HomeMy WebLinkAboutA008 - General Notes and InformationA. CONTRACTOR IS RESPONSIBLE TO CONFORM WITH APPLICABLE FEDERAL, STATE, AND LOCAL CODES AND REGULATIONS
INCLUDING APPLICABLE ORDINANCES AND REFERENCED STANDARDS.
B. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO SUBMITTING A BID OR
BEGINNING ANY WORK. CONDITIONS FOUND TO BE IN VARIANCE FROM THE INFORMATION IN THE DRAWINGS OR PROJECT
MANUAL SHALL BE SUBMITTED TO THE ARCHITECT IN WRITING FOR CLARIFICATION.
C. KEYNOTES ARE MEANT AS A GENERAL GUIDE FOR TYPICAL LOCATIONS. CONTRACTOR TO PERFORM FULL EXTENT OF WORK
REQUIRED TO ACCOMPLISH DESIGN INTENT. THE ABSENCE OF A KEYNOTE DOES NOT ABSOLVE THE CONTRACTOR FROM
PROVIDING THE FEATURE GRAPHICALLY INDICATED ON THE DRAWINGS.
D. SPECIFIC WORK ITEMS SHALL BE COORDINATED AND INTERFACED WITH ALL OTHER TRADES TO ALLOW FOR NEW
CONSTRUCTION AND COMPLETE INSTALLATION AS REQUIRED TO ACCOMPLISH DESIGN INTENT.
E. REFER TO DRAWINGS OF EACH TRADE OR DISCIPLINE FOR ADDITIONAL GENERAL NOTES AND INFORMATION, INCLUDING
CIVIL/SITE DEVELOPMENT, ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL.
F. CONTRACTOR IS RESPONSIBLE FOR ALL WORK IDENTIFIED ON ALL DRAWINGS AND INFORMATION IN THE PROJECT MANUAL,
AS A COMPLETE PROJECT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE SPECIFIC SCOPE OF WORK
FOR ANY SUBCONTRACTORS FOR THIS PROJECT.
G. FIELD VERIFY ACTUAL LOCATIONS OF EXISTING UNDERGROUND UTILITIES, STRUCTURES, WATER LINES, STORM AND
SANITARY LINES, GAS LINES, ELECTRICAL CONDUIT, AND OTHER UNDERGROUND UTILITIES PRIOR TO PERFORMING
EARTHWORK, EXCAVATION, OR UTILITY WORK. ENGAGE THE SERVICES OF A PRIVATE UTILITY LOCATE COMPANY IF
NECESSARY TO COMPLETELY LOCATE EXISTING UNDERGROUND UTILITIES AND STRUCTURES.
H. LOCATION OF ALL TEMPORARY FACILITIES SHALL BE COORDINATED WITH OWNER AND ARCHITECT PRIOR TO MOBILIZATION
ON-SITE, INCLUDING BUT NOT LIMITED TO TEMPORARY STAGING AREA, MATERIAL STORAGE AREA, ACCESS DRIVE(S), PARKING
AREA, TOPSOIL STOCKPILE AREA, WASTE DISPOSAL AREA, FIELD OFFICES AND TEMPORARY FACILITIES, JOB SIGN, AND
TEMPORARY FENCING.
I. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL MISCELLANEOUS BLOCKING REQUIRED FOR INSTALLATION OF ALL BUILDING
COMPONENTS, INCLUDING BUT NOT LIMITED TO FURNISHINGS, FIXTURES, EQUIPMENT, HARDWARE, BRACKETS, AND OWNER-
PROVIDED EQUIPMENT. CONTRACTOR SHALL COORDINATE SPECIFIC REQUIREMENTS ASSOCIATED WITH EACH TRADE AND
WITH OWNER'S REPRESENTATIVE.
J. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL MISCELLANEOUS WOOD AND METAL TRIM, FLASHING, CLIP ANGLES,
ANCHORS, SUPPORTS, AND CLOSURE TRIM REQUIRED TO PROVIDE A COMPLETE, UNIFORM, AND WEATHERTIGHT ASSEMBLY
AS REQUIRED TO ACCOMPLISH THE DESIGN INTENT.
K. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS. CONTRACTOR
SHALL PROVIDE AND INSTALL ALL ACCESSORY COMPONENTS AS REQUIRED TO FULLY COMPLY WITH MANUFACTURER'S
RECOMMENDATIONS.
