Loading...
HomeMy WebLinkAboutSU1_Storm Sewer PlanPROPOSED 50' DRAINAGE& UTILITY EASEMENTP2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P4P4 P3 P3 P4 P4 P3 P3 P4 P4 P3 P3 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 G G G G G G GG G G G G G G G G G G G G GG G G G GG G GFP FP FPFP FP FPFP G G G G G G G G G G G G G G G G G G G G G G G G 78 LF OF 30" RCP @ 0.40% 220 LF OF 30" RCP @ 0.17%151 LF OF 30" RCP @ 0.35%236 LF OF 30" RCP @ 0.30%1 28 L F OF 1 8" RCP @ 0.3 0%238 LF OF 15" RCP @ 0.30%1 1 1 1 2 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 14 1 9 11 10 7 12 13 14 15 17 18 180 LF OF 12" RCP @ 0.53%1 1 1 38 LF OF 6" HDPE @ 5.08% 20 786 784 785 785784 785 786 787 788 789 789 788 787 786 785 783783 784783 783782783782781780780781782783 779 781 782 783 778779777776782780781778779775 777 776 780780 16 16 16 1 5 7 6 1 1 7 68 1 16 19 98 LF OF 6" PVC @ 1.00%98 LF OF 6" PVC @ 1.00%98 LF OF 6" PVC @ 1.00%98 LF OF 6" HDPE @ 1.00% 98 LF OF 6" HDPE @ 1.00% ST-202ST-203 ST-101 ST-102 ST-204 ST-200 ST-201 ST-301 ST-CO 1 RIM. = 773.44' INV. 772.92 (N) INV. 772.92 (S) ST-300 RIM. = 777.10' INV. 771.00 (N) INV. 771.00 (E) INV. 771.00 (S) ST-CO 5 RIM. = 773.64' INV. 773.12 (W) ST-CO 2 RIM. = 774.42' INV. 773.90 (N) INV. 773.90 (S) ST-106 ST-BMP-1 ST-105 ST-CO 3 RIM. = 775.40' INV. 774.88 (N) INV. 774.88 (S) ST-CO 4 RIM. = 776.38' INV. 775.86 (S) ST-103 34 LF OF 10" PVC @ 0.50%21 0 LF OF 24 " RCP @ 0.26% 18 LF OF 30" HDPE @ 0.40% 62 LF OF 6" HDPE @ 3.41% 235 LF OF 24" RCP @ 0.30%235 LF OF 24" RCP @ 0.30% 224 LF OF 18" RCP @ 0.30% ST-104 13 LF OF 30" HDPE @ 1.14% 21 21 16 75 LF OF 12" RCP @ 0.30% ST-202A ST-501 275 LF OF 15" RCP @ 0.50%ST-502 3 GENERAL NOTES 1. SEE SHEET G0.1 FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS. 2. REFER TO SURVEY SHEET FOR BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION. 3. REFER TO LANDSCAPE PLANS FOR PLANTINGS. 3. SEE SHEET SU2.3 FOR SANITARY PIPE INSTALLATION DETAILS. 4. SEE SHEET SU3.1 FOR WATER LINE INSTALLATION DETAILS. 5. SEE SHEET SU2.1 FOR STORM PIPE INSTALLATION DETAILS 6. ALL MANHOLES AND INLETS MUST BE PRE-STAMPED WITH "NO DUMPING DRAINS TO WATERWAY". SEE DETAIL CT-6 ON SHEET SU2.5. 7. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 8. ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE AND DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TO ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL BE BORNE BY THE DEVELOPER. 9. ALL UNDERDRAINS NEED TO BE 6", DUAL-WALLED, HDPE, SLOTTED PIPES. KEYNOTES 1 STORM SEWER CLEANOUT - SEE DETAIL ST-4/SU2.1 STORM LINE CROSSING/SANITARY SEWER LINE - 18" PVC STORM INV. EL. = 778.15' 6" PVC SANITARY INV. EL. = 778.98' (T/PIPE = 779.53') RIPRAP AT END SECTION - SEE DETAIL F/G4.2 DOWNSPOUT LOCATION - SEE DETAIL G ON SHEET SU2.4 11' OF 15" PVC @ 1.0% SLOPE 126' OF 12" PVC @ 1.00% SLOPE 64' OF 12" PVC @ 1.0% SLOPE 11' OF 18" PVC @ 1.0% SLOPE 64' OF 8" PVC @ 1.5% SLOPE 29' OF 12" PVC @ 5.0% SLOPE 128' OF 12" PVC @ 1.0% SLOPE 190' OF 15" PVC @ 1.0% SLOPE 24' OF 18" PVC @ 1.0% SLOPE 140' OF 8" PVC @ 1.0% SLOPE 8' OF 8" PVC @ 1.0% SLOPE UNDERDRAIN - 6" DOUBLE WALLED PIPE, PERFORATED HANCOR Hi-Q, TYPE 4 PIPE OR EQUIVALENT - SEE DETAIL B/SU2.4 10' OF 6" PVC CONNECT TO BLDG. PERIMETER DRAIN. SEE SEE STRUCTURAL FOR PERIMETER DRAIN INFORMATION. GAS METER - SEE MEP PLANS OUTLET CONTROL STRUCTURE - SEE DETAIL F/SU2.4 FOR ADDITIONAL INFORMATION AQUA-SWIRL BMP - SEE DETAIL A/SU2.4 FOR SIZE AND INVERT INFORMATION. 