Loading...
HomeMy WebLinkAboutD111DECONSTRUCTION PLAN DECONSTRUCTION PLAN D111 REMOVE EXISTING CABINETRY AND COUNTERTOP. REMOVE EXISTING SINK. NO SERVICE SINKS ARE BEING REMOVED. REMOVE EXISTING PROJECTOR SCREEN AND SYSTEM. ALL HARDWARE TO BE REMOVED FROM CEILING. NOT USED. REMOVE EXISTING SHELVES AND COAT ROD. IN AREA TO BE EXPOSED TO DECK, REMOVE AS MUCH OF THE EXPOSED CONDUIT, PIPING, JUNCTION BOXES AND MISCELLANEOUS UNUSED EQUIPMENT IN THE CEILING AS POSSIBLE. REMOVE LOW PRESSURE SUPPLY BRANCH LINE DUCT AND REPLACE WITH NEW RIGID SPIRAL DUCT AND RECTANGULAR SUPPLY DIFFUSERS AS REQUIRED. SEE REFLECTED CEILING PLAN FOR EXACT LOCATION OF EXPOSED DECK CEILING AND ADDITIONAL DETAILS. AREA NOT IN CONTRACT AREA OF WORK DESCRIPTIONDATE ISSUE 08.31.20 75% REVIEW SET 09.02.20 PERMIT SET REVISIONS DESCRIPTIONMARK DATE DB THIS DRAWING, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN.450 E. 96th StreetIndianapolis, IN 46240p: 317.387.1700PROJECT NUMBER DRAWN BYPROJ. MGR STERLING INVESTORSLIFE INSURANCEMERIDIAN TOWER - SUITE 24010201 N. ILLINOIS ST, INDIANAPOLIS, IN 46290MSSDH/MS 2020.162 2ND FLOOR N 0 2'4' 8' 16' ELECTRIC OUTLET(S) DATA OR COMMUNICATION OUTLET EXISTING TO BE REMOVED EXISTING TO REMAIN WALL DOOR AND FRAME WINDOW / SIDELIGHT WALL DOOR AND FRAME CEILING GRID AND TILES, 2'x4' SUPPLY AIR DIFFUSERS LIGHT FIXTURE, FLUORESCENT, 2'x4' LIGHT FIXTURE, CAN LIGHT SWITCH LIGHT FIXTURE, FLUORESCENT, 2'x2' WINDOW / SIDELIGHT CEILING GRID AND TILES, 2'x2' LIGHT FIXTURE, TRACK LIGHT FIXTURE, SCONCE LIGHT FIXTURE, PENDANT EXIT LIGHT LIGHT FIXTURE, FLUORESCENT EXHAUST FAN EMERGENCY LIGHT PARTIAL HEIGHT WALLPARTIAL HEIGHT WALL PLAN NOTESLEGEND 1. REFER TO ALL DECONSTRUCTION NOTES ON TITLE SHEET T111. 2. ALL ITEMS BEING REMOVED FROM PROJECT AREA ARE TO BE CAREFULLY CONSIDERED FOR REUSE IN THE PROJECT OR SALVAGED FOR LANDLORD. FOR ALL ITEMS DETERMINED FOR REMOVAL, REFER TO THE RECYCLING INSTRUCTIONS. 3. REMOVE EXISTING RECEPTACLES AND/OR SWITCHES AS SHOWN ON PLAN PER LEGEND. PATCH WALL AND PREPARE FOR NEW FINISHES AS REQUIRED. 4. SALVAGE REMOVED HVAC DIFFUSERS FOR REUSE. SEE REFLECTED CEILING PLAN FOR MORE INFORMATION. 5. REMOVE ALL CEILING GRID, TILE, AND LIGHTING THROUGHOUT. GENERAL NOTES RECYCLING INSTRUCTIONS METALS ONLY RECYCLING BIN: 1. CONTACT WASTE HAULER TO ORDER TRASH DUMPSTER(S) AS REQUIRED AND (1) "METALS ONLY" RECYCLING BIN FOR THE DEMOLITION PORTION OF PROJECT ONLY. SIZE OF "METALS ONLY" BIN IS DETERMINED BY THE AMOUNT OF DEMOLITION (10-40 YARD CONTAINERS AVAILABLE). 2. DRYWALL MUST BE REMOVED FROM ALL METAL STUDS PRIOR TO PLACING IN "METALS ONLY" BIN. ANY ADDED LABOR COST WILL BE COVERED BY METAL CREDITS RECEIVED FROM WASTE HAULER. 3. WASTE HAULER WILL APPLY CREDIT FOR METALS OBTAINED IN "METALS ONLY" BIN TOWARDS CONTRACTORS OVERALL INVOICE. 4. DATA/DIVERSION REPORTS ARE NOT REQUIRED NOR ANY LEED PROCESSES OR PAPERWORK. APPROVED METAL ITEMS: 5. METAL STUDS, DOOR FRAMES, DOOR HARDWARE, CEILING GRID, LIGHT BOX FIXTURES, METAL CABINETS, METAL PLUMBING FIXTURES, ELECTRICAL AND DATA WIRING/CONDUIT, HVAC COMPONENTS, AND ELECTRICAL/DATA/SWITCH BOXES CARPET RECYCLING: 6. CONTACT KRUSE CARPET RECYCLING TO SCHEDULE PICK UP OF ALL CARPET BEING REMOVED (BROADLOOM AND CARPET TILE). COORDINATE REQUIREMENTS AND PICK UP WITH SUSAN SHAFER (317) 337-1950. DEMOLITION CREW IS NOT RESPONSIBLE FOR KRUSE SERVICE FEES AND WILL ALSO RECOGNIZE A SAVINGS BY NO LONGER PAYING HAULING/TIPPING FEES ON CARPET DISPOSAL WITH WASTE HAULER. 7. KRUSE WILL PROVIDE AN ON-SITE BIN ON DAYS REQUIRED. DEMOLITION CREW IS TO PLACE CARPET DIRECTLY INTO BIN; DOES NOT NEED TO BE PALLETIZED. CONTRACTOR IS RESPONSIBLE FOR KEEPING BINS CLEAN AND DRY AS TO NOT CONTAMINATE CONTENTS. 8. KRUSE PICK UP AND RECYCLING FEES ARE TO BE PAID THROUGH SCHOTT DESIGN'S "NO COST ADD PROGRAM". CARPET MANUFACTURER IS TO PAY $1.00 PER SQUARE YARD FOR CARPET RECYCLING BY REDUCING PRICE OF CARPET MATERIAL BY $1.00. FLOORING CONTRACTOR IS RESPONSIBLE FOR DEDUCTING MATERIAL PRICE AND PAYING $1.00 PER SQUARE YARD TO KRUSE. SCHOTTXCHANGE: 9. CONTACT SCHOTTXCHANGE BEFORE DEMOLITION OF ITEMS THAT CANNOT BE RECYCLED OR SALVAGE FOR LANDLORD. SCHOTTXCHANGE CONSIDERS: DOORS, GLASS WINDOW SYSTEMS, CABINETS, DECORATIVE LIGHTS, AND FURNITURE. IF ITEMS ARE ACCEPTED FOR OUR INVENTORY, COORDINATE PICKUP AFTER DEMOLITION WITH MALLORY STUMP (317) 762-0675 AT SCHOTTXCHANGE AT NO COST TO THE PROJECT. CONTACT MALLORY STUMP (317) 762-0675 AT SCHOTT DESIGN FOR ANY QUESTIONS REGARDING THE RECYCLING PROCESSES. 10/02/20