L. CONTRACTOR SHALL PROVIDE ACCESS DOORS IN ALL WALLS AND CEILINGS WHERE SERVICE OR ADJUSTMENT TO
MECHANICAL, PLUMBING, FIRE PROTECTION OR ELECTRICAL ITEMS MAY BE REQUIRED. ACCESS DOORS SHALL BE OF AN
APPROPRIATE SIZE REQUIRED FOR EACH APPLICATION. WHERE APPLICABLE, ACCESS DOORS SHALL MATCH THE FIRE
RATING OF THE WALL ASSEMBLY.
M. WHERE DISCREPANCIES EXIST IN THE CONTRACT DOCUMENTS INCLUDING DISCREPANCIES BETWEEN DRAWINGS AND
PROJECT MANUAL OR DRAWINGS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS, CONTRACTOR SHALL REQUEST
CLARIFICATION IN WRITING FROM ARCHITECT. THE CONTRACTOR SHALL NOT ASSUME ANY ITEM TAKES PRECEDENCE OVER
THE OTHER. ANY ACTION THE CONTRACTOR MAKES PRIOR TO NOTIFICATION IN WRITING SHALL BE SOLELY AT THE
CONTRACTOR'S RISK.
N. CONTRACTOR SHALL SEAL ALL PENETRATIONS IN EXTERIOR WALL AND ROOF ASSEMBLIES WITH APPROPRIATE JOINT
SEALANT(S) AND FLASHING(S) TO MAINTAIN A WEATHERTIGHT AND AIRTIGHT BUILDING ENVELOPE. ALL JOINTS AND
PENETRATIONS SHALL BE SEALED, GASKETED, OR WEATHER-STRIPPED TO MINIMIZE AIR LEAKAGE, INCLUDING THE
FOLLOWING:
a. JOINTS AROUND FENESTRATION AND DOOR FRAMES.
b. JUNCTIONS BETWEEN WALLS AND FOUNDATIONS, BETWEEN WALLS AT BUILDING CORNERS, BETWEEN WALLS AND
FLOORS OR ROOFS, AND BETWEEN WALLS AND ROOF OR WALL PANELS.
c. OPENINGS AT PENETRATIONS OF UTILITY SERVICES THROUGH ROOFS, WALLS, AND FLOORS.
d. JOINTS, SEAMS, AND PENETRATIONS OF VAPOR RETARDERS.
e. ALL OTHER OPENINGS IN THE BUILDING ENVELOPE.
O. COORDINATE WITH OTHER CONSTRUCTION ACTIVITIES AND CONSTRUCTION SEQUENCING WITH OTHER PROJECT(S) AND
WORK BEING PERFORMED CONCURRENTLY ON-SITE.
P. BUILDING ELEVATION 100'-0" EQUALS SITE ELEVATION 826.58.
Q. CONTRACTOR TO PROTECT ALL ITEMS WITHIN THE CONSTRUCTION LIMITS (INCLUDING SITE ELEMENTS) THAT ARE
DESIGNATED TO REMAIN; ITEMS DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT SHALL BE
REPAIRED OR REPLACED TO ORIGINAL CONDITION.
R. ALL PENETRATIONS AND JOINTS IN FIRE-RATED WALL ASSEMBLIES AND FLOOR/CEILING ASSEMBLIES SHALL BE SEALED WITH
THE FIRESTOPPING SYSTEM OR FIRE-RESISTIVE JOINT SYSTEM WHICH IS THE MOST APPROPRIATE FOR THE SPECIFIC
APPLICATION BASED ON THE TYPE OF ASSEMBLY AND TYPE OF PENETRATING ELEMENT. SYSTEMS SHALL BE U.L.-LISTED
FOR EACH APPLICATION.
S. ALL VERTICAL FENESTRATION (OPERABLE AND FIXED GLAZED ASSEMBLIES) SHALL BE LABELED BY THE MANUFACTURER
WITH U-FACTOR, SHGC RATING, SAFETY RATING, AND FIRE-RESISTANCE RATING, WHERE APPLICABLE. WINDOWS AND
DOORS SHALL BE CERTIFIED AS MEETING AIR LEAKAGE REQUIREMENTS PER NFRC 400.
