Loading...
HomeMy WebLinkAboutLibraryExteriorElevationsLIBRARY GARAGE BRIDGE 5/14/2020 11:15:39AMCARMEL CLAY PUBLIC LIBRARY RENOVATION │ KEY PLAN© 2019 RATIO │ 2020-02-12 18104.0001" = 20'-0"BZA-1 1 KEY PLAN 1 2 3 4 5 6 7 8 9 10 11 EXISTING MECHANICAL YARD WITH BRICK SCREEN WALL (TO REMAIN), REFER TO CIVIL PLANS FOR ADDITIONAL INFORMATION NEW TRASH ENCLOSURE REVISED 5/14/2020 10/07/20 FIRST LEVEL 100'-0" SECOND LEVEL 118'-0" ROOF PEAK 151'-9" EXISTING ALUMINUM STOREFRONT WINDOWS EXISTING STANDING SEAM METAL ROOF TO REMAIN EXISTING BRICK TO REMAIN NEW BRIDGE BETWEEN LIBRARY AND GARAGE NEW METAL PANEL CLADDING TO MATCH EXISTING FASCIA EXISTING DOORS TO REMAIN NEW BRICK TO MATCH EXISTING EXISTING BRICK TO REMAIN EXISTING METAL CLADDING TO REMAIN NEW ALUMINUM CURTAIN WALL, COLOR TO MATCH EXISTING NEW LOW-SLOPE ROOF WITH ALUMINUM FASCIA TO MATCH EXISTING FIRST LEVEL 100'-0" SECOND LEVEL 118'-0" ROOF PEAK 151'-9" NEW BRICK TO MATCH EXISTING EXISTING GREEN METAL PANEL NEW ALUMINUM CURTAIN WALL, COLOR TO MATCH EXISTING EXISTING STANDING SEAM METAL ROOF EXISTING GREY METAL FASCIA NEW NORTH ENTRANCE FACING MAIN STREETEXISTING ALUMINUM STOREFRONT WINDOWS 36'-1"EXISTING BRICK NEW LOW-SLOPE ROOF WITH ALUMINUM FASCIA TO MATCH EXISTING NEW METAL PANEL CLADDING COLUMN WRAPSNEW CAFE WITH PATIO AND METAL AWNING NEW AWNING, COLOR TO MATCH EXISTING METAL WALL PANELS HORIZ. ALUMINUM TUBE SUN SHADES FIRST LEVEL 100'-0" SECOND LEVEL 118'-0" ROOF PEAK 151'-9" EXISTING ALUMINUM STOREFRONT WINDOWS EXISTING STANDING SEAM METAL ROOF TO REMAIN EXISTING BRICK TO REMAIN EXISTING METAL CLADDING TO REMAIN EXISTING LOUVERS TO REMAIN NEW BRIDGE BETWEEN LIBRARY AND GARAGE TO MATCH EXISTING NEW BRICK SCREEN NEW DRIVE-UP BOOK DROP WINDOW EXISTING DOOR TO REMAINNEW SOUTH ENTRANCE NEW METAL PANEL CLADDING TO MATCH EXISTING FASCIA NEW METAL PANEL CLADDING TO MATCH EXISTING FASCIA NRE BRICK TO MATCH EXISTING NEW TRASH ENCLOSURE WITH GATE NEW LOADING DOCK DOOR FIRST LEVEL 100'-0" SECOND LEVEL 118'-0" ROOF PEAK 151'-9" NEW BRICK TO MATCH EXISTING NEW ALUMINUM CURTAIN WALL, COLOR TO MATCH EXISTING NEW LOW-SLOPE ROOF WITH ALUMINUM FASCIA TO MATCH EXISTING NEW METAL PANEL CLADDING COLUMN WRAPS NEW BRIDGE FROM GARAGE TO LIBRARY NEW ALUMINUM CURTAIN WALL, COLOR TO MATCH EXISTING EXISTING STANDING SEAM METAL ROOF TO REMAIN NEW METAL PANEL CLADDING COLUMN WRAPS NEW BRICK TO MATCH EXISTING NEW ALUMINUM CURTAIN WALL, COLOR TO MATCH EXISTING NEW AWNING, COLOR TO MATCH EXISTING METAL WALL PANELS NEW METAL PANEL CLADDING COLUMN WRAPS NEW LOW-SLOPE ROOF WITH ALUMINUM FASCIA TO MATCH EXISTING NEW MECHANICAL MEZZANINE, METAL WALL PANEL TO MATCH EXISTING FASCIA NEW METAL PANEL CLADDING TO MATCH EXISTING FASCIA NEW WALK-UP BOOK DROPS NEW AWNING, COLOR TO MATCH EXISTING METAL WALL PANELS HORIZ. ALUMINUM TUBE SUN SHADES 3/16/2020 5:07:54 PM CARMEL CLAY PUBLIC LIBRARY RENOVATION │ PROPOSED LIBRARY ELEVATIONS© 2019 RATIO │ 2020-02-12 18104.0001/16" = 1'-0" BZA-2 3 LIBRARY EAST ELEVATION 1/16" = 1'-0"BZA-2 2 LIBRARY NORTH ELEVATION 1/16" = 1'-0"BZA-2 4 LIBRARY SOUTH ELEVATION 1/16" = 1'-0"BZA-2 