Loading...
HomeMy WebLinkAboutL200 OVERALL PLANTING PLANSHEET 202A SHEET 202BSHEET 201 CARMEL FIRE STATION No. 41 SHEET 203 Firehouse Square Carmel, Indiana PREPARED FOR PROJECT NORTH © 2020 Anderson + Bohlander, LLC 1054 Virginia Ave, Suite 210 Indianapolis, Indiana 46201 www.andersonbohlander.com SCALE : ADLS Set 03/11/2020 REVISIONS No. Date Issue DRAWN BY: CHECKED BY: SHEET TITLE SHEET NUMBER CAR JDA OnXW East 1828 Central Avenue Indianapolis, IN 46202 R E G I S TER E DSTAT E OF I N D IA NALA21400024 LANDS CAPE AR C H ITECTC R A I G A.RO WE01 05/12/2020 Updates per Review 02 05/28/2020 Parking Islands/Transformers 03 07/13/2020 Bike Racks & Planting Revs 1" = 40'-0"20'-0"40'-0"80'-0"L200 PLANTING PLAN OVERALL NOTES - PLANTING PLAN Planting Plan - Overall01 1. Contractor shall import and distribute soil for all planting areas to average depth of 12" to achieve the grades as shown on the plans. Refer to Planting Soils Plan for detailed soil profile characteristics. Soil under existing trees & in tree protection areas to remain undisturbed, refer to Site Preparation Plan. 2. Sod limit line is approximate. Sod to limits of grading and construction related disturbance. Contractor responsible for restoration of any unauthorized disruption outside of designated construction area. 3. Contractor responsible for erosion control in all seeded and/or sodded areas. All disturbed areas are to be protected within 24 hours. Do not disturb more area than can be completed and protected within 24 hours. 4. Temporary fencing shall be installed around the lawn areas if the project is opened to the public before the lawn is established. 5. All existing trees within the project limits determined to be interfering with construction activity to be pruned by a certified arborist as directed by the Landscape Architect. 6. The General Contractor shall be responsible for replacing any existing trees that the Landscape Architect determines to have been damaged during construction, at no additional cost. 7. All bed lines are to be spade cut to a minimum depth of 3 inches unless otherwise shown on the plans. Curved bedlines are to be smooth and not segmented. Refer to Planting Bed Edge Condition, Detail 04, Sheet L7.06. 8. Contractor to restore 3" of shredded hardwood mulch to all areas of construction disturbance within existing landscape beds. Contractor to remove and dispose of all debris, stones and dirt clods 1" or larger. 9. Plants and other materials are quantified and summarized for the convenience of the Owner and jurisdictional agencies only. Confirm and install sufficient quantities to complete the work as drawn and specified. No additional payments will be made for materials required to complete the work as drawn and specified. 10. Refer to specifications for additional conditions, standards and notes. 11. Contractor responsible for initial planting of annuals in all planter pot locations. Plants to be seasonally appropriate to time of planting. Submit plant selection for review by Landscape Architect. 12. See Sheet L204 for Plant List. 10/14/20