T. THESE DRAWINGS SHALL NOT BE SCALED TO OBTAIN DIMENSIONS. IF THE DIMENSIONS CANNOT BE DETERMINED BY THE
INFORMATION GIVEN, CONTRACTOR SHALL REQUEST CLARIFICATION FROM THE ARCHITECT. ALL DIMENSIONS ARE TO FACE
OF STUD, FACE OF CMU, OR FACE OF CONCRETE, UNLESS NOTED OTHERWISE. CEILING HEIGHT DIMENSIONS ARE FROM
FINISHED FLOOR TO FACE OF FINISHED CEILING MATERIALS, UNLESS NOTED OTHERWISE.
A5.1
KEYNOTE TARGET
DRAWING TITLE
SYMBOL
#
ROOM
NAME ROOM NAME
ROOM NUMBER
DESCRIPTION
X WALL TYPE TARGET BUILDING SECTION TARGET
SECTION NUMBER
SHEET NUMBER
VERTICAL ELEVATION BUBBLE
NORTH ARROW
DOOR MARK TARGET
X
SHT DETAIL TARGET
XXXXXXXX
SHEET NUMBER
DETAIL NUMBER
X
SHTSHEET NUMBER
SECTION NUMBER
WALL SECTION TARGET
INTERIOR ELEVATION TARGET
WINDOW TARGETX
EXTERIOR ELEVATION TARGETELEVATION NUMBER
SHEET NUMBER
DRAWING SCALE
#
XXX
SCALE:
XXX DRAWING NAME
DETAIL NUMBER
3
X
SHT
X
SHT
NORTH
X
SHEET
NUMBER
NUMBER
ELEVATION X
SHT
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
PROJECT SITE
210 VETERANS WAY
CARMEL, IN 46032 DLZ INDIANA, LLCDRAWING NUMBERPROJECT NUMBERDATE:APPRV'D:DESIGNED:DRAWN:CHK'D:9/25/2020 2:54:39 PMC:\RevitBackups\2020\1963-1025-90_AdminBldg_Arch_zakkaz11.rvtG1.1ACOMMUNITY BUILDINGCARMEL CLAY1963-1025-90ZJFHWSHWSSEPTEMBER 18, 2020ZJFGENERAL NOTES AND INFORMATION, SET AGENERALCARMELINDIANABID PACKAGE 2Symbols
General Notes
Location Map Sheet Index
NUMBER SHEET NAME
GENERAL
G1.0A TITLE SHEET, SET A
G1.1A GENERAL NOTES AND INFORMATION, SET A
G1.2 CODE COMPLIANCE PLANS
G1.3 CODE ANALYSIS
G1.4 ABBREVIATIONS AND ADA MOUNTING HEIGHTS
SITE DEVELOPMENT
SD0.3 CITY OF CARMEL RIGHT OF WAY PAVING POLICY
SD0.4 CITY OF CARMEL CONCRETE CURB POLICY
SD3.7 STORM WATER POLLUTION PREVENTION PLAN
SD4.1 PLANTING PLAN
SD5.2 SITE DETAILS - 1
SD5.3 SITE DETAILS - 2
ARCHITECTURE
A2.1 FIRST FLOOR PLAN
A2.2 SECOND FLOOR PLAN
A2.3 THIRD FLOOR PLAN
A2.4 FOURTH FLOOR PLAN
A2.5 ENLARGED FOURTH FLOOR GALLERY PLAN
A3.1 ROOM FINISH AND PARTITION SCHEDULES
A3.2 DOOR AND FRAME SCHEDULE & ELEVATIONS
A3.3 DOOR DETAILS - 1
A3.4 DOOR DETAILS - 2
A3.5 WINDOW ELEVATIONS
A3.6 EXTERIOR WINDOW 3D VIEWS
A3.7 WINDOW DETAILS - 1
A3.8 WINDOW DETAILS - 2
A3.9 WINDOW DETAILS - 3
A3.10 WINDOW DETAILS - ALTERNATE
A4.1 ROOF PLAN
A4.2 ROOF DETAILS - 1
A4.3 ROOF DETAILS - 2
A4.4 ROOF DETAILS - 3
A4.5 ROOF DETAILS - 4
