HomeMy WebLinkAboutG8 - Erosion Control DetailsPUBL IC STRE
E
T
2 0' MI N.
SEE PLANS FOR DIMENSIONS
SEE PLANS FOR
DIMENSIONS
150
'
NOTES:
1. PLACE WHEREVER DIRT OR MUD COULD ENTER PUBLIC
STREETS AND IN CONSTRUCTION TRAFFIC AREAS
REQUIRING DUST CONTROL
2. PLACE ENTRANCE ON LEVEL GROUND WHERE POSSIBLE.
3. PROVIDE A SEDIMENT TRAP OR SILT FENCE BARRIER FOR
RUNOFF FROM THE ENTRANCE AREA
4. LIMIT THE NUMBER OF ACTUAL ENTRANCE
CONSTRUCTED FOR THE SITE
MAINTENANCE:
1. ENTRANCES REQUIRE PERIODIC TOP DRESSING OF
STONE
2. PLACE NEW STONE IN SURFACE VOIDS
3. USE ENTRANCE IN CONJUCTION WITH STREET SWEEPING
4. REMOVE AGGREGATE AND SEPARATE SEDIMENT FOR
DISPOSAL WHEN ENTRANCE BECOMES CLOGGED
5. REPAIR ANY PUBLIC ROAD PAVEMENT DAMAGE CAUSED
BY CONTSTRUCTION TRAFFIC FROM THE SITE
MINIMUM 6" -
#2 STONE
GEOTEXTILECOMPACTED SUBGRADE
20' MIN.
NONE
CONSTRUCTION ENTRANCE - DETAIL A
MINIMUM 6" -
#2 STONE
SEE PLAN
S FOR DIM E N SIO N S
GEOTEXTILE
SILT FENCE INLET PROTECTION - DETAIL C
NONE
MAINTENANCE:
1"x2" HARDWOOD
CROSSBRACING
REFER TO SILT FENCE SECTION FOR EMBEDMENT DETAIL
CATCH BASIN/
DRAINAGE STRUCTURE
NOTE:
36" WIDE NONWOVEN
POLYPROPYLENE
FABRIC
1/2"x2"x24" WOOD
LATH AT EACH
STAKE OVER
FABRIC
2"x2"x36"
HARDWOOD
STAKES WITH
POINTED END - AT
5' O.C.
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT.
2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY.
3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE FENCE OR IS
CAUSING FABRIC TO BULGE.
4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC.
5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT, BRINGING
DISTURBED AREA TO GRADE AND STABILIZE IT.
UNDISTURBED GROUND
NONE
SILT FENCE - DETAIL D
MAINTENANCE:
FLOW
4"12" MIN. 24" MIN.FILTER FABRIC SECURE TO
POSTS WITH 2" LATH IN SWALES
OR AREAS OF CONCENTRATED
FLOW, REINFORCE WITH 14 GA.
X 6" WIRE MESH
FILL WITH COMPACTED SOIL
EMBED FILTER CLOTH
MIN. 6" INTO GROUND
2"X2" HARDWOOD OR 1.33
LB/FT STEEL POST
MAX. SPACING BETWEEN
POSTS IS 5'-0".
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT.
2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY.
3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF OF THE HEIGHT OF THE
FENCE OR IS CAUSING FABRIC TO BULGE.
4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC.
5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT,
BRING DISTURBED AREA TO GRADE AND STABILIZE IT.
MAINTENANCE:
NONE
INLET SILT PROTECTION - DETAIL E
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT.
2. IF FABRIC IS TORN OR DETERIORATED, REPLACE IMMEDIATELY.
3. REMOVE SEDIMENT ON A REGULAR SCHEDULE
4. AFTER DRAINAGE AREA IS STABILIZED, REMOVE SEDIMENT BAG
INLET SEDIMENT BAG - DANDY
BAG OR DANDY BAG ll BY MIRAFI
(OR APPROVED EQUAL).
NO SCALE
ROCK DONUT- DETAIL H
DANDY BAG
GRATE
STANDARD FABRIC IS
AN ORANGE WOVEN
MONOFILAMENT
VELCRO
CLOSUREFLAP FOLDS OVER TO
ENCLOSE GRATE
LIFTING STRAPS
ALLOW EASY
MOVEMENT OF
UNIT WITH GRATE
RIPRAP AT END SECTION - DETAIL F
NONE
COMPACTED SUBGRADE
RIPRAP SHALL EXTEND 5'-0" OUT FROM END SECTION.
NOTE:
GEOTEXTILE
8 OZ./SYD. MIN.
2' (TYP.)24" MAX.12" MIN.1'-0"END SECTION
GEOTEXTILE 8oz/SYD. MIN.
END SECTION
10'-0"
FABRIC SECURING PINS
COMPACTED SUBGRADE
TOE WALL
12"24" 12"6"RIP RAP - DETAIL G
NOTES FOR INSTALLATION
DETAIL O/C405.
BLANKET, SEE STAPLE PATTERN
OR EQUAL. FOR SECURING THE
NORTH AMERICAN GREEN S150
EROSION CONTROL BLANKET
3:1 SLOPE
VARIESFLOWLINE 3:1 SLOPE
PROPOSED GRADE
VARIES, SEE GRADING PLAN
SWALE & DETENTION BASIN EROSION BLANKET - DETAIL K
NONE
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER AND SEED.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP x 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL.
