HomeMy WebLinkAboutD111DECONSTRUCTION PLAN
DECONSTRUCTION
PLAN
D111
REMOVE EXISTING CABINETRY AND COUNTERTOP.
REMOVE EXISTING SINK. NO SERVICE SINKS ARE BEING REMOVED.
REMOVE EXISTING PROJECTOR SCREEN AND SYSTEM. ALL
HARDWARE TO BE REMOVED FROM CEILING.
NOT USED.
REMOVE EXISTING SHELVES AND COAT ROD.
IN AREA TO BE EXPOSED TO DECK, REMOVE AS MUCH OF THE
EXPOSED CONDUIT, PIPING, JUNCTION BOXES AND
MISCELLANEOUS UNUSED EQUIPMENT IN THE CEILING AS POSSIBLE.
REMOVE LOW PRESSURE SUPPLY BRANCH LINE DUCT AND
REPLACE WITH NEW RIGID SPIRAL DUCT AND RECTANGULAR
SUPPLY DIFFUSERS AS REQUIRED. SEE REFLECTED CEILING PLAN
FOR EXACT LOCATION OF EXPOSED DECK CEILING AND
ADDITIONAL DETAILS.
AREA NOT IN CONTRACT
AREA OF WORK
DESCRIPTIONDATE
ISSUE
08.31.20 75% REVIEW SET
09.02.20 PERMIT SET
REVISIONS
DESCRIPTIONMARK DATE DB
THIS DRAWING, AND THE IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF SCHOTT DESIGN.450 E. 96th StreetIndianapolis, IN 46240p: 317.387.1700PROJECT NUMBER
DRAWN BYPROJ. MGR STERLING INVESTORSLIFE INSURANCEMERIDIAN TOWER - SUITE 24010201 N. ILLINOIS ST, INDIANAPOLIS, IN 46290MSSDH/MS
2020.162
2ND FLOOR
N
0 2'4' 8' 16'
ELECTRIC OUTLET(S)
DATA OR
COMMUNICATION
OUTLET
EXISTING TO BE REMOVED EXISTING TO REMAIN
WALL
DOOR AND FRAME
WINDOW / SIDELIGHT
WALL
DOOR AND FRAME
CEILING GRID AND
TILES, 2'x4'
SUPPLY AIR DIFFUSERS
LIGHT FIXTURE,
FLUORESCENT, 2'x4'
LIGHT FIXTURE, CAN
LIGHT SWITCH
LIGHT FIXTURE,
FLUORESCENT, 2'x2'
WINDOW / SIDELIGHT
CEILING GRID AND
TILES, 2'x2'
LIGHT FIXTURE, TRACK
LIGHT FIXTURE, SCONCE
LIGHT FIXTURE,
PENDANT
EXIT LIGHT
LIGHT FIXTURE,
FLUORESCENT
EXHAUST FAN
EMERGENCY LIGHT
PARTIAL HEIGHT WALLPARTIAL HEIGHT WALL
PLAN NOTESLEGEND
1. REFER TO ALL DECONSTRUCTION NOTES ON TITLE SHEET T111.
2. ALL ITEMS BEING REMOVED FROM PROJECT AREA ARE TO BE
CAREFULLY CONSIDERED FOR REUSE IN THE PROJECT OR
SALVAGED FOR LANDLORD. FOR ALL ITEMS DETERMINED FOR
REMOVAL, REFER TO THE RECYCLING INSTRUCTIONS.
3. REMOVE EXISTING RECEPTACLES AND/OR SWITCHES AS SHOWN
ON PLAN PER LEGEND. PATCH WALL AND PREPARE FOR NEW
FINISHES AS REQUIRED.
4. SALVAGE REMOVED HVAC DIFFUSERS FOR REUSE. SEE REFLECTED
CEILING PLAN FOR MORE INFORMATION.
