Loading...
HomeMy WebLinkAboutMisc infoThe purpose of this Building Guide is to help facilitate the plan review process The majority of permit applications are processed with little delay. The submitted documents will help determine if the project is in compliance with building safety codes, zoning ordinances and other applicable laws. 1 Car n 2 Car CH 3 Car Other n Attached Sq. Footage Rough In and Final Inspection Required Detached Sq. Footage Rough In and Final Inspection can be combined if garage is not dry walled. Manufactured trusses Yes D No d If manufactured trusses are used, truss diagrams must be included with the building plans, for all trusses being used. Truss diagrams must be STAMPED with the seal of the registered architect or engineer who is responsible for that design. Monolithic pour may be used if structure is less than 721 S.F. and more than 6' from the primary structure (If less than 6' to the structure, the footings shall be 30" below finished grade) and meet current zoning and set back requirements. Monolithic Footings 721 Square Feet Maximum 6x6- w2.9 welded wire fabric or equivalent is required when monolithic slab footing system is used. One story unless otherwise approved by the building official. (Fire Prevention and Building Safety Commission; 675 IAC 14-4.3-26) □ □ 8" Wx 18" Dor 12" Wx 12" D