4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH A 5" OVERLAP. USE A DOUBLE ROW OF
STAGGERED STAPLES 4" APART TO SECURE BLANKETS.
5. FULL LENGTH OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED IN 6" DEEP x 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4" OVER THE CENTER BLANKET AND STAPLED.
7. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP x 6" WIDE TRENCH. BACKFILL AND
COMPACT THE TRENCH AFTER STAPLING.
100
SLOPE LENGTH IN FEETWITH ADDITIONAL STAPLES ON SIDE SLOPES.
CHANNEL LININGS UTILIZE STAPLE PATTERN "C"
EROSION CONTROL BLANKET STAPLE PATTERN - DETAIL J
A
4:1
NOTES:
0
50
25
75
SLOPE GRADIENT
3:1
A
2:1 1:1
B B
LINING
CHANNEL
ADDITIONAL STAPLES AS REQUIRED
B
1 STAPLE PER SQ. YD.
275
125
150
175
200
225
250
300 6'3'
1 1/2 STAPLE PER SQ. YD.
GENERAL STAPLE RECOMMENDATIONS
B
C
C C
C
A 3'6'3'
1'-6" 1'-6"
B 3'2 STAPLE PER SQ. YD.
3' 4' 3'
C 4'2'1'-6"1'-6"
1. STAPLE PATTERNS APPLY TO ALL NORTH AMERICAN GREEN EROSION BLANKETS.
2. STAPLE PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL.
3. AT SLOPE LENGTHS GREATER THAN 300 FEET OR WHERE DRAINAGE OVER LARGE AREAS IS DIRECTED ONTO
BLANKETS, STAPLE PATTERN "C" SHALL BE UTILIZED.
4. CHANNEL LININGS REQUIRE A 2' (MIN.) OVERLAP AT LONGITUDINAL JOINTS AND SIDE SLOPES REQUIRE A 6"
(MIN.) OVERLAP. WHERE OVERLAPS OCCUR, THE UPSTREAM BLANKET SHALL OVERLAP THE DOWNSTREAM.
5. IF OTHER THAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INSTALLED, FOLLOW THE
INSTALLATION DIRECTIONS RECOMMENDED BY THAT MANUFACTURER.
4
2
5
1
3A
3B
NOTE:
SLOPE INSTALLATION - DETAIL I
NONE
EROSION CONTROL BLANKET
REFER TO GENERAL STAPLE PATTERN GUIDE FOR
CORRECT STAPLE PATTERN RECOMMENDATIONS FOR
SLOPE INSTALLATIONS.
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER,
AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED
MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN 6" DEEP X 6" WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" OVERLAP.
5. WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE, PLACE BLANKETS END OVER END
(SHINGLE STYLE) WITH APPROXIMATELY 4" OVERLAP. STAPLE THROUGH OVERLAPPED AREA,
APPROXIMATELY 12" APART.
NONE
STANDARD WASHOUT - DETAIL B
NOTES:
1. PROVIDE 10 YD. OR 15 YD. ROLL OFF DUMPSTER FOR STORAGE OF CONCRETE
WASHOUT MATERIAL. SERVICE DUMPSTER WHEN APPROACHING 2/3 FULL USING CARE
SO THAT GREY WATER IS NOT SPILLED OUT WHEN DUMPSTER IS MOVED.
2. PROVIDE LEAKPROOF (10 MIL MIN.) PLASTIC LINER.
3. LOCATE DUMPSTER IN DESIGNATED AND APPROVED LOCATION
NOTE 3
NOTE 1
NOTE 2
NONE
2'1.5'
3'1'
CROSS-SECTION
RIPRAP
RIPRAP
FINISHED GRADE
2" - 3" CLEAN STONE
FILTER BERM
2" - 3" CLEAN STONE
SEDIMENT STORAGE
AREA
MAX DRAINAGE AREA:
5 ACRES
2:1
PIPE
INVERT
FINISHED
GRADE
PIPE INVERT
36" PIPE MAX
RIPRAP HEADWALL
2:1
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT AND REPAIR ANY
DAMAGE IMMEDIATELY.
SILT FENCE
SILT FENCE
COPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC.
WWW.FHAI.COM
ARCHITECT
CONSULTANT
6/13/2019 3:21:38 PM\\data1\citrixprofiles$\amiller\My Documents\218052.00_ARCH_amiller.rvtPROJECT NUMBER: 2019199.00
INDOOR FACILITY
AT BADGER
FIELDS
CLAY TOWNSHIP
5459 E MAIN STREET
CARMEL, INDIANA
PROJECT ISSUE DATE: August 23, 2019
DRAWN BY: MTP
REV.
NO. DESCRIPTION DATE
11300453
SOI
STATE OF
ORPFE
S NEER N LA E N G IANAINIDER
DAHC IIGS
No.
TERE
DA
CNIK.N
DTAC COMMENTS 09/06/20191
EROSION CONTROL
DETAILS
G4.3
SWPPP INFORMATION
SWPPP INFORMATION SIGN - DETAIL L
NONE
10/22/20