A5.1 EAST AND WEST EXTERIOR ELEVATIONS
A5.2 NORTH AND SOUTH EXTERIOR ELEVATIONS
A5.3 EXTERIOR ELEVATIONS
A5.4 ALTERNATE EXTERIOR ELEVATIONS
A6.1 E-W BUILDING SECTIONS - 1
A6.2 E-W BUILDING SECTIONS - 2
A6.3 E-W BUILDING SECTIONS - 3
A6.4 N-S BUILDING SECTIONS - 1
A6.5 N-S BUILDING SECTIONS - 2
A6.6 N-S BUILDING SECTIONS - 3
A7.1 WALL SECTIONS - 1
A7.2 WALL SECTIONS - 2
A7.3 WALL SECTIONS - 3
A7.4 WALL SECTIONS - 4
A7.5 WALL SECTIONS - 5
A7.6 WALL SECTIONS - 6
A7.7 SECTION DETAILS AND FIRESTOPPING DETAILS
A7.8 STONE, METAL, AND GFRC TRIM PROFILES
A8.1 CASEWORK PLANS, ELEVATIONS, AND DETAILS - FIRST AND SECOND FLOOR
A8.2 CASEWORK PLANS, ELEVATIONS, AND DETAILS - SECOND FLOOR
A8.3 ENLARGED TOILET PLANS AND INTERIOR ELEVATIONS - FIRST FLOOR
A8.4 ENLARGED TOILET PLANS AND INTERIOR ELEVATIONS - SECOND FLOOR
A8.5 ENLARGED TOILET PLANS AND INTERIOR ELEVATIONS - SECOND, THIRD,
AND FOURTH FLOORS
A9.1 INTERIOR ELEVATIONS - FIRST FLOOR
A9.2 INTERIOR ELEVATIONS - THIRD AND FOURTH FLOOR
A10.1 FIRST FLOOR REFLECTED CEILING PLAN
A10.1A FIRST FLOOR REFLECTED CEILING PLAN - ALTERNATE
A10.2 SECOND FLOOR REFLECTED CEILING PLAN
A10.2A SECOND FLOOR REFLECTED CEILING PLAN - ALTERNATE
A10.3 THIRD FLOOR REFLECTED CEILING PLAN
A10.4 FOURTH FLOOR REFLECTED CEILING PLAN
A11.1 FLOOR PLAN DETAILS
A11.2 FLOOR PLAN DETAILS - THIRD FLOOR AND FOURTH FLOOR GALLERY
A12.1 STAIR ST11 ENLARGED PLANS, SECTIONS, AND DETAILS
A12.2 STAIR ST21 ENLARGED PLANS, SECTION, AND DETAILS
A12.3 ELEVATOR ENLARGED PLAN, ELEVATIONS, AND DETAILS
A13.1 FIRST FLOOR FINISH PLAN
A13.2 SECOND FLOOR FINISH PLAN
A13.3 THIRD FLOOR FINISH PLAN
A13.4 FOURTH FLOOR FINISH PLAN
STRUCTURAL
S0.1 GENERAL NOTES
S0.2 GENERAL NOTES & ABBRIVIATIONS
S1.0 FOUNDATION PLAN
S1.1 SECOND FLOOR FRAMING PLAN
S1.2 THIRD FLOOR FRAMING PLAN
S1.3 FOURTH FLOOR FRAMING PLAN
S1.4 ROOF FRAMING PLAN
S2.0 ENLARGED FRAMING PLANS
S3.0 TYPICAL FOUNDATION DETAILS & SECTIONS
S4.0 TYPICAL MASONRY DETAILS & SECTIONS
S4.1 TYPICAL MASONRY DETAILS & SECTIONS
S5.0 TYPICAL FRAMING DETAILS & SECTIONS
S5.1 TYPICAL FRAMING DETAILS & SECTIONS
S5.2 FRAMING DETAILS & SECTIONS
S5.3 FRAMING DETAILS & SECTIONS
S5.4 FRAMING DETAILS & SECTIONS
S5.5 FRAMING DETAILS & SECTIONS
S5.6 FRAMING DETAILS & SECTIONS
S5.7 FRAMING DETAILS & SECTIONS
TELEPHONE
AT&T -DISTRIBUTIO
240 N. MERIDIAN STREET, ROOM 1791
