Loading...
HomeMy WebLinkAboutG08_G4.2_Erosion Control PlanEast Main St. (Public)ADEX. BUILDINGEX. BUILDINGPROPOSED 50' DRAINAGE& UTILITY EASEMENTPROPOSED 50' DRAINAGE& UTILITY EASEMENTG G G G G G G G G GG G G G G G G G G G G G G G G G GG GSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF2 SFSF1 CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS W 11 9 2 11 11 CONSTRUCTION LIMITS 5 5 5 4 4 SF SF SF SF SF SF SF SF SF SF 1 1 CONSTRUCTION LIMITS CONSTRUCTION LIMITS 22 1. REFER TO SURVEY SHEET FOR BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION. 2. SEE LANDSCAPE PLANS FOR PLANTINGS. 3. SEE SHEET G4.3 FOR EROSION CONTROL DETAILS 4. FLOOD PROTECTION GRADE - THE ELEVATION OF THE REGULATORY FLOOD PLUS TWO FEET AT ANY GIVEN LOCATION IN THE SPECIAL FLOOD HAZARD AREA. 5. SEE DETAIL B ON SHEET G4.4 FOR EMERGENCY SPILLWAY DESIGN. 6. DURING CONSTRUCTION KEEP PAVEMENT AND SIDEWALKS CLEAN AND WORK AREAS IN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. GENERAL NOTESGENERAL NOTESGENERAL NOTESGENERAL NOTESGENERAL NOTES 1 2 3 4 5 6 7 8 9 10 1 SILT FENCE - SEE DETAIL D/G4.3 INLET SEDIMENT PROTECTION - SEE DETAILS C&E/G4.3 CONSTRUCTION ENTRANCE DRIVE - SEE DETAIL A/G4.3 SEED DISTURBED AREAS EROSION CONTROL BLANKET - SEE DETAIL I, J, & K/G4.3 PORTABLE TOILET - MUST ANCHORED TO PREVENT SPILLS CONCRETE WASHOUT - SEE DETAIL B/G4.3 CONSTRUCTION TRAILER RIPRAP AT END SECTIONS - SEE DETAIL F/G4.3 SWPPP INFORMATION BOARD - SEE DETAIL L/G4.3 ROCK DONUT - SEE DETAIL H/G4.3 SEE LANDSCAPE PLAN FOR PLANTINGS 12'-WIDE, STABILIZED GRAVEL ACCESS PATH BMP EASEMENT SOIL STOCKPILE 2 3 4 5 6 7 8 9 10 11 12 13 14 15 KEYNOTESKEYNOTESKEYNOTESKEYNOTESKEYNOTES INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! EROSION CONTROL PLAN NSCALE: 1"= 40' 40 1200 40 80 AREA OF SEEDING EROSION CONTROL BLANKET INLET PROTECTION CONSTRUCTION ENTRANCE RIPRAP AT END SECTION SILT FENCE AREA OF SEEDING EROSION CONTROL BLANKET INLET PROTECTION CONSTRUCTION ENTRANCE RIPRAP AT END SECTION SILT FENCE RIPRAP SCOUR PROTECTION CONSTRUCTION LIMITS SF LEGENDLEGENDLEGENDLEGENDLEGEND SITE ADDRESS: 5459 EAST MAIN STREET CARMEL, IN 46033 DEPARTMENT OF PLANNING & DEVELOPMENT ADDRESS: ONE CIVIC SQUARE CARMEL, IN 46032 SURVEY INFORMATION The described real estate lies within Zone X (Unshaded) as plotted by scale on the Federal Emergency Management Agency, National Flood Insurance Program, FIRM Flood Insurance Rate Map for Community Number 180081, Map Number 18057C0227G, effective November 19, 2014. SEE SURVEY SHEETS (4 TOTAL) BY DLDS DATED APRIL 18, 2016 FOR SURVEY INFORMATION. STORM SEWER PIPE AND STRUCTURE NOTE: SEE SHEET SU2.5 FOR STORM STRUCTURE TABLE. FLOOD INFORMATION: EROSION CONTROL PLAN G4.2 MATCH LINE - SEE SHEET G4.1 PLANNORTHN WS ECOPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT PROJECT NUMBER: 2019199.00 INDOOR FACILITY AT BADGER FIELDS CLAY TOWNSHIP 5459 E MAIN STREET CARMEL, INDIANA PROJECT ISSUE DATE: 06.08.2020 DRAWN BY: MTP REV. NO. DESCRIPTION DATE 11300453 SOI STATE OF ORPFE S NEER N LA E N G IANAINIDERDAHC IIGS No. TERE DA C NIK.N DCONSTRUCTION DOCUMENTS PROJECT MANAGER: CNK 10/22/20