Loading...
HomeMy WebLinkAboutSU8 - Storm Details™ Phone (888) 344-9044 Fax (423) 826-2112 2733 Kanasita Drive, Suite 111, Chattanooga, TN 37343 STORMWATER TREATMENT SOLUTIONS www.aquashieldinc.com Aqua-Swirl Concentrator Model AS-10 BYP HDPE Standard Detail AS-10 STD 03/20/15 Scale: Drawn By: Document: Date: JCW 1:30 U.S. Patent No. 6524473 and other Patent Pending Aqua-Swirl High Density Polyethylene (HDPE) Stormwater Treatment System 4 1/2" [114 mm] 1/2" [13 mm] 1" [25 mm] Manhole Frame & Cover Detail NTS For Non-Traffic Areas Only Soil 1" [25 mm] Unless other traffic barriers are present, bollards shall be placed around access riser(s) in non-traffic areas to prevent inadvertent loading by maintenance vehicles. Soil Place small amount of concrete [3,000 psi [20 MPa] (min)] to support and level manhole frame. DO NOT allow manhole frame to rest upon riser. Riser Frame Cover 48" [1219 mm] Min. 12" [305 mm] Wrap Compressible Expansion Joint Material to a minimum 1-inch [25 mm] thickness around top of riser to allow transfer of inadvertent loading from manhole cover to concrete slab. Backfill (90% Proctor Density) Concrete Concrete 8" [203 mm] Gravel Backfill Gravel Backfill A A Inlet Outlet Plan View Internal Baffles Octagonal Base Plate Pipe coupling by Contractor. 12" [305 mm] long Stub-out by Manufacturer. Structural Rail Riser Grade (Rim) Manhole Frame and Cover by Manufacturer. (See Details) Rim elevations to match finished grade. HDPE risers can be field cut by Contractor. Swirl Inlet/Outlet Structural Rail Internal Baffles STORMWATER TREATMENT SOLUTIONS Phone (888) 344-9044 www.aquashieldinc.com ™ Section A-A Backfill (Sand or Crushed Stone) Bedding Undisturbed Soil Gravel Backfill shall extend at least 2 feet [610 mm] outward from Swirl Concentrator and for the full height of the Swirl Concentrator (including riser) extending laterally to undisturbed soils. (See MH Detail Below) * Please see accompanied Aqua-Swirl specification notes. * See Site Plan for actual system orientation. **Orientation may vary from 90°, 180°, or custom angles to meet site conditions. 4 1/2" [114 mm] Gravel Backfill 1/2" [13 mm] 1" [25 mm] Manhole Frame & Cover Detail NTS For H-20 Traffic Loading Areas Concrete Paving 1" [25 mm] Wrap Compressible Expansion Joint Material to a minimum 1-inch [25 mm] thickness around top of riser to allow transfer of traffic loading from manhole cover to concrete slab. Backfill (90% Proctor Density) Support and Level manhole frame with concrete pad. DO NOT allow manhole frame to rest upon HDPE riser. Riser Frame Cover Gravel Backfill Concrete Paving 3" [76 mm] Typ. 12" [305 mm]12" [305 mm] If traffic loading (H-20) is required or anticipated, a concrete pad must be placed over the entire Stormwater Treatment System per concrete design as calculated by Engineer. Sample details of concrete pad available upon request. NO SCALE BMP STR. XXX (AS-10) MANUFACTURER'S - DETAIL A MA X S L O P E = 3 : 1 SIDE VIEW NO SCALE STR. 300 OUTFALL STRUCTURE - DETAIL F POND OUTLET = 774.00 2'x2'x6" THICK CONCRETE SLOPE PROTECTION 6" DIA. UNDERDRAIN PROPOSED 12" DIA. PVC INV. = 772.50' COMPACTED SUBGRADE PRECAST CONCRETE MANHOLE 8"BASE SET ON 6" OF #8 OR #2 STONE COMPACTED SUBGRADE BASE SET ON 6" OF #8 OR #2 STONE NEENAH R-3405 CATCH BASIN FRAME AND GRATE RIM ELEV. = 781.00' 48" DIA. FRONT VIEW INV. = 772.50' 5" DIA. PVC STUB PRECAST CONCRETE ADJUSTING RING AS NEEDED (12" TOTAL RISE MAX.) SEE DETAIL NOTES: MANHOLE CONFORMS TO ASTM C478 JOINTS CONFORM TO ASTM C443 O-RING GASKET ASPHALTIC MASTIC OR BUTYL RUBBER SEAL AT JOINTS 24" DIA. PLASTIC ENCAPSULATED STEEL MANHOLE STEPS INV. = 781.00' INV. = 774.25' NEENAH R-3405 CATCH BASIN FRAME AND GRATE RIM ELEV. = 781.00' GROUT AS REQUIRED 24" DIA. FINISH GRADE 16"TYP.T/BANK = 783.00' INV. = 774.25' 48" DIA. INV. = 781.00' GROUT AS REQUIRED UNDERDRAIN DETAIL - DETAIL B NO SCALE EXTERNAL BAND 6" MIN. #2 STONE PIPE KOR-N-SEAL OR EQUAL EXPANDING BAND BOOT RESILIENT PACKING TO AVOID SHEAR PRECAST MANHOLE BOTTOM EFFECT TYPE 1: SOIL-TIGHT USING NON-SHRINK GROUT AND CORRUGATED PIPE HDPE PIPE UNDERDRAIN NON-SHRINK GROUT (SOIL-TIGHT) PIPE CONNECTION - DETAIL C INLET OR MANHOLE 6" PERFORATED PIPE 4.0 OZ./SYD. GEOTEXTILE #8 WASHED AGGREGATE SLOPE 12"1"VARIESSLOPE 10" MINIMUM6" TOPSOIL - SEE PLAN NO SCALE PIPE CONNECTION TO MANHOLE - DETAIL E NO SCALE ELEV. = 781.00 3:1 3:1 25' (SEE PLAN) SEE EROSION CONTROL SHEET FOR SEEDING TOP OF BANK ELEV. = 783.00 MAX. WATER SURFACE ELEVATION = 78X.XX' EMERGENCY SPILLWAY - DETAIL D NO SCALE NO SCALE DOWNSPOUT BOOT - DETAIL G COORDINATE DOWNSPOUT AND DRAIN LAYOUT WITH FOOTING CONSTRUCTION. PROVIDE CUTOUT IN FOOTING AS SHOWN OR AS REQUIRED. SEE ARCH. & STRUC. PLANS 5'FINISH FLOOR 18"MIN. AA 24"MAX. FOOTING REDUCER AS REQUIRED SEE ARCH. PLANS FOR DOWNSPOUT SIZE C.I. PIPE, SEE PLAN FOR INV. AT BUILDING WALLS 8" HUB/ SPIGOT WITH ZURN MODEL #Z-1445-A-BP IRON TEE W/ BRONZE PLUG NON-SHRINK GROUT FINISH GRADE NON-SHRINK GROUT SECTION TEE-WYE BUILDING WALL NON-SHRINK GROUT (TYPICAL) SEE ARCH. PLANS FOR DOWNSPOUT SIZE PLAN VIEW "A" = DIAMETER AS SHOWN CLEANOUT WHERE INDICATED PERIMETER DRAIN ON THE PLAN SHEET PERIMETER DRAIN BUILDING WALL CUT AND FORM DOWNSPOUT AS REQUIRED AND AS APPROVED TO FIT CLEANOUT HUB. TEE-WYE FOOTING BEYOND CUTOUT 8" PVC 8"DIVISION 33SITE CONTRACTORDIVISION 7CONTRACTORTHE SITE CONTRACTOR SHALL COORDINATE THE CONSTRUCTION OF THE DOWNSPOUTS BOOTS WITH THE STRUCTURAL AND ARCHITECTURAL PLANS. PROVIDE ALL FITTINGS NECESSARY TO COMPLETE THE DETAIL AS SHOWN OR AS REQUIRED. COPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT 6/13/2019 3:21:38 PM\\data1\citrixprofiles$\amiller\My Documents\218052.00_ARCH_amiller.rvtPROJECT NUMBER: 2019199.00 INDOOR FACILITY AT BADGER FIELDS CLAY TOWNSHIP 5459 E MAIN STREET CARMEL, INDIANA PROJECT ISSUE DATE: August 23, 2019 DRAWN BY: MTP REV. NO.DESCRIPTION DATE 11300453 SOI STATE OF ORPF E S NEER N LA E N GIANAINIDER DAHC I IG S No. TERE D A CNIK.N DTAC COMMENTS 09/06/20191 UTILITY DETAILS SU2.4