Loading...
HomeMy WebLinkAboutG11_G4.5_SWPPP1HYDROLOGIC UNIT CODETHE HYDROLOGIC UNIT CODE FOR THIS PROJECT IS: 051202010900302RECEIVING WATERSTHE RECEIVING WATER IS THE WHITE RIVER LOCATED SOUTHEAST OF THE PROJECTSITE.3PRE-CONSTRUCTION AND POST CONSTRUCTION PEAK DISCHARGEQ PRE (10 YR.) = 16.24 cfsQ POST (10 YR.) = 1.35 cfs4STORMWATER DISCHARGEOVERLAND FLOW ROUTES TO NEW PIPING SYSTEM TO A DETENTION POND TO THEWEST OF THE PROPOSED BUILDING. THE STORMWATER THEN DISCHARGES FROMTHIS DETENTION POND SOUTH TO AN EXISTING SWALE.5POTENTIAL DISCHARGES TO GROUND WATERSTORM WATER FROM THE DEVELOPED AREA COULD POSSIBLY INTERACT WITHGROUND WATER SOURCES THROUGH NATURAL PERCOLATION PROCESS.6SOILS MAP AND SOIL DESCRIPTIONTHE SOILS MAP AND SOIL DESCRIPTIONS CAN BE FOUND ON THIS SHEET (G4.5).7POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH CONSTRUCTIONACTIVITIESTHERE IS A POTENTIAL FOR POLLUTANTS ASSOCIATED WITH CONSTRUCTIONMACHINERY INCLUDING DIESEL FUEL, HYDRAULIC FLUID, ENGINE OILS ANDLUBRICANTS, ANTIFREEZE AND OTHER PETROLEUM PRODUCTS. SOIL AND SEDIMENTDISTURBED DURING EARTHWORK ACTIVITIES COULD BE BECOME POLLUTANTS IF THETRANSPORT OF THESE MATERIALS BY WIND AND/OR WATER IS NOT MEDIATED BYEROSION CONTROL MEASURES.8TEMPORARY AND PERMANENT STORMWATER QUALITY MEASURESEACH STORMWATER QUALITY MEASURE IS SHOWN ON THE EROSION CONTROL PLAN(G4.1, G4.2). DETAILS CAN BE FOUND ON THE EROSION CONTROL DETAIL SHEET (G4.3,G4.4).CONSTRUCTION INFORMATION AND SPECIFICATIONS PERTAINING TO THEPLANNED AQUA-SWIRL POST CONSTRUCTION STORM WATER QUALITY MEASURESCAN BE FOUND ON DETAIL SHEET (SU2.4).9SEQUENCE OF STORMWATER QUALITY MEASURE IMPLEMENTATIONCONTRACTOR OR PROJECT OWNER IS TO CONTACT AND SCHEDULE APRE-CONSTRUCTION MEETING WITH THE CITY OF CARMEL STORMWATER UTILITY AT317-571-2441 AT LEAST 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITIES. PRIORTO MOBILIZING HEAVY EQUIPMENT, THE TEMPORARY STONE CONSTRUCTIONENTRANCE SHALL BE INSTALLED, IF REQUIRED (SEE DETAIL ON G4.3). IMMEDIATELYUPON MOBILIZING, THE CONTRACTOR SHALL POST THE NECESSARY PERMITS ANDRULE 5 DOCUMENTATION ON THE SITE. PRIOR TO STARTING EARTHWORKOPERATIONS OR ANY OTHER SOIL DISTURBING ACTIVITY, ALL THE SILT FENCE SHALLBE INSTALLED ALONG WITH THE SILT FENCE INSTALLATION, ALL EXISTING INLETSSHALL BE PROTECTED AS INDICATED ON THE PLAN. TEMPORARY SEEDING, EROSIONCONTROL BLANKET AND RIPRAP SHALL BE INSTALLED AS EARTHWORK ISIMPLEMENTED. EXISTING ASPHALT IN THE VICINITY OF THE PROJECT TO BEROUTINELY CLEANED/SWEPT TO REMOVE SEDIMENT.10SOIL STOCKPILES, BORROW/DISPOSAL AREASA SOIL STOCKPILE WILL BE CREATED NORTH OF PROPOSED BUILDING, SEE SHEETG4.1. ALL