5. REMOVE ALL CEILING GRID, TILE, AND LIGHTING THROUGHOUT.
GENERAL NOTES RECYCLING INSTRUCTIONS
METALS ONLY RECYCLING BIN:
1. CONTACT WASTE HAULER TO ORDER TRASH DUMPSTER(S) AS
REQUIRED AND (1) "METALS ONLY" RECYCLING BIN FOR THE
DEMOLITION PORTION OF PROJECT ONLY. SIZE OF "METALS ONLY"
BIN IS DETERMINED BY THE AMOUNT OF DEMOLITION (10-40 YARD
CONTAINERS AVAILABLE).
2. DRYWALL MUST BE REMOVED FROM ALL METAL STUDS PRIOR TO
PLACING IN "METALS ONLY" BIN. ANY ADDED LABOR COST WILL BE
COVERED BY METAL CREDITS RECEIVED FROM WASTE HAULER.
3. WASTE HAULER WILL APPLY CREDIT FOR METALS OBTAINED IN
"METALS ONLY" BIN TOWARDS CONTRACTORS OVERALL INVOICE.
4. DATA/DIVERSION REPORTS ARE NOT REQUIRED NOR ANY LEED
PROCESSES OR PAPERWORK.
APPROVED METAL ITEMS:
5. METAL STUDS, DOOR FRAMES, DOOR HARDWARE, CEILING GRID,
LIGHT BOX FIXTURES, METAL CABINETS, METAL PLUMBING FIXTURES,
ELECTRICAL AND DATA WIRING/CONDUIT, HVAC COMPONENTS,
AND ELECTRICAL/DATA/SWITCH BOXES
CARPET RECYCLING:
6. CONTACT KRUSE CARPET RECYCLING TO SCHEDULE PICK UP OF
ALL CARPET BEING REMOVED (BROADLOOM AND CARPET TILE).
COORDINATE REQUIREMENTS AND PICK UP WITH SUSAN SHAFER
(317) 337-1950. DEMOLITION CREW IS NOT RESPONSIBLE FOR
KRUSE SERVICE FEES AND WILL ALSO RECOGNIZE A SAVINGS BY
NO LONGER PAYING HAULING/TIPPING FEES ON CARPET
DISPOSAL WITH WASTE HAULER.
7. KRUSE WILL PROVIDE AN ON-SITE BIN ON DAYS REQUIRED.
DEMOLITION CREW IS TO PLACE CARPET DIRECTLY INTO BIN; DOES
NOT NEED TO BE PALLETIZED. CONTRACTOR IS RESPONSIBLE FOR
KEEPING BINS CLEAN AND DRY AS TO NOT CONTAMINATE
CONTENTS.
8. KRUSE PICK UP AND RECYCLING FEES ARE TO BE PAID THROUGH
SCHOTT DESIGN'S "NO COST ADD PROGRAM". CARPET
MANUFACTURER IS TO PAY $1.00 PER SQUARE YARD FOR CARPET
RECYCLING BY REDUCING PRICE OF CARPET MATERIAL BY $1.00.
FLOORING CONTRACTOR IS RESPONSIBLE FOR DEDUCTING
MATERIAL PRICE AND PAYING $1.00 PER SQUARE YARD TO KRUSE.
SCHOTTXCHANGE:
9. CONTACT SCHOTTXCHANGE BEFORE DEMOLITION OF ITEMS THAT
CANNOT BE RECYCLED OR SALVAGE FOR LANDLORD.
SCHOTTXCHANGE CONSIDERS: DOORS, GLASS WINDOW SYSTEMS,
CABINETS, DECORATIVE LIGHTS, AND FURNITURE. IF ITEMS ARE
ACCEPTED FOR OUR INVENTORY, COORDINATE PICKUP AFTER
DEMOLITION WITH MALLORY STUMP (317) 762-0675 AT
SCHOTTXCHANGE AT NO COST TO THE PROJECT.
CONTACT MALLORY STUMP (317) 762-0675 AT SCHOTT DESIGN FOR
ANY QUESTIONS REGARDING THE RECYCLING PROCESSES.
10/02/20