HomeMy WebLinkAboutG4_Erosion Control PlanDEX. BUILDINGEX. BUILDINGPROPOSED 50' DRAINAGE& UTILITY EASEMENTPROPOSED 50' DRAINAGE& UTILITY EASEMENTG G G G G G G G G G G G G GG G G G G G G G G G G G G G G G G G GG GSF SF SF SF SF SF SFSF SF SF SF SF SF SF SFSF SF SF SF SF SFSFSF SF SFCONSTRUCTION LIMITS
1
1
GENERAL NOTESGENERAL NOTESGENERAL NOTES
1.REFER TO SURVEY SHEET FOR BOUNDARY AND TOPOGRAPHIC
SURVEY INFORMATION.
2.SEE LANDSCAPE PLANS FOR PLANTINGS.
3.SEE SHEET G4.2 FOR EROSION CONTROL DETAILS
GENERAL NOTESGENERAL NOTES
1. REFER TO SURVEY SHEET FOR BOUNDARY AND TOPOGRAPHIC
SURVEY INFORMATION.
2. SEE LANDSCAPE PLANS FOR PLANTINGS.
3. SEE SHEET G4.2 FOR EROSION CONTROL DETAILS
4. FLOOD PROTECTION GRADE - THE ELEVATION OF THE
REGULATORY FLOOD PLUS TWO FEET AT ANY GIVEN LOCATION IN
THE SPECIAL FLOOD HAZARD AREA.
5. SEE DETAIL B ON SHEET G4.3 FOR EMERGENCY SPILLWAY DESIGN.
6. DURING CONSTRUCTION KEEP PAVEMENT AND SIDEWALKS CLEAN
AND WORK AREAS IN ORDERLY CONDITION. CLEAN WHEELS OF
VEHICLES BEFORE LEAVING SITE TO AVOID TRACKING SOIL ONTO
ROADS, WALKS, OR OTHER PAVED AREAS.
KEYNOTESKEYNOTESKEYNOTES
1
2
3
4
5
6
7
8
9
10
KEYNOTESKEYNOTES
1 SILT FENCE - SEE DETAIL D/G4.3
INLET SEDIMENT PROTECTION - SEE DETAILS C&E/G4.3
CONSTRUCTION ENTRANCE DRIVE - SEE DETAIL A/G4.3
SEED DISTURBED AREAS
EROSION CONTROL BLANKET - SEE DETAIL I, J, & K/G4.3
PORTABLE TOILET - MUST ANCHORED TO PREVENT SPILLS
CONCRETE WASHOUT - SEE DETAIL B/G4.3
CONSTRUCTION TRAILER
RIPRAP AT END SECTIONS - SEE DETAIL F/G4.3
SWPPP INFORMATION BOARD - SEE DETAIL L/G4.3
ROCK DONUT - SEE DETAIL H/G4.3
SEE LANDSCAPE PLAN FOR PLANTINGS
12'-WIDE, STABILIZED GRAVEL ACCESS PATH
BMP EASEMENT
2
3
4
5
6
7
8
9
10
11
12
13
14
INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY
ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR
WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR
EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES
SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND
WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE
OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY
ALL CONSTRUCTION.
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,
SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND
CAUTION !!
Know what'sbelow.
before you dig.Call
R
Call 811 or 1-800-382-5544 Before You Begin Any Digging Project.
Call 48 hours or 2 working days before you dig.
It's Fast, It's Easy and It's the Law in the state of Indiana!
LEGENDLEGENDLEGEND
AREA OF SEEDING
EROSION CONTROL BLANKET
INLET PROTECTION
CONSTRUCTION ENTRANCE
RIPRAP AT END SECTION
SILT FENCE
LEGENDLEGEND
AREA OF SEEDING
EROSION CONTROL BLANKET
INLET PROTECTION
CONSTRUCTION ENTRANCE
RIPRAP AT END SECTION
SILT FENCE
RIP RAP SCOUR PROTECTION
EROSION CONTROL BLANKET
WITH NATIVE SEEDING
SF
SURVEY INFORMATION
FLOOD INFORMATION:
The described real estate lies within Zone X (Unshaded) as
plotted by scale on the Federal Emergency Management
Agency, National Flood Insurance Program, FIRM Flood
Insurance Rate Map for Community Number 180081, Map
Number 18057C0227G, effective November 19, 2014.
SEE SURVEY SHEETS (4 TOTAL) BY DLDS
DATED APRIL 18, 2016 FOR SURVEY
INFORMATION.
SITE ADDRESS:
5459 EAST MAIN STREET
CARMEL, IN 46033
DEPARTMENT OF PLANNING &
DEVELOPMENT ADDRESS:
ONE CIVIC SQUARE
CARMEL, IN 46032
SITE LAYOUT PLAN
SCALE: 1"= 40'N
40 1200 40 80
PLANNORTHN
WS ECOPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC.
WWW.FHAI.COM
ARCHITECT
CONSULTANT
6/13/2019 3:21:38 PM\\data1\citrixprofiles$\amiller\My Documents\218052.00_ARCH_amiller.rvtPROJECT NUMBER: 2019199.00
INDOOR FACILITY
AT BADGER
FIELDS
CLAY TOWNSHIP
5459 E MAIN STREET
CARMEL, INDIANA
PROJECT ISSUE DATE: August 23, 2019
DRAWN BY: MTP
REV.
NO. DESCRIPTION DATE
11300453
SOI
STATE OF
ORPFE
S NEER N LA E N G IANAINIDERDAHC IIGS
No.
TERE
D
A
C
NIK.N
DTAC COMMENTS 09/06/20191
TAC COMMENTS 12/03/20192
TAC COMMENTS 01/10/20203
TAC COMMENTS 03/18/20204
EROSION CONTROL PLAN
G4.2MATCH LINE - SEE SHEET G4.1
10/22/20