DEMOLITION MATERIALS WILL REMOVED FROM SITE AND DISPOSED OF ATAN APPROVED SITE.11TEMPORARY SURFACE STABILIZATIONTEMPORARY SURFACE STABILIZATION IS REQUIRED WHEN DISTURBED AREAS AREEXPECTED TO REMAIN INACTIVE FOR A PERIOD EXCEEDING 15 DAYS. THESE AREASARE PLANNED FOR TEMPORARY SEEDING ACCORDING TO THE SEEDING TABLEPROVIDED ON THE EROSION CONTROL DETAIL SHEET (G4.3).PERMANENT SURFACE STABILIZATIONALL AREAS ARE PLANNED FOR PERMANENT SURFACE COVER INCLUDING PAVEDAREAS, PAVED WALKS, BUILDING ROOF TOPS, OR VEGETATIVE COVER. WHENSEASONAL VARIATIONS PREVENT THE INSTALLATION OF THESE SURFACE COVERS,THE CONTRACTOR SHALL INSTALL MULCHING OR EROSION CONTROL BLANKET OVERVULNERABLE DISTURBED AREAS.12EROSION AND SEDIMENT CONTROL MEASURES BUILDING LOTSTHERE ARE NOT INDIVIDUAL BUILDING LOTS CREATED AS PART OF THIS PROJECT.13MATERIAL HANDLING AND SPILL PREVENTIONSPILL PREVENTION SHALL BE ACCOMPLISHED BY UTILIZING SPILL GUARDS FOREQUIPMENT FUELING AND SERVICING OPERATIONS. SPILL GUARDS SHALL BE 3'X3'X6"AND SHALL BE CONSTRUCTED OF A MATERIAL RESISTANT TO PETROLEUMPRODUCTS. ON-SITE FUEL STORAGE TANKS SHALL HAVE EMERGENCY STORAGECAPACITY DIRECTLY BELOW THE TANK IN CASE OF RUPTURE. ANY HAZARDOUSMATERIAL SPILLAGE SHALL BE COLLECTED AND/OR CLEANED IMMEDIATELY BY ATRAINED INDIVIDUAL AND DISPOSED OF IN ACCORDANCE WITH ALL FEDERAL, STATEAND LOCAL REGULATIONS. ONSITE EROSION CONTROL SUPERVISOR IS TO RECORDALL SPILLS. THE INDIVIDUAL RESPONSIBLE FOR RECORDING THE SPILLS SHALLINCLUDE , AT MINIMUM,THE FOLLOWING INFORMATION: DATE OF SPILL, TYPE OFMATERIAL SPILLED, ESTIMATE AMOUNT OF MATERIAL SPILLED AND THE ACTIONSUSED TO REMEDIATE THE SPILL.CONTACT THE FOLLOWING AGENCIES IN THE EVENT OF A SPILL:DIAL 911 IN RESPONSE TO AN EMERGENCY SPILLIDEM 24-HOUR EMERGENCY SPILL LINE - (888) 233-7745 OR (317) 233-7745CARMEL FIRE DEPARTMENT- (317) 571-2600HAMILTON COUNTY SOIL AND WATER CONSERVATION DISTRICT (317) 773.2181CARMEL STORMWATER DEPARTMENT - (317) 571-244114CONTACT INFORMATIONNAME: KEN ALEXANDERADDRESS: 1016 3RD AVE SW SUITE 200, CARMEL, IN, 46032TELEPHONE: 317-573-6281E-MAIL:KALEXANDER@CTICONSTRUCTIONLLC.COMQUALIFICATIONS: CONSTRUCTION PROJECT MANAGER15CURRENT REVISION DATETHE REVISION DATE CAN BE FOUND ON THIS SHEET (G4.3), IN THE LOWER CORNER OFTHE TITLE BLOCK.1POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH CONSTRUCTION ACTVITIESTHERE IS A POTENTIAL FOR POLLUTANTS ASSOCIATED WITH CONSTRUCTION MACHINERY INCLUDING DIESELFUEL, HYDRAULIC FLUID, ENGINE OILS AND LUBRICANTS, ANTIFREEZE AND OTHER PETROLEUM PRODUCTS.SOIL AND SEDIMENT DISTURBED DURING EARTHWORK ACTIVITIES COULD BE BECOME POLLUTANTS IF THETRANSPORT OF THESE