HomeMy WebLinkAboutC300 Storm Water Poll. & Prev. Plan-C305THIS SHEET TO BE USED
FOR EROSION CONTROL ONLY.
PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL:
DOUG WAGNER
PHONE: (317) 770-1818
SET ON
FILTER
FABRIC
r FLTW era
.4 fT':• y�.y,7�,�. ��44:
`�" 6 resnf yi
NOSE CLAMP
WCOGE;''f SAKES
.
pump C1$c,YAAGE'
NOSE
NCIM ur`a-CNE 015C:M AAC- )+C5E PEUR c
FLAN vutw
,-s-
NCSE CAMP
�r
WC-SDEN ZTAKFE
GROUNO
PUMP DISCHARGZ
SIJIAFAC u:.•�' s
NIX
VIFILTE77ASHIr.
GROs-s-SECTTCN
N T.3_
FIGTj-P-E 7 FTL'ER BAG
DEWATERING FILTER BAG DETAIL
(TO BE USED WHEN PUMPING DIRTY WATER)
ANY DISCHARGE OF CONTAMINATED WATER DUE TO DEWATERING
SHALL OUTLET THROUGH EXISTING VEGETATION OR FILTER BAGS
THAT WILL NOT ADVERSELY IMPACT STORM WATER QUALITY.
LO
O
m
U
0)
c
m
d
a)
OF
0
o_
L D
M
U) = a)
U 2i 0_
j CO CV
C) 66
M
In It CA
2 N O
CD Lri
O U U
(9 L L
M M
U) 2: 2:
9+
a)�m
E -o
m a) -0
Z
_O O _O
IL 2 o_
SHORELINE INSTALLATION
1. FOR EASIER INSTALLATION, LOWER WATER FROM LEVEL A TO LEVEL B BEFORE INSTALLATION.
2. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION OF LIME,
FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED, DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPERSIDE DOWN.
3. BEGIN AT THE TOP OF THE SHORELINE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH
WITH APPROXIMATELY 12" (30 CM) OF EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR TIIEBLANKET
WTH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM)
PORTION OF BACK OVER SEED AND COMPACTED SOIL. SECURE OVER COMPACTED SOIL WITH A ROW OF
STAPLES/STAKES SPACED APPROXIMATELY 12' (30 CM) APART ACROSS THE WIDTH OF THE BLANKET.
4. ROLL RECP's EITHER (A.) DOWN THE SHORELINE FOR LONG BANKS, (TOP TO BOTTOM) OR (B.) HORIZONTALLY ACROSS
THE SHORELINE SLOPE. RECP's WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP's MUST
BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE
PATTERN GUIDE. WHEN USING THE DOT SYSTEM'", STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS
CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
5. THE EDGES OF ALL HORIZONTAL AND VERTICAL SEAMS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM)
OVERLAP.
NOTE:
* SEAM OVERLAP SHOULD BE SHINGLED ACCORDING TO PREDOMINANT EROSIVE ACTION.
6. THE EDGE OF THE BLANKET AT OR BELOW NORMAL WATER LEVEL MUST BE ANCHORED BY PLACING THE STAPLES/STAKES
IN A 12" (30 CM) DEEP X 6" (15 CM) WIDE ANCHOR TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES
SPACED APPROXIMATELY 12" (30 CM) APART IN THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING (STONE OR
SOIL MAY BE USED AS BACKFILL.)
NOTE:
* IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY
TO PROPERLY ANCHOR THE RECP's.
Z
3:I
FUEL OIL TANK /
(DOUBLE WALL) -CONCRETE WASH
OUT AREA
CON off,
� STRUCT
DUMPSTER e
m
LINE WITH GEOTEXTILE WOVEN FABRIC
#53 STONE
FUELING & VEHICLE MAINTENANCE AREA
SECTION 1 11-1 11
NOT -TO -SCALE
POSTING
SIGN
LOCATION
6" MIN.
10'-011
2'-011
I oQQQ �}5'-0"
Q c�Q
o
00 6%8" RIP -RAP
HANDLAQ QOVER GEO E TILE AB�o
c
cQ
C)
5,_0„
C`61'j
EQW�510_
� ��
3'-0"
RIP -RAP DETAIL
NOT-TO-SCALT.
CHANNEL INSTALLATION
........