INDIANAPOLIS, IN 46204
PHONE: (317) 610-5422
BRAD BAILEY
FIBEROPTIC
CARMEL CLAY COMMUNICATIONS CENTER
31 1ST AVENUE NW
CARMEL, IN 46032
PHONE: (317) 571-2590
TODD LUCKOSKI
FIBEROPTIC
CENTURYLINK
100 S. CINCINNATI AVENUE, SUITE 1200
TULSA, OK 74103
PHONE: (918) 547-0547
KENDALL WILLIAMS-ZETINA
SANITARY SEWERS
CITY OF CARMEL UTILITIES
SANITARY SEWER SYSTEM
30 WEST MAIN STREET, SUITE 200
CARMEL, IN 46032
PHONE: (317) 571-2443
JOE FAUCETT
GAS
VECTREN
16000 ALLISONVILLE ROAD
NOBLESVILLE, IN 46060
PHONE: (317) 776-5590
CHAD MILLER
WATER
CITY OF CARMEL UTILITIES
30 WEST MAIN STREET, SUITE 200
CARMEL, IN 46032
PHONE: (317) 571-2443
STEVE COOK
ELECTRIC
DUKE ENERGY
PHONE: (317) 776-5305
CHRISTINA GIROD
STORMWATER
CITY ENGINEER
CARMEL CITY HALL, FIRST FLOOR
ONE CIVIC SQUARE
CARMEL, IN 46032
PHONE: (317) 571-2441
JEREMY KASHMAN
TRANSPORTATION / TRAFFIC LIGHTS
CITY OF CARMEL STREET DEPARTMENT
31 1ST AVENUE NW
CARMEL, IN 46032
PHONE: (317) 571-2590
TODD LUCKOSKI NO.REVISIONDATE1ADD. 0109/20SUBJECT REAL ESTATE DESCRPTION
INSTRUMENT NUMBER 2016029856
TAX PARCEL NUMBER 16-09-25-16-05-004.000
FIREMAN'S MUSEUM
BEGINNING 32 RODS 7 FEET 1 INCH SOUTH AND 24 RODS 1 FEET
6 INCHES WEST OF THE NORTHEAST COMER OF THE
SOUTHEAST QUARTER OF SECTION 25 TOWNSHIP 18 NORTH
RANGE 3 EAST IN HAMILTON COUNTY, INDIANA AND RUN SOUTH
218 FEET, THENCE WEST 165 FEET, THENCE NORTH 218 FEET,
THENCE EAST 165 FEET TO THE PLACE OF BEGINNING.
LEGAL DESCRIPTION
ZONING DISTRICT: C2
SETBACK DISTANCES: N/A
TOTAL SITE DISTURBANCE: 35,785 SQUARE FEET
BUILDING COVERAGE TO SITE AREA RATIO: 1:1.97 (50.74%)
REQUIRED PARKING SPACES: 0
FIBEROPTIC
ZAYO BANDWIDTH
9209 CASTLEGATE DRIVE
INDIANAPOLIS, IN 46256
PHONE: (765) 341-1199
WAYLON HIGGINS
CABLE
SPECTRUM
3030 ROOSEVELT AVENUE
INDIANAPOLIS, IN 46218
PHONE: (317) 429-6691
JASON KIRKMAN
CABLE
COMCAST CABLE (INDIANAPOLIS)
PHONE: (317) 752-6569
SCOTT EVANS
NUMBER SHEET NAME
GENERAL
G1.0B TITLE SHEET, SET B
G1.1B GENERAL NOTES AND INFORMATION, SET B
FIRE PROTECTION
FP2.1 FIRST FLOOR FIRE PROTECTION PLAN
FP2.2 SECOND FLOOR FIRE PROTECTION PLAN
FP2.3 THIRD FLOOR FIRE PROTECTION PLAN
FP2.4 FOURTH FLOOR FIRE PROTECTION PLAN
PLUMBING
P2.0 UNDERFLOOR PLUMBING PLAN
P2.1 FIRST FLOOR PLUMBING PLAN
P2.2 SECOND FLOOR PLUMBING PLAN
P2.3 THIRD FLOOR PLUMBING PLAN
P2.4 FOURTH FLOOR PLUMBING PLAN