1 LIBRARY WEST ELEVATION BRICK SCREEN WALL PROVIDES VISUAL SCREENING OF MECHANICAL CHILLERS, ELECTRICAL TRANSFORMER, ELECTRIC METER AND GAS METER REVISED 05/14/2020 10/07/20 GARAGE GROUND TIER 99'-7" GARAGE SECOND TIER 110'-11" GARAGE THIRD TIER 121'-3" PERFORATED METAL SCREEN OVER CAST-IN-PLACE CONCRETE STRUCTURE, TWO COLORS (LIGHT AND DARK) BRICK BASE TO MATCH EXISTING LIBRARYALUMINUM STOREFRONT ENTRANCE SYSTEM NEW METAL PANEL CLADDING TO MATCH EXISTING FASCIA BRICK STAIR / ELEVATOR ENCLOSURE TO MATCH EXISTING LIBRARY PEDESTRIAN BRIDGE TO LIBRARY ADDITIONAL GLASS ADDED TO IMPROVE VISIBILITY TO SOUTH STAIR PER BZA REQUEST SOUTH STAIR ENCLOSURE AT TOP LEVEL BRICK BASE TO MATCH EXISTING LIBRARY PERFORATED METAL SCREEN OVER CAST- IN-PLACE CONCRETE STRUCTURE, TWO COLORS (MEDIUM AND DARK) EGRESS DOOR WITH GLASS INFILL ADDITIONAL GLASS ADDED TO IMPROVE VISIBILITY TO SOUTH STAIR PER BZA REQUEST SOUTH STAIR ENCLOSURE AT TOP LEVEL NORTH STAIR/ELEVATOR AND PEDESTRIAN BRIDGE (BEYOND)4'-0" 24'-0 1/2"28'-0 1/2"38'-4"GARAGE GROUND TIER 99'-7" GARAGE SECOND TIER 110'-11" GARAGE THIRD TIER 121'-3" PEDESTRIAN BRIDGE TO LIBRARY PERFORATED METAL SCREEN OVER CAST-IN-PLACE CONCRETE STRUCTURE, TWO COLORS (LIGHT AND DARK) BRICK BASE TO MATCH EXISTING LIBRARY ENTRY ALUMINUM STOREFRONT ENTRANCE SYSTEM NEW METAL PANEL CLADDING TO MATCH EXISTING LIBRARY FASCIA BRICK BASE TO MATCH EXISTING LIBRARY6'-4 1/2"10'-4" 7'-4" 4'-0" 27'-7 1/2"38'-4"GARAGE GROUND TIER 99'-7" GARAGE SECOND TIER 110'-11" GARAGE THIRD TIER 121'-3" PERFORATED METAL SCREEN OVER CAST-IN-PLACE CONCRETE STRUCTURE, TWO COLORS (MEDIUM AND DARK) BRICK BASE TO MATCH EXISTING LIBRARY ENTRY/EXITENTRY/EXIT ACCESS DRIVE PEDESTRIAN BRIDGE TO LIBRARY STAIR/ELEVATOR ENCLOSURE 8'-0 1/2"15'-9" 12'-3 1/2"28'-0 1/2" 10'-3 1/2"7/7/2020 5:40:04 PM CARMEL CLAY PUBLIC LIBRARY RENOVATION │ GARAGE EXTERIOR ELEVATIONS© 2019 RATIO │ 2020-02-12 18104.0001" = 10'-0"BZA-3 5 GARAGE WEST EXTERIOR ELEVATION 1" = 10'-0" BZA-3 8 GARAGE SOUTH EXTERIOR ELEVATION 1" = 10'-0"BZA-3 1 GARAGE NORTH EXTERIOR ELEVATION 1" = 10'-0"BZA-3 2 GARAGE EAST EXTERIOR ELEVATION 06-01-2020 - SHEET REVISED PER BZA COMMENTS 10/07/20 9'-6"6" METAL COPING CAP TO MATCH EXISTING BUIDLING OPERABLE METAL GATES (POST MOUNTED) GRADE 26'-0" FIRST LEVEL 100'-0" METAL COPING CAP TO MATCH EXISTING BUIDLING BRICK VENEER OVER CMU BLOCK TO MATCH EXISTING BUIDLING GRADE6"9'-9" METAL COPING CAP TO MATCH EXISTING BUIDLING BRICK VENEER OVER CMU BLOCK TO MATCH EXISTING BUIDLING OPERABLE METAL GATES (POST MOUNTED) GRADE9'-9" 6"10'-0"5/14/2020 11:30:07AMCARMEL CLAY PUBLIC LIBRARY RENOVATION │ EXTERIOR DETAILS© 2019 RATIO │ 2020-02-1218104.0001/4" = 1'-0"BZA-4 9 DUMPSTER ENCLOSURE-SOUTH ELEVATION 1/4" = 1'-0"BZA-4 11 DUMPSTER ENCLOSURE-NORTH ELEVATION 1/4" = 1'-0"BZA-4 10 DUMPSTER ENCLOSURE-EAST/WEST ELEVATION IMAGES ABOVE ARE PRECEDENT IMAGES FOR THE PARKING GARAGE FACADE PERFORATED METAL PANELS. THE INTENT IS FOR THE METAL PANELS TO PROVIDE VISUAL SCREENING AND PASSIVE VENTILATION. IMAGES ABOVE IS AN EXAMPLE OF METAL GATE. 05-14-2020 - SHEET ADDED 10/07/20