Loading...
HomeMy WebLinkAboutG2_Site PlanFUTURE SOCCER FIELD 29.9' 34' 81' 443'22 SPACES @ 9'-0" = 198'19' 28' 19' 19' 24'30' 28' 19' R6'18' 25' 22' 24' 35' 7' 18 SPACES @ 9'-0" = 162' 20' 8'8' 567' R3'36.2' 5'18' 38.5'8'11' 5'38.5'8' 11' 5' 271.90'25' 19' 19' R6' R6' R35' 96' 8' 8'29 SPACES @ 9'-0" = 261'2 @ 8'= 16'2 @ 8'= 16'2 @ 8'= 16' 2 @ 8'= 16' 21.2'3.9'14' 22.7'19'7'R5' R6' R6' R6' R6' R6'18' 36' 18'5'R5' R5' R10' 11' 5' R35' R10' 6 6TYP. TYP. PROPOSED 50' DRAINAGE& UTILITY EASEMENT24.00'1 11 13 13 13 14 10 5 13 17 17 1313 13 10 1 9 10 5 13 14 15 15 12 1 1 4 16 13 17 10 14 15 14 15 8 14 8 15 15 14 14 14 15 15 4 4 17 15 15 4 1 5 10 13 7 10 10 25 1 1 17 2 5 5 5 5 5 4 101010 10 10 10 1010 10 33 10 32 5 5 5 5 5 5 37 37 37 22 34 VARIES 39 40 39 PHASE 1 PAVING LIMITS LIMITS OF NEW PAVING 39 120.00'27 27 LIMITS OF NEW PARKING LOT CONSTRUCTION 35.0'12.0'1 2 GENERAL NOTES 1. SEE SHEET G1.0 FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS. 2. REFER TO SURVEY SHEET FOR BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION. 3. REFER TO LANDSCAPE PLANS FOR PLANTINGS. 4. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED /REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 5. ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. KEYNOTES ASPHALT PAVEMENT - SEE DETAIL A ON SHEET G6.1 ASPHALT TO ASPHALT INTERFACE - SEE DETAIL D ON SHEET G6.1 SAWCUT EXISTING EDGE OF ASPHALT MONOLITHIC CURB & WALK - SEE DETAIL G ON SHEET G6.1 CONCRETE CURB - SEE DETAIL J ON SHEET G6.1 EXPANSION JOINT w/SEALANT- SEE DETAIL E ON SHEET G6.1 (TYP.) CONTROL JOINT - SEE DETAIL C & I ON SHEET G6.1 (TYP.) HVAC UNIT PAD - SEE DETAIL H ON SHEET G6.1 TRANSFORMER PAD - SEE DETAIL H ON SHEET G6.1 LANDSCAPE AREA - SEE LANDSCAPE PLAN DETENTION POND - SEE GRADING PLAN DUMPSTER ENCLOSURE - SEE ARCHITECTURAL PLANS NEW LIGHT POLE & BASE - SEE ELECTRICAL PLANS ASPHALT PATH - SEE DETAIL R ON SHEET G6.1 CONCRETE STOOP - SEE DETAIL F ON SHEET G6.1 CONCRETE BOLLARD - SEE DETAIL B ON SHEET G6.1 4" WIDE WHITE LINE (TYPICAL) 4" WIDE BLUE LINE (TYPICAL) 4" WIDE BLUE LINES @ 2'-0" O.C. DIAGONALLY - SEE DETAIL P ON SHEET G6.1 PAINTED ADA SYMBOL - SEE DETAIL O ON SHEET G6.1 (TYP.) ADA PARKING SIGN (TYPICAL AT EACH ADA PARKING SPACE) - SEE DETAIL N ON SHEET G6.1 PRECAST PARKING BUMPER - SEE DETAIL L ON SHEET G6.1 KEYNOTE HAS BEEN REMOVED ADA RAMP - SEE DETAIL Q ON SHEET G6.1 BICYCLE RACK - SEE DETAIL H ON SHEET L1.3 10' WIDE MULTIUSE PATH. SEE DETAIL R ON SHEET G6.1 HEAVY DUTY ASPHALT PAVEMENT - PAVEMENT SECTION TO COMPLY WITH CITY OF CARMEL STANDARDS FOR PRIMARY ARTERIAL 4" THERMOPLASTIC SOLID WHITE LINE 4" THERMOPLASTIC DOUBLE YELLOW LINE 3', COMPACTED AGGREGATE #37 SHOULDER, 6" DEEP. (SHOULDER SECTION TO COMPLY WITH CITY OF CARMEL STANDARDS) PAVEMENT TURN ARROW - SEE DETAIL M ON SHEET G6.1 PIV - SEE DETAIL A ON SHEET SU4.2 SANITARY LIFT STATION MILL EXISTING PAVEMENT 1.5" AND RESURFACE WITH 1.5" HMA SURFACE, 9.5 mm, PER CITY OF CARMEL STANDARDS. RELOCATED STOP SIGN - SIGN TO COMPLY WITH LATEST EDITION OF THE MUTCD. RELOCATED MAILBOXES TEMPORARY HAUL ROAD. SEE DETAIL S ON SHEET G6.1 RELOCATED SPLIT RAIL FENCE TEMPORARY CONSTRUCTION FENCE 24' ACCESS GATE PUBLIC ACCESS EASEMENT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! SITE LAYOUT PLAN SCALE: 1"= 30'N 30 900 30 60 LEGEND NEW BUILDING NEW ASPHALT PAVEMENT NEW CONCRETE SIDEWALK ASPHALT MILL AND RESURFACE PARKING SUMMARY - PROJECT AREA STANDARD PARKING SPACES 330 ADA PARKING SPACES EXISTING 0 PROPOSED TOTAL PARKING SPACES TOTAL 114 4 4 444 SURFACE AREA SUMMARY IMPERVIOUS AREA ADDED IMPERVIOUS AREAS 1.53 ACRE TOTAL AREA PERVIOUS AREAS EXISTING PERCENTAGE IMPERVIOUS AREA DEVELOPED (BUILDINGS, PAVEMENT, SIDEWALK) (LAWN, LANDSCAPE, STONE, PLAYGROUND) 10.98 ACRE 11.74 ACRE 3.96 ACRE 13.27 ACRE 9.45 ACRE 11.5% 80.3% 13.67 ACRE 21 21 21 22 22 20 20 19 19 19 20 20 24 24 25 5'8' 8'2 @ 8'= 16'2 @ 8' = 16' 18 18 NEW BUILDING 154,272 SFT. BUILD LIMIT LINE - EDGE OF TREELINE AND SLOPE PLANNORTHN WS ECOPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT PROJECT NUMBER: 2019199.00 INDOOR FACILITY AT BADGER FIELDS CLAY TOWNSHIP 5459 E MAIN STREET CARMEL, INDIANA PROJECT ISSUE DATE: 06.08.2020 DRAWN BY: MTP REV. NO. DESCRIPTION DATE 11300453 SOI STATE OF ORPFE S NEER N LA E N G IANAINI DERDAHC IIGS No. TERED A C NIK.N DCONSTRUCTION DOCUMENTS PROJECT MANAGER: CNK ADDENDUM #1 6/25/2020 ADDENDUM #2 7/1/2020 ADDENDUM #3 7/8/2020 COC REVISIONS 10/5/2020 SITE LAYOUT PLAN SOUTH G2.1 19' SEE SHEET G2.2 FOR CONTINUATION 10/22/20