Loading...
HomeMy WebLinkAboutC902 - STORMWATER POLLUTION PREVENTION NOTESCOPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. SHEET TITLE SHEET NUMBER SHEET ISSUE PROJECT NO. SEAL | DATE 18104.00 Owner Mechanical / Electrical Engineer Civil Engineer Architect 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 RATIO 55 4TH Ave. SE Carmel, IN 46032 317-814-3900 CARMEL CLAY PUBLIC LIBRARY Carmel Clay Public Library Renovation 55 4th Ave SE Carmel, IN 46032 Structural Engineer 10 Shoshone Drive Carmel, IN 46032 317-818-1912 CE Solutions 1344 South Rangeline, Suite 202 Carmel, IN 46032 317-344-8044 KBSO Consulting, LLC 530 E. Ohio Street, Suite G Indianapolis, IN 46204 317-655-7777 Project Number 191-706 Civil & Environmental Consultants, INC Technology Design Garage Consultant 1650 East 49th Street Indianapolis, IN 46205 317-536-8000 Design 27 6602 East 75th Street, Suite 210 Indianapolis, IN 46250 317-842-6890 Walker Consultants NOT FOR CONSTRUCTION FOR REFERENCE ONLY DESIGN DEVELOPMENT ESTIMATE PACKAGE 1 4/13/2020 TAC COMMENT RESPONSE2 5/14/2020 95% CD PACKAGE3 6/25/2020 TAC COMMENT RESPONSE4 7/7/2020 100% CD PACKAGE5 7/14/2020 ADDENDUM #16 8/3/2020 ADDENDUM #27 8/11/2020 TAC COMMENT RESPONSE 9/14/20208 C902 STORMWATER POLLUTION PREVENTION NOTES (13) MATERIAL HANDLING AND SPILL PREVENTION (4) POST CONSTRUCTION STORMWATER QUALITY (3) STORMWATER QUALITY IMPLEMENTATION (1) POTENTIAL LANDUSE POLLUTANTS EROSION CONTROL MAINTENANCE REQUIREMENTS K. MONITORING AND MAINTENANCE GUIDELINES (2) LOCATION, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION DETAILS OF EACH STORMWATER QUALITY MEASURE (10) LOCATION OF PROPOSED SOIL STOCKPILES (12) EROSION CONTROL MEASURES FOR INDIVIDUAL BUILDING LOTS SWPPP FOR POST CONSTRUCTION- CITY OF CARMEL (3) ESTIMATED PEAK DISCHARGE (7) POTENTIAL CONSTRUCTION POLLUTANTS (2) RECEIVING WATERS (1) HYDROLOGIC UNIT CODE SWPPP FOR CONSTRUCTION SITES- CITY OF CARMEL (6) SOIL MAP (5) LOCATION WHERE STORMWATER MAY BE DIRECTLY DISCHARGED INTO GROUNDWATER (4) LOCATION WHERE SPECIFIC POINTS OF STORMWATER DISCHARGE LEAVING THE SITE (8) TEMPORARY & PERMANENT STORMWATER QUALITY MEASURES C. CONCENTRATED FLOW SEDIMENT CONTROL B. SHEET FLOW SEDIMENT CONTROL A. CONSTRUCTION ENTRANCE INFORMATION (11-B) PERMANENT SURFACE STABILIZATION (11-A) TEMPORARY SURFACE STABILIZATION DESCRIPTION MEASURES: D. INLET PROTECTION LOCATIONS AND SPECS. E. RUNOFF CONTROL MEASURES F. OUTLET PROTECTION SPECIFICATIONS G. GRADE STABILIZATION MEASURES H. STORMWATER QUALITY DETAILS I. TEMPORARY SURFACE STABILIZATION J. PERMANENT SURFACE STABILIZATION (9) GENERAL CONSTRUCTION SEQUENCE (5) POST CONSTRUCTION MAINTENANCE GUIDELINES (14) CONTACT INFORMATION