P2.5 ROOF PLUMBING PLAN
P3.1 GAS ISOMETRIC
P3.2 PLUMBING ISOMETRICS
P4.1 PLUMBING ENLARGED PLANS
P4.2 ENLARGED MECHANICAL ROOM PLAN
P5.1 PLUMBING DETAILS
P6.1 PLUMBING SCHEDULES
MECHANICAL
M0.1 GENERAL INFORMATION
M2.1 FIRST FLOOR HVAC PLAN - BASE BID
M2.1A FIRST FLOOR HVAC PLAN - ALTERNATE BID
M2.2 SECOND FLOOR HVAC PLAN - BASE BID
M2.2A SECOND FLOOR HVAC PLAN - ALTERNATE BID
M2.3 THIRD FLOOR HVAC PLAN
M2.4 FOURTH FLOOR HVAC PLAN
M2.5 MECHANICAL ROOF PLAN
M3.1 FIRST FLOOR MECHANICAL PIPING PLAN
M3.2 SECOND FLOOR MECHANICAL PIPING PLAN
M3.3 THIRD FLOOR MECHANICAL PIPING PLAN
M3.4 FOURTH FLOOR MECHANICAL PIPING PLAN
M5.1 MECHANICAL ISOMETRICS AND SECTIONS
M6.1 MECHANICAL DETAILS - I
M6.2 MECHANICAL DETAILS - II
M7.1 MECHANICAL EQUIPMENT SCHEDULES
M8.1 CONTROL SCHEMATICS - I
M8.2 CONTROLS SCHMATICS - II
M8.3 CONTROLS SCHMATICS - III
ELECTRICAL
E0.2 ELECTRICAL GENERAL INOTES
E2.1 FIRST FLOOR POWER PLAN
E2.2 SECOND FLOOR POWER PLAN
E2.3 THIRD FLOOR POWER PLAN
E2.4 FOURTH FLOOR POWER PLAN
E2.5 FIRST FLOOR POWER CONNECTION PLAN HVAC/PLUMBING EQUIPMENT
E2.6 SECOND FLOOR POWER CONNECTION PLAN HVAC/PLUMBING EQUIPMENT
E2.7 THIRD FLOOR POWER CONNECTION PLAN HVAC/PLUMBING EQUIPMENT
E2.8 FOURTH FLOOR POWER CONNECTION PLAN HVAC/PLUMBING EQUIPMENT
E2.9 ENLARGED PLAN - ELECTRICAL PLANS - ELECTRICAL AND IT ROOMS
E3.1 FIRST FLOOR LIGHTING PLAN
E3.1A FIRST FLOOR LIGHTING PLAN - ALTERNATE
E3.2 SECOND FLOOR LIGHTING PLAN
E3.2A SECOND FLOOR LIGHTING PLAN - ALTERNATE
E3.3 THIRD FLOOR LIGHTING PLAN
E3.4 FOURTH FLOOR LIGHTING PLAN
E3.5 STAIR ST11 LIGHTING
E4.1 FIRST FLOOR SYSTEMS PLAN
E4.2 SECOND FLOOR SYSTEMS PLAN
E4.3 THIRD FLOOR SYSTEMS PLAN
E4.4 FOURTH FLOOR SYSTEMS PLAN
E5.1 ELECTICAL DETAILS
E5.2 ELECTICAL DETAILS
E5.3 ELECTICAL DETAILS
E5.4 ELECTICAL DETAILS
E5.5 ELECTICAL DETAILS
E5.6 ELECTICAL DETAILS
E5.7 ELECTICAL DETAILS
E5.8 ELECTICAL DETAILS
E5.9 ELECTRICAL DETAILS
E6.1 CATV RISER DIAGRAM AND TRANSFORMER SCHEDULE
E6.2 CONDUIT AND CABLE SCHEDULE - POWER (1 OF 2)
E6.3 CONDUIT AND CABLE SCHEDULE - POWER (2 OF 2)
E6.4 CONDUIT AND CABLE SCHEDULE (COMMUNICATIONS)
E6.5 LIGHT FIXTURE SCHEDULE
E7.1 PANELBOARD SCHEDULES
E7.2 PANELBOARD SCHEDULES
E7.3 PANELBOARD SCHEDULES
E7.4 PANELBOARD SCHEDULES
E7.5 PANELBOARD SCHEDULES
E8.1 ONE-LINE DIAGRAM
DRAWING SET A DRAWING SET B
SITE INFORMATION
Utility Contacts