ca1 Ca1 Ca1 Ca1 Ca1 Ca1Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1Ca1 Bk2 Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1Ca1 C a 1 C a1 Ca1 Ca1Ca1Ca1Ca1Ca1 Ca1 Ca 1 Ca1 Ca 1 C a 1 Ca 1 Ca1Ca1Ca1Ca1Ca1Ca1 Ca1Ca1 FJ7FJ15-2 FJ17FJ6FJ6FJ13 FJ9-2FJ21 FJ10 FJ3FJ3FJ2FJ18 FJ1FJ14-2FJ10FJ10FJ10FJ10FJ20 FJ11-2FJ13FJ13FJ6 FJ6 FJ5 FJ16 FJ16 FJ8 FJ12FJ12FJ12 FJ13FJ13 FJ10 FJ4FJ4 FJ19 FJ13 FJ14-2 Bk1 Bk1 Bk2 Bk2 Bk2 U n d e s i g n e d U n d e s i g n e d H1 1X1X 1' 6 1/4" 1' 1 3/4"By: Date: Scale:1/4"=1' BC FRAMER RIMBOARDISNOT TO BE CUT. IF A PIECE OF RIMBOARDENDSBETWEEN TWO JOISTS, BUTT THE NEXT PIECE UP TO IT. Boise I-Joist can be offset up to 3" to avoid vertical plumbing. Joist 3" max C L Joist 3" max C L OJ-AFASTENALL2-PLY LVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLY LVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLY LVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 3-PLY LVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLY LVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLY LVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 4-PLY LVL'S UP TO 18" WITH 2 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED FASTEN ALL 4-PLY LVL'S 20"-24" WITH 3 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED ALL 1/2" BOLTS , CAN BE REPLACEDWITH SDW22634 SCREWS UNLESS OTHERWISE NOTEDON THE LAYOUT FOR ALL CONNECTION DETAILS Revision Date: Revision Date:1ST FLR FRAMINGCarter Lumber, Franklin INSigma - PandaSigma10/01/20