Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ALB36 Second Floor System
Architectural Drawings Prepared By: Structural Drawings Prepared By:84 LumberMike T LeeDrees IndyALB-36RevDrees HomesBy Date Comments Drawn By: GL Checked By: Model Ash Lawn FJob # 2020-1067GL Sheet 2 of 2 A complete Javelin® framing plan requires the Trus Joist Installation Guide See the Trus Joist Installation Guide for Product Trademark Information Second Floor System Scale: 1/4" = 1'0"These placement plans have been developed for the specificationof products based on project information provided. This service is solelyintended for product application assurance; and, is not intended tocircumvent the need for a design professional as determined by thebuilding code. The designer of record and/or builder/framer is responsibleto assure these drawings are compatible with the overall project.TJI 210 TJI 360 TJI 560 Joists by Series Kitchen Island Mechanical Chase Hatch Legend Framing Connector Summary PlotID Qty Manuf Product Design Method Skew Backer Blks Filler Web Stiff H1 1 Simpson BA1.81/11.88X SKR45 Designed 45 (R) No No No H2 1 Simpson HUC410 Designed - No No No H3 1 Simpson HUS1.81/10 Designed - No No No H4 53 Simpson IUS2.06/11.88 Designed - No No No H5 10 Simpson IUS2.37/11.88 Designed - No No No H6 6 User IUS2.06/11.88 User Defined - Not Required No Not Required H7 1 User IUS2.37/11.88 User Defined - Not Required No Not Required H8 1 Simpson SUR2.1/11 Designed 45 (R) No No No Products PlotID Length Product Plies Net Qty F44' 44' 0" 11 7/8" TJI 210 joist 1 6 F32' 32' 0" 11 7/8" TJI 210 joist 1 2 F30' 30' 0" 11 7/8" TJI 210 joist 1 1 F24' 24' 0" 11 7/8" TJI 210 joist 1 2 F20' 20' 0" 11 7/8" TJI 210 joist 1 12 F18' 18' 0" 11 7/8" TJI 210 joist 1 4 F14' 14' 0" 11 7/8" TJI 210 joist 1 10 F4' 4' 0" 11 7/8" TJI 210 joist 1 10 F2' 2' 0" 11 7/8" TJI 210 joist 1 36 R18' 18' 0" 11 7/8" TJI 360 joist 1 6 X30' 30' 0" 11 7/8" TJI 560 joist 1 2 M1-2 16' 0" 1 3/4" x 16" 2.0E Microllam LVL 2 2 TS1-2 32' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 TS2-2 18' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 4 TS3 14' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 3 TS4-2 12' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 TS5-2 8' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 TS6 4' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 2 STRm1 16' 0" 1 1/8" x 11 7/8" TJ Rim Board 1 11 Accessories PlotID Length Product Plies Net Qty 9 1/8" 7/8" x 2 5/16" Web Stiffeners 1 2 9 1/8" 3/4" x 2 5/16" Web Stiffeners 1 12 23/32"x4'x8' OSB Sheathing (48/24) 1 56 Blocking PlotID Length Product Plies Net Qty FBk1 2' 0" 11 7/8" TJI 210 joist 1 1 FBk2 2' 0" 11 7/8" TJI 210 joist 1 2 FBk2 1' 6" 11 7/8" TJI 210 joist 1 49 FBk3 1' 6" 11 7/8" TJI 210 joist 1 1 FBk2 1' 0" 11 7/8" TJI 210 joist 1 1 FBk3 1' 0" 11 7/8" TJI 210 joist 1 3 FBk1 6" 11 7/8" TJI 210 joist 1 1 FBk2 6" 11 7/8" TJI 210 joist 1 2 FBk3 6" 11 7/8" TJI 210 joist 1 1 XBk1 1' 6" 11 7/8" TJI 560 joist 1 3 LEVEL NOTES Current Date: 9/28/2020 File Name: 2020-1067GL Drees Indy, ALB-36.jvl Level Name: Second Floor System Building Code - Design Methodology: IBC 2006 Members with Design Overridden: TJ-Pro Rating (Weighted Average): 47 Minimum Level TJ - Pro Rating & Joist: TJ-Pro rating = 37, joist = F18'(i54878) Maximum Level TJ - Pro Rating & Joist: TJ-Pro rating = 57, joist = F14'(i54810) FLOOR Floor Container: FC29 Use/Occupancy: ResidentialLivingAreas Floor Area Loading is: 40.0 lb/ft² Live Load & 10.0 lb/ft² Dead Load Maximum Allowed Deflection: L/480 Live Load & L/240 Total Load TJ-Pro Rating Information: Weighted Average: 47 Directly Applied Ceiling: Gypsum 1/2" Decking Attachment: Glue and Nail Decking Material: 23/32"x4'x8' OSB Sheathing (48/24) Perpendicular Partition: No Strapping at max 8' o.c.: None Blocking at max 8' o.c.: No Poured Flooring: No 11-7/8" TJI 19.2" oc spacing 11-7/8" TJI 19.2" oc spacing 11-7/8" TJI 19.2" oc spacing 11-7/8" TJI 19.2" oc spacing 11-7/8" TJI 19.2" oc spacingA3 A3 A3 CS A3 A3 B1 E1 E1 E1 E1 E1 B4 B4 B4 B1 B1 B1 E1 E1 E1 B1 B4 B1 TS5-2 TS2-2M1-2 Dropped BBO TS4-2 F32'F14'STRm1STRm1STRm1 STRm1 STRm1 STRm1R18'FBk2 STRm1BBBODropped BBO STRm1 Dropped BBO3' 10 1/2"F14' F30'A313' 0 1/2" Dropped LVL 6' 4 1/2" 6' 4 1/2" 4' 4 1/2" STRm1F14'FBk2 11' 11" 11' 11" STRm1TS311' 4 1/2"TS6H315' 5" 5' 1 1/2" FBk2STRm1STRm1STRm1STRm1 STRm1STRm1TS1-2STRm1 H4 TS6STRm1 H8H5 FBk2TS3 STRm1 F32'F14' FBk2FBk2FBk2 FBk3 TS3 F2'FBk2FBk1FBk31' 2 11/16"6 3/16" 14' 4 1/2" 3' 0" 12' 0" 3' 0" 9' 0" 3' 0"3' 0"9' 0" 4' 0"30' 6 1/2"21' 8 1/2"18' 0"H2H7 FBk2TS2-2H1XBk1 Toilet Toilet 1' 9 3/16"1' 5 3/16"Shower Tub 1' 3 3/16" 1' 7 3/16" 4" 2' 0" 2' 0" 2' 0" 2' 11 7/16" F14' F44' R18' F20' F20' F4' F18' F24'F2'F2' F2'F4'X30' H6 H4 H4H4 H4H5 H5 H4 H4 H4H48" Bearing Required Wall must be bearing for acceptable floor performance 10/23/20