`.. /
l
r
\\
/ J
\'1
(
4„ (10 CM)
_ __ __ \ \• \\
�1 __ _ _ _ ______ ___
-_ :__ --_
?"-5"
CM - 12.5 CM)
1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE RECP's IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" 30 CM) OF RECP's
EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP's WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM APART IN THE
BOTTOM OF THE TRENCH. BACKFILL AND COMAPCT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12' (30 CM) PORTION OF
RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM)
ACROSS THE WIDTH OF THE RECP's.
3. ROLL CENTER RECP's IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. RECP's WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL
RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE.
WHEN USING THE DOT SYSTEM'", STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. PLACE CONSECUTIVE RECP's END OVER END (SHINGLE STYLE) WITH A 4" - 6" (10 CM -15 CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM)
APART AND 4" (10 CM) ON CENTER TO SECURE RECP's.
5. FULL LENGTH EDGE OF RECP's AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM)
DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. ADJACENT RECP's MUST BE OVERLAPPED APPROXIMATELY 2" - 5" (5 CM -12.5 CM) (DEPENDING ON RECP's TYPE) AND STAPLED.
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M - 12 M) INTERVALS. USE A DOUBLE ROW OF STAPLES
STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL.
B. THE TERMINAL END OF THE RECP's MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM)
WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
NOTE:
* IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE RECP's.
NOTE:
A] CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED
�B IF NECESSARY TO ALLOW STAPLES TO SECURE THE
C A. OVERLAPS AND SEAMS CRITICAL POINTS ALONG THE CHANNEL SURFACE.
B. PROJECTED WATER LINE
C. CHANNEL BOTTOM/SIDE ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE
SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY
BE NECESSARY TO PROPERLY ANCHOR THE RECP's.
SLOPE INSTALLATION
—2"-5"
(5cm-12.5cm)
—12"—
(30 cm)
(15 cm)
........ v 1-6"-1 O
O ,
-------- --- --- --- --- -_ --- -----_ ----- --- - \ \
-------------
--------------
--------------
-----------------------------------------
1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION
OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL—O—SEED DO NOT SEED PREPARED AREA. CELL—O—SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP's IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH
WITH APPROXIMATELY 12" (30cm) OF RECP's EXTENDED BEYOND THE UP —SLOPE PORTION OF THE TRENCH. ANCHOR THE
RECP's WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM)
PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF
STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE RECP's.
3. ROLL THE RECP's (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP's WILL UNROLL WITH APPROPRIATE SIDE
AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES
IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEMTM STAPLES/STAKES
SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING
ON RECP's TYPE.
5. CONSECUTIVE RECP's SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE
3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE
RECP's WIDTH.
NOTE:
*IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO
PROPERLY SECURE THE RECP's.
STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN
GREEN EROSION CONTROL BLANKETS. STAPLE
PATTERNS WILL VARY DEPENDING UPON SLOPE
LENGTH, SLOPE GRADE, SOIL TYPE AND AVERAGE
ANNUAL RAINFALL.
C
B
C
C
B
C
D
A
A
B
D
275
250
225
200
F 175
W 150
4
125
OW
j 100
75
50
25
FT.
4:1 3:1 2:1 I:I LOW MF.D HIGH
FLOW FLOW
CHANNF.i. CHANNEL
AND
SLOPE GRADIENT SHORELINE
3' 2' 2'
6' 6' 4' 4'
3' _x «— —x x x-
3' x— —x 4' 20„
fxI 1 1/2' I 1-I/2' —
3' — x x x x it
A B � C x x D:
x x x
x x x
1 STAPLE 1-1/2 STAPLES 2 STAPLES 3.5 STAPLES
PER SQ. YD. PER SQ. YD. PER SQ. YD. PER SQ. YD.
EROSION CONTROL BLANKET
STAPLE PATTERN GUIDE
,No`` STOEPpF�'�•,.
-° No.� s-
19358
0 STATE OF 'J
"'I", '96NAL E'�oo�,
w
°zoo
q wZ4
¢
A 7 O
z
O W IT
Q �
3z�0 Q
OvJ� U
O
MCI
zW
w
� J
zW
i
z�
9z
z
00 W
O
gQI
a(
vn
0
N CV
co �
co Lf'1
Z � M
O 12
w
Ln
Q c
00
L
CD M
7�
a �
Lu
L
2
l:l
V 11
Q
�-+
I --I
z
W
�
�
1'�
O
z
•
O
�
N
7
O
M--�I
� 1l,
� ll
F—�
ct
V
O
�—I
W
W
F�
�
W
W
O
Q
�
U
DRAWN BY:
ADG
CHECKED BY:
BAH
SHEET NO.
C305
S & A JOB NO.
60160HAM-S2