Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S003 - 411FA
UP 19'-2" x 16'-4" 2 ID1 EXERCISE / BEDROOM 5 RECREATION BEDROOM #4 MEDIA MECH BATH #4 UNFINISHED STORAGE 4040 GW 36" H. TOPSUMP. EJECT. FURN. WATER HEATER WATER SOFTNER R.I. 2/6 4" RECESSED SLAB 4040 GW FUTURE WINE ROOM FULL LITE DOOR UNFINISHED SLOPED CEILING FOR STEAM SHOWER ACCESS PANEL IN WALL FOR STEAM UNIT MAINTENANCE DROPPED MECHANICAL BULKHEADCLIPPED CLG. AT STAIRS STEAM SHOWER SHOWER SEAT 2-2/0-6/8 UNFINISHED STEAM UNIT LOCATION WETBAR ROUGH-IN ONLY BEARING WALLFUTUREBULKHEAD WHENSPACE FINISHED42" V. 2/8 2/8 2/8 FLOOR DRAIN AS REQUIRED FOR STEAM UNIT DASHED WALLS ARE FUTURE 2/8 2/8 DROPPED MECHANICAL BULKHEAD CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Copyright © 2020 Wedgewood Building Co. LLC. Wedgewood Building Co., LLC32 First Street NECarmel, IN 46032317.669.6300www.wedgewoodbc.com9/16/2020 1:13:29 PM A9THE DUSING RESIDENCE411 1st Ave. Southeast, Carmel, INBASEMENT FLOOR INTERIOR FINISH ABL 1/4" = 1'-0"1 BASEMENT INTERIOR FINISH PLAN Rev.No. Date DescriptionBy Andrew Lund at 1:15 pm, Sep 16, 2020 10/15/20