Loading...
HomeMy WebLinkAbout2nd floor layoutrequired for cantilever.BCI joist blocking 23/32" min. plywood/OSB into each flange. Nail with 8d nails or rimboard closure. ® F05 See Boise literature for Nail Boise Rimboard nail into each flange. to BCI joist with 8d Bo ise R i mboa r d vertical load capacity. ® F07 vertical load capacity.See Boise literature forF07-A of Boise joist & rimboard for total vertical load capacity. Sum vertical load capacities F07-C (stacked over wall below) Load bearing wall above See Boise literature for vertical load capacity. BCI Joist Blocking® F06 above to bearing below. Solid block all posts from F08 required for cantilever.BCI / AJS joist blocking LVL Rim 8d nails @ 6" o.c. ® Inverted hanger F05-A against top flange with 1/8" Boise Rim Board Web Stiffener for 14" & 16" joists. 5 - 3" (10d) nails gap between bottom flange 1/8" Stiffeners are required on both sides - Hangers with side nailing. - Any hanger with sides not containing the top flange with 3 - 3" (10d) - Web stiffener nailed of the joist. 11 7/8" joists, and nails for 9 1/2" and of the web when : Point Load from above > 1500 lbs. (Factored) Install web stiffeners tight For Point Load from above: F16-E 2x block (stacked over wall below) 1/16" Load bearing wall aboveF09 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 (see literature)Filler Block Contact Boise EWP Engineering for specific conditions. Connection valid for all applications. Nailing 12" OCWeb-Filler Connection Double BCI Joist®F58 Start Framing Here 16" O.C Spacing Start Framing Here 16" O.C SpacingProducts PlotID Length Product Plies Net QtyFab Type FJ1 34' 0" 14" BCI® 4500s-1.8 1 4 MFD FJ2 32' 0" 14" BCI® 4500s-1.8 1 4 MFD FJ3 30' 0" 14" BCI® 4500s-1.8 1 1 MFD FJ4 28' 0" 14" BCI® 4500s-1.8 1 8 MFD FJ5 26' 0" 14" BCI® 4500s-1.8 1 5 MFD FJ6 20' 0" 14" BCI® 4500s-1.8 1 2 MFD FJ7 18' 0" 14" BCI® 4500s-1.8 1 3 MFD FJ8 16' 0" 14" BCI® 4500s-1.8 1 4 MFD FJ9 12' 0" 14" BCI® 4500s-1.8 1 2 MFD FJ10 10' 0" 14" BCI® 4500s-1.8 1 21 MFD FJ11 8' 0" 14" BCI® 4500s-1.8 1 6 MFD FJ12 6' 0" 14" BCI® 4500s-1.8 1 4 MFD FJ13 4' 0" 14" BCI® 4500s-1.8 1 6 MFD FJ14 34' 0" 14" AJS® 24 1 1 MFD FJ15 32' 0" 14" AJS® 24 1 1 MFD FJ16 30' 0" 14" AJS® 24 1 1 MFD FJ17 28' 0" 14" AJS® 24 1 1 MFD FJ18-2 28' 0" 14" AJS® 24 2 2 MFD FJ19 26' 0" 14" AJS® 24 1 14 MFD FJ20 24' 0" 14" AJS® 24 1 38 MFD FJ21-2 24' 0" 14" AJS® 24 2 2 MFD BM-13 14' 0" 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-11 10' 0" 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-12 18' 0" 1-3/4" x 11-1/4" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-5 14' 0" 1-3/4" x 11-1/4" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-7 16' 0" 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-14 26' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 3 3 FF BM-24 20' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-43 20' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 4 4 FF BM-23 16' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 4 4 FF BM-10 14' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 3 3 FF BM-28 14' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 3 3 FF BM-27 12' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-31 10' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 1 1 FF BM-47 10' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 1 1 FF BM-25 8' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 1 1 FF BM-30 8' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 1 1 FF BM-56 8' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 1 1 FF BM-57 8' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 1 1 FF BM-32 6' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 1 1 FF BM-48 6' 0" 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 1 1 FF BM-6 34' 0" 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP 2 2 FF BM-38 10' 0" 1-3/4" x 18" VERSA-LAM® 2.0 3100 SP 2 2 FF 2x by other 8' 0" 3 1/2" x 11 7/8" Generic Material 1 1 FF 2x by other 6' 0" 3 1/2" x 11 7/8" Generic Material 1 1 FF Girder by other 24' 0" 3 1/2" x 1' 0" Generic Material 1 1 FF 2x by other 8' 0" 3 1/2" x 1' 0" Generic Material 1 1 FF Ca1 12' 0" 1" x 14" BC RIM BOARD OSB 1 20 FF Bk1 2' 0" 14" BCI® 4500s-1.8 1 9 FF Bk2 2' 0" 14" BCI® 4500s-1.8 1 22 MFD Connector Summary PlotID QtyManufProduct Flange H1 1 USP HDQ5212IF Reverse H2 3 USP HUS179 None H3 1 USP LSSH179 None H4 1 USP LSSH179 None H5 2 USP SKH210L None H6 3 USP SKH210R None H8 1 HF7140 None H9 3 HUS 179 None H10 57 IHF1714 None H11 28 IHF3514 None H12 1 THDH410 None VERIFYBEAM WILL BE PROPERTYBRACE TO AVOID MOMENT ISSUES. PLEASE VERIFY ADDFLUSHEDBEAM TO REDUCE JOIST SPAN. PLEASE VERIFY extend beam to avoid point load on slider below- please approve assumes framed 2x byother assumes tub framed through with I JOIST - please approve BM-5 BM-6BM-7 2x by other2x by otherBM-10 BM-11BM-12 BM-13BM-14 BM-23 BM-24BM-25 BM-27BM-28 BM-30BM-31BM-32BM-38 BM-43 BM-47BM-48 2x by other Girder by otherBM-56 BM-57 Ca1Ca1Ca1 Ca1Ca1Ca1Ca1 Ca1Ca1Ca1 Ca1Ca1 Ca1 Ca1Ca1Ca1Ca1 Ca1Ca1Ca1Ca1 Ca1 Ca1Ca1Ca1 Ca1Ca1Ca1 Ca 1 C a 1Ca1 Ca1Ca1Ca1Ca1Bk1 Ca1 Ca1 Ca1Ca1Ca1Ca 1C a 1 Ca1 Ca1 Ca1Ca1Ca1Ca1Ca1 Ca1 FJ3FJ8FJ12FJ13FJ11 FJ7 FJ12FJ16FJ14FJ5 FJ17FJ21-2FJ15FJ18-2FJ13H10 H10H5H6 H10 H11 H10 H11 H10 H10 H10 H10 H10 H10 FJ2 FJ2 FJ1 FJ13 FJ8 FJ11 FJ20 FJ10 FJ9FJ20FJ6FJ12 FJ10 FJ10 FJ19FJ19 FJ4 FJ7 FJ5FJ4 Bk2Bk2 Bk2Bk2 Bk2Bk2Bk1 Bk2 Bk2 Undesigned H2 H6H4H3 H2 H1H2 H12 H9H8H9 H9 1X1X 1X1X 1X1X 1X1X 8" 1' 4" 8"1' 7" 1' 1"1' 7"1' 1"8"1' 4"8"By: Date: Scale:1/4"=1' BC FRAMER RIMBOARD IS NOT TO BE CUT. IF A PIECE OF RIMBOARD ENDS BETWEEN TWO JOISTS, BUTT THE NEXT PIECE UP TO IT. Boise I-Joist can be offset up to 3" to avoid vertical plumbing. Joist 3" max C L Joist 3" max C L OJ-AFASTENALL2-PLYLVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLYLVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLYLVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 3-PLYLVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLYLVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLYLVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 4-PLYLVL'S UP TO 18" WITH 2 ROWS OF 1/2" STAGGERED THROUGH BOLTS @12" OC STAGGERED FASTEN ALL 4-PLYLVL'S 20"-24" WITH 3 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED ALL 1/2" BOLTS , CAN BE REPLACED WITH SDW22634 SCREWS UNLESS OTHERWISE NOTED ON THE LAYOUT FOR ALL CONNECTION DETAILS Revision Date: Revision Date:2NDFLR FRAMINGCarter Lumber, Franklin INSigma - PandaSigma10/01/20