MATERIALS BY WIND AND/OR WATER IS NOT MEDIATED BY EROSION CONTROLMEASURES.2POST-CONSTRUCTION STORMWATER QUALITY MEASURESPOST CONSTRUCTION STORM WATER QUALITY MEASURES INCLUDE AN AQUA-SWIRL STORM WATER QUALITYTREATMENT UNIT (AS-10) AND DRY DETENTION BASIN WITH UNDERDRAINS AND WETLAND SEEDING. SEESEPARATE O&M MANUAL FOR REQUIRED MAINTENANCE OF UNIT AND DRY DETENTION BASIN.3SEQUENCE OF STORMWATER QUALITY MEASURE IMPLEMENTATIONCONTRACTOR OR PROJECT OWNER IS TO CONTACT AND SCHEDULE A PRE-CONSTRUCTION MEETING WITH THECITY OF CARMEL STORMWATER UTILITY AT 317-571-2441 AT LEAST 48 HOURS PRIOR TO ANY LAND DISTURBINGACTIVITIES. PRIOR TO MOBILIZING HEAVY EQUIPMENT, THE TEMPORARY STONE CONSTRUCTION ENTRANCESHALL BE INSTALLED, IF REQUIRED (SEE DETAIL ON G4.3). IMMEDIATELY UPON MOBILIZING, THE CONTRACTORSHALL POST THE NECESSARY PERMITS AND RULE 5 DOCUMENTATION ON THE SITE. PRIOR TO STARTINGEARTHWORK OPERATIONS OR ANY OTHER SOIL DISTURBING ACTIVITY, ALL THE SILT FENCE SHALL BEINSTALLED ALONG WITH THE SILT FENCE INSTALLATION, ALL EXISTING INLETS SHALL BE PROTECTED ASINDICATED ON THE PLAN. TEMPORARY SEEDING, EROSION CONTROL BLANKET AND RIPRAP SHALL BEINSTALLED AS EARTHWORK IS IMPLEMENTED. EXISTING ASPHALT IN THE VICINITY OF THE PROJECT TO BEROUTINELY CLEANED/SWEPT TO REMOVE SEDIMENT.4STORMWATER QUALITY MEASURES TO BE IMPLEMENTED TO PREVENT OR MINIMIZE ADVERSEIMPACTS CONSTRUCTION ENTRANCETHE CONSTRUCTION ENTRANCE SHALL BE LOCATED AT THE ENTRANCE TO THE PROJECT. IF REQUIRED, THEDETAIL CAN BE FOUND ON THE EROSION CONTROL DETAILS SHEET (G4.3). EXISTING ASPHALT IN THE VICINITYOF THE PROJECT TO BE ROUTINELY CLEANED/SWEPT TO REMOVE SEDIMENT. SEDIMENT CONTROL MEASURES FOR SHEET FLOWSILT FENCE SEDIMENT CONTROL MEASURES ARE SHOWN ON THE EROSION CONTROL PLAN (G4.1, G4.2).DETAILS CAN BE FOUND ON THE EROSION CONTROL DETAIL SHEET (G4.3). SEDIMENT CONTROL FOR CONCENTRATED FLOWEROSION CONTROL BLANKET SERVES AS A CONCENTRATED FLOW SEDIMENT CONTROL MEASURE. THESEMEASURES ARE SHOWN ON THE EROSION CONTROL PLAN (G4.1, G4.2). DETAILS CAN BE FOUND ON THEEROSION CONTROL DETAIL SHEET (G4.3). STORM SEWER INLET PROTECTIONSTORMWATER INLET CONTROL MEASURES CONSISTING OF TEMPORARY SEDIMENT BAGS ARE SHOWN ON THEEROSION CONTROL PLAN (G4.1). DETAILS CAN BE FOUND ON THE EROSION CONTROL DETAIL SHEET (G4.3). RUNOFF CONTROL MEASURESRUNOFF CONTROL MEASURES INCLUDE SILT FENCE WHICH IS SHOWN ON THE EROSION CONTROL PLAN (G4.1).DETAILS CAN BE FOUND ON THE EROSION CONTROL DETAIL SHEET (G4.3). STORMWATER OUTLET PROTECTIONSTORMWATER OUTLETS DISCHARGE TO EXISTING STORM SEWER STRUCTURES AND EXISTING SWALES.OUTLETS ARE SHOWN ON THE EROSION CONTROL PLANS (G4.1). DETAILS CAN BE FOUND ON THE EROSIONCONTROL DETAILS SHEET (G4.3). GRADE STABILIZATION STRUCTURESNO GRADE STABILIZATION STRUCTURES ARE REQUIRED FOR THIS PROJECT LOCATION, DIMENSION, SPECIFICATIONS AND DETAILS OF EACH STORMWATER QUALITY MEASUREEACH STORMWATER QUALITY MEASURE IS SHOWN ON THE EROSION CONTROL PLANS AND DETAILS(G4.1, G4.2, G4.3).5O&M MANUAL FOR ALL POST-CONSTRUCTION STORMWATER QUALITY MEASURESREFER TO O&M MANUAL.SWPPP FOR CONSTRUCTION SITESSWPPP FOR POST-CONSTRUCTIONCOPYRIGHT 2019 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTCONSULTANTPROJECT NUMBER: 2019199.00INDOOR FACILITYAT BADGERFIELDSCLAY TOWNSHIP5459 E MAIN STREETCARMEL, INDIANAPROJECT ISSUE DATE: 06.08.2020DRAWN BY: MTPREV.NO.DESCRIPTIONDATE CONSTRUCTION DOCUMENTSPROJECT MANAGER: CNKSWPPPG4.5SOIL TYPESSOILS MAPVICINITY MAPFIRM MAPPROJECT SITEMoC3MmB2MmD2MmD2MmC2OcAMmC2MmB2 - MIAMI SILT LOAM.MIAMI SERIES2 TO 6 PERCENT SLOPES,ERODED. THIS GENTLY SLOPINGSOIL IS ALONG DRAINAGEWAYS THAT CROSS AREAS OFSOMEWHAT POORLY DRAINED CROSBY SOILS; ON SMALLISOLATED KNOLLS ON BROAD, NEARLY LEVEL TILL PLAINS;ON GENTLY ROLLING MORAINES; AND ON NARROW TOBROAD RIDGETOPS. AREAS RANGE FROM 2 TO 200 ACRESIN SIZE. MOST ARE IRREGULARLY SHAPED, BUT SOMEARE LONG OR ROUND. THIS SOIL HAS THE PROFILEDESCRIBED AS REPRESENTATIVE OF THE SERIES. SMALLAREAS THAT HAVE BEEN IN WOODLAND OR PASTURE FORMANY YEARS ARE NOT ERODED.OCA - OCKLEY SILT LOAM 0 TO 2 PERCENT SLOPES THIS WELL DRAINED SOIL HAS AWATERTABLE AT A DEPTH GREATER THAN 40 INCHES ANDIS ON TERRACES. SLOPES ARE 0 TO 2 PERCENT. THENATIVE VEGETATION IS HARDWOODS. THE SURFACELAYER IS SILT LOAM AND HAS MODERATELY LOW ORMODERATE ORGANIC MATTER CONTENT (1.0 TO 3.0PERCENT). PERMEABILITY IS MODERATE (0.6 TO 2 IN/HR)IN THE MOST RESTRICTIVE LAYER ABOVE 60 INCHES.AVAILABLE WATER CAPACITY IS HIGH (9.2 INCHES IN THEUPPER 60 INCHES). THE PH OF THE SURFACE LAYER INNON-LIMED AREAS IS 4.5 TO 6.0OCKLEY SERIESMoC3- MIAMI CLAY LOAM 6 TO 12 PERCENT SLOPES, SEVERELY ERODEDTHIS MODERATELY DRAINED SOIL HAS A SEASONAL HIGHWATER TABLE AT 2.0 TO 3.5 FT AND IS ON SIDE SLOPESAND KNOLLS ON UPLANDS. SLOPES ARE 6 TO 12PERCENT. THE NATIVE VEGETATION IS HARDWOODS.THEIR SURFACE LAYER IS CLAY LOAM AND HAS LOWORGANIC MATTER CONTENT (0.5 TO 1.0 PERCENT).PERMEABILITY IS VERY SLOW (0.06 IN/HR) IN THE MOSTRESTRICTIVE LAYER ABOVE 60 INCHES. AVAILABLEWATER CAPACITY IS LOW (5.7 INCHES IN THE UPPER 60INCHES). THE PH OF THE SURFACE LAYER IN NON-LIMITEDAREAS IS 4.5 TO 5.5. DOUGHTINESS AND WATER EROSIONMANAGEMENT CONCERNS FOR CROP PRODUCTION.EAST MAIN STREETHAZEL DELL PARKWAYEAST 126th STREETPROJECTLOCATIONPROJECTLOCATIONEAST MAIN ST.