12'-WIDE, STABILIZED GRAVEL ACCESS PATH 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! LEGEND CLEANOUT GAS LINE STORM SEWER MANHOLE / INLET WATER LINE FIRE PROTECTION LINE FLOOD ROUTING RIP RAP SCOUR PROTECTION SURVEY INFORMATION FLOOD INFORMATION: The described real estate lies within Zone X (Unshaded) as plotted by scale on the Federal Emergency Management Agency, National Flood Insurance Program, FIRM Flood Insurance Rate Map for Community Number 180081, Map Number 18057C0227G, effective November 19, 2014. SEE SURVEY SHEETS (4 TOTAL) BY DLDS DATED APRIL 18, 2016 FOR SURVEY INFORMATION. STORM SEWER PIPE AND STRUCTURE NOTE: SEE SHEET SU1.1 FOR STORM STRUCTURE TABLE. SEE SHEET SU1.3 FOR STORM PROFILE. SITE ADDRESS: 5459 EAST MAIN STREET CARMEL, IN 46033 DEPARTMENT OF PLANNING & DEVELOPMENT ADDRESS: ONE CIVIC SQUARE CARMEL, IN 46032 STORM STRUCTURE TABLE Str. 101 102 103 104 105 106 200 201 202A 202 203 204 300 301 501 502 Rim 782.74 782.59 782.59 783.22 783.56 778.59 782.00 781.50 782.00 783.44 783.35 783.09 777.10 771.30 783.00 778.64 Inverts (SW) 10" PVC INV. = 779.65 (W) 24" RCP INV. = 777.99 (E) 24" RCP INV. = 777.44 (S) 18" PVC INV. = 779.70 (W) 30" RCP INV. = 777.30 (E) 30" RCP INV. = 776.92 (S) 15" PVC INV. = 779.70 (W) 30" RCP INV. = 776.81 (E) 30" RCP INV. = 776.50 (S) 30" RCP INV. = 776.40 (N) 30" RCP INV. = 775.87 (S) 30" RCP INV. = 776.21 (E) 6" PVC INV. = 779.50 (W) 30" HDPE INV. = 774.12 (E) 30" HDPE INV. = 773.80 (S) 15" RCP INV. = 779.78 (N) 15" RCP INV. = 779.07 (SW) 18" RCP INV. = 778.97 (W) 12" RCP INV. = 778.82 (NE) 18" RCP INV. = 778.59 (N) 8" PVC INV. = 779.20 (E) 12" RCP INV. = 778.60 (W) 18" RCP INV. = 778.49 (E) 18" RCP INV. = 777.82 (N) 18" PVC INV. = 780.35 (W) 24" RCP INV. = 777.72 (E) 24" RCP INV. = 777.02 (NE) 15" PVC INV. = 779.10 (N) 30" RCP INV. = 776.92 (N) 6" HDPE INV. = 771.00 (E) 6" HDPE INV. = 771.00 (S) 12" RCP INV. = 771.00 (N) 12" RCP INV. = 770.05 (S) 15" RCP INV. = 778.50 (N) 15" RCP INV. = 777.12 Casting R-2502 R-2502 R-2502 R-2502 R-1772 N/A R-2502 R-2502 ??? R-1772 R-1772 R-1772 R-3405 N/A Standard ??? Detail A/SU2.1 A/SU2.1 B/SU2.1 B/SU2.1 B/SU2.1 C/SU2.1 A/SU2.1 A/SU2.1 Standard A/SU2.1 A/SU2.1 B/SU2.1 F/SU2.4 C/SU2.1 Standard ??? Str. Size 4' DIA. 4' DIA. 5' DIA. 5' DIA. 5' DIA. (2' SUMP) N/A 4' DIA. 4' DIA. Standard 4' DIA. 4' DIA. 6' DIA. 4' DIA. N/A Standard ??? 15" DIA. 2' X 2' BOX 12" DIA. R-3472 R-4215-C A/SU2.1 N/A 15" DIA. C/SU2.1 PIPE TABLE Downstream to Upstream Pipe Run ST-102 to ST-101 ST-103 to ST-102 ST-104 to ST-103 ST-105 to ST-104 ST-105 to ST-204 ST-106 to ST-BMP-1 ST-201 to ST-200 ST-202 to ST-201 ST-202A to ST-202 ST-203 to ST-202 ST-204 to ST-203 ST-301 to ST-300 ST-501 to ST-502 ST-BMP-1 to ST-105 Size 24" RCP 30" RCP 30" RCP 30" RCP 30" RCP 30" HDPE 15" RCP 18" RCP 12" RCP 18" RCP 24" RCP 12" RCP 15" RCP 30" HDPE Length 210' 220' 78' 151' 236' 18' 238' 128' 75' 224' 235' 180' 275' 13' Slope 0.26% 0.17% 0.40% 0.35% 0.30% 0.40% 0.30% 0.30% 0.30% 0.30% 0.30% 0.53% 0.50% 1.14% SITE LAYOUT PLAN SCALE: 1"= 40'N 40 1200 40 80 PLANNORTHN WS ECOPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT 6/13/2019 3:21:38 PM\\data1\citrixprofiles$\amiller\My Documents\218052.00_ARCH_amiller.rvtPROJECT NUMBER: 2019199.00 INDOOR FACILITY AT BADGER FIELDS CLAY TOWNSHIP 5459 E MAIN STREET CARMEL, INDIANA PROJECT ISSUE DATE: August 23, 2019 DRAWN BY: MTP REV. NO. DESCRIPTION DATE 11300453 SOI STATE OF ORPFE S NEER N LA E N G IANAINIDERDAHC IIGS No. TERE D A C NIK.N DTAC COMMENTS 09/06/20191 TAC COMMENTS 12/03/20192 TAC COMMENTS 01/10/20203 TAC COMMENTS 03/18/20204 STORM SEWER PLAN SU1.1 NEW BUILDING FFE = 